Independent advisory for colocation, GPU and data center projects

A reply within one business day

Houston Colocation
Houston Data Centers, 1301 Fannin, Providers and Pricing

Houston colocation offers more room than the tight primary markets, at lower rates, with hurricane and grid planning that matters. We find the Houston space that fits your requirement and negotiate the price, at no cost to you.

Price My Houston Requirement
For companies needing Houston colocation The available space, found for you Paid by the provider, never by you

Houston colocation means renting space, power and connectivity for your own servers in one of the Houston metro's data centers, from the downtown carrier hotel at 1301 Fannin Street to the North Freeway campuses in Greenspoint, the Energy Corridor west of the city and the larger campuses out in Katy. Houston is a secondary market built on energy-industry computing, and that shows in the numbers: CBRE counted about 154 MW of Houston capacity at the end of 2025, and its mid-2025 profile put vacancy at 19.7 percent after a large delivery, far looser than the record-low 1.4 percent across the primary markets. JLL's midyear 2025 report put Houston asking rates at $130 to $160 per kW per month for 1 to 5 MW. Room to place, at rates below the primary hubs, is what makes Houston worth a look, as long as hurricane and grid planning is part of the decision.

HOUSTON RATES
$130 to $160
per kW per month for 1 to 5 MW (JLL, midyear 2025)
HOUSTON CAPACITY
~154 MW
with 28.5 MW under construction (CBRE, H2 2025)
HOUSTON VACANCY
19.7%
mid-2025, after a large delivery, versus 1.4% in primary markets (CBRE)
TEXAS PIPELINE
26 GW
under construction statewide, double Virginia's 13 GW (JLL, midyear 2026)

Sources: CBRE Houston market profile, H1 2025; CBRE H2 2025 capacity and JLL midyear 2026 figures as reported by CinchOps; JLL midyear 2025 pricing as summarized by GoDataCenters; CBRE North America Data Center Trends H1 2026. Figures as of October 2026.

Looking for colocation in Houston? Why talk to us before you call an operator
What is available, found first.
Houston has more room than most markets, but not every building has space at your density on your date. We find which do, including space that is not advertised.
Downtown, north, west or Katy.
Carrier density at 1301 Fannin or room to grow on a suburban campus. The requirement decides, and we match it before you commit.
Storms and the grid, planned in.
Elevation, fuel, generator runtime and where your recovery site should sit, checked with the price, not after.
No cost to you.
The operator you choose pays us from its channel budget. Your rate is not marked up, and you'll hear back within 24 hours.
Houston's reach: Texas in milliseconds, the rest of the country within about 23
Minimum round-trip latency from Houston over fiber, milliseconds
Austin235 km
~2
San Antonio304 km
~3
Dallas362 km
~4
Atlanta1,128 km
~11
Denver1,414 km
~14
Chicago1,516 km
~15
Phoenix1,632 km
~16
Northern Virginia1,933 km
~19
Los Angeles2,206 km
~22
New York2,281 km
~23

MCA calculation from straight-line distance and the speed of light in optical fiber, about 1 ms round trip per 100 km. These are floors; real fiber routes are longer, so test on your own network. Free to cite with a link to this page.

Data Centers in Houston: The Four Submarkets

Houston data centers fall into four areas: the downtown carrier hotel, a dense cluster along the North Freeway, the Energy Corridor west of the city, and larger campuses farther west in Katy.

SubmarketKey facilitiesBest for
Downtown: 1301 Fannin Streetthe carrier hotelNetrality's 25-story building, with more than 40 network operators, Houston's main interconnection pointInterconnection, peering and network-dense deployments
North: Greenspoint and the North Freewaynear Bush IntercontinentalDigital Realty's Digital Houston campus at 12001 to 12245 North Freeway; Switch's Houston facility on Greens Parkway, formerly Data Foundry; FiberTown, Cogent and Lumen; Equinix HO1 about 3 miles east on Aldine Meadows RoadEnterprise colocation with a wide choice of operators and carriers
West: the Energy CorridorBeltway 8 and Westway ParkDataBank's Westway Park campus off Beltway 8 between I-10 and US 290, formerly CyrusOne's Houston West, built for the energy industry's seismic computingHigh-density and compute-heavy deployments, larger footprints
Far west: KatyElement Critical's Houston One campus at 22000 Franz Road: 26 MW on 20 acres, formerly Skybox, now adding a 10 MW high-density hallWholesale, high-density and AI deployments with room to grow

Facility locations from operator materials and public listings, October 2026.

1301 Fannin Street: Houston's Carrier Hotel

1301 Fannin is the center of Houston's networks: a 25-story, 1.1 million square foot downtown tower that Netrality has owned since February 2015, with about 26 MW of power and more than 40 network operators. Most carriers that serve Houston meet in this building, which makes it the place for interconnection, peering and network-heavy deployments, and the reason so many Houston deployments keep at least a small footprint or a cross-connect path here.

25 stories1.1 million sq ftAbout 26 MW40+ network operatorsNetrality since 2015

Like most carrier hotels, 1301 Fannin is built around connectivity rather than density. Larger or denser deployments usually sit on a suburban campus and reach the carriers downtown over a cross-connect or a private wave, which gives you 1301 Fannin's networks without paying carrier hotel rates for every kilowatt.

KEY QUESTION
Do you need to be in 1301 Fannin, or just connected to it? Network operators and peering-heavy deployments usually need to be in the building. Most enterprise and compute deployments only need a fast path to it, which opens up the rest of the Houston market.

Greenspoint and the North Freeway: Digital Realty's Houston Campus

Digital Realty's Digital Houston campus spans 12001 to 12245 North Freeway in Greenspoint, with buildings including IAH10, IAH11, IAH13 and IAH14, offering everything from single cabinets to private suites. The North Freeway is Houston's densest cluster of data centers: Switch's Houston facility on Greens Parkway, which came with Switch's $420 million purchase of Data Foundry, sits within half a mile, alongside FiberTown, Cogent and Lumen. Equinix HO1, the former Verizon site Equinix acquired in 2017, is about 3 miles east on Aldine Meadows Road, with more than 76,500 square feet of colocation space. For a buyer, the cluster means real choice between operators within a few minutes of each other. See the Digital Realty data center guide.

DataBank Houston: The Former CyrusOne Campus

In 2022, DataBank bought four Houston-area data centers from CyrusOne for $670 million, becoming the largest independent data center provider in Houston, with more than 300,000 square feet of raised floor and 42.5 MW of installed critical IT load. The centerpiece is the Westway Park campus, formerly CyrusOne's Houston West, off Beltway 8 between I-10 and US 290 in the Energy Corridor, built as the largest seismic exploration computing campus in the oil and gas industry. That history is why it handles high-density computing better than most Houston space. It carries more than 30 fiber networks, about 3,500 cross-connects, and on-ramps to AWS and Google Cloud.

42.5 MW installed300,000+ sq ft raised floor30+ fiber networksAbout 3,500 cross-connectsAWS and Google on-ramps

Element Critical Houston One: Katy's High-Density Campus

Element Critical's Houston One campus sits on 20 acres at 22000 Franz Road in Katy, with 26 MW across 118,250 square feet. Element Critical bought the site from Skybox Datacenters in 2021, with Skybox continuing to handle wholesale leasing after the sale. Element Critical is now building a 20,000 square foot, 10 MW high-density multi-tenant hall there, launching with 4.5 MW by the fourth quarter of 2026, aimed at enterprise and AI workloads. For dense deployments in Houston, it is one of the few places adding purpose-built capacity now.

26 MW campus20 acres10 MW high-density hallFirst 4.5 MW Q4 2026Formerly Skybox

Houston Data Centers and Providers

OperatorHouston locationBest known for
Netrality1301 Fannin Street, downtownHouston's carrier hotel and main interconnection point
Digital RealtyDigital Houston campus, North Freeway, GreenspointEnterprise colocation from cabinets to private suites
DataBankWestway Park campus in the Energy Corridor, formerly CyrusOne's Houston West, and other former CyrusOne sitesHigh-density and energy-industry computing, cloud on-ramps
EquinixHO1, 1515 Aldine Meadows Road, north HoustonEquinix's interconnection platform in Houston, the former Verizon site acquired in 2017
Switchformerly Data FoundryGreens Parkway, North FreewayA purpose-built facility designed for high power across the floor
Element Criticalformerly SkyboxHouston One, 22000 Franz Road, KatyA 26 MW campus adding a 10 MW high-density hall from Q4 2026
ServerfarmTwo Houston-area data centers, acquired in 2024Large enterprise footprints, including the 350,000 sq ft HTX1
Lumen, Cogent, FiberTownNorth FreewayNetwork-led colocation close to the carriers

From operator materials, public listings and acquisition announcements, October 2026. We hold channel relationships with several of these operators and place with others when the requirement needs them.

Houston Colocation Pricing

JLL's midyear 2025 report put Houston at $130 to $160 per kW per month for 1 to 5 MW, below the roughly $196 average CBRE reported for 250 to 500 kW across the primary markets at the end of 2025. Smaller retail deployments price higher per kW, and the building matters as much as the market.

Room to negotiate: Houston vacancy versus the primary markets
Data center vacancy, first half of 2025
Houstonafter a large delivery
19.7%
Primary marketsrecord low
1.6%

Source: CBRE North America Data Center Trends H1 2025 and its Houston market profile. Primary market vacancy fell further, to 1.4%, by the first half of 2026. Free to cite with a link to this page.

Where it costs most

Downtown carrier space at 1301 Fannin, where you pay for connectivity rather than power, and small retail cabinets, which carry a higher rate per kW than larger blocks anywhere.

Where the value is

The suburban campuses on the North Freeway, in the Energy Corridor and in Katy, where Houston's looser vacancy leaves more room to negotiate than in the primary markets.

What the rate leaves out

Cross-connects, remote hands, setup and escalators, and on metered contracts, electricity priced on the Texas power market. See the colocation pricing guide.

AI and GPU Capacity in Houston

Houston's data center history is high-density computing: the energy industry has run seismic processing clusters here for decades. That heritage means some Houston halls handle denser racks than typical enterprise space, and the market's looser vacancy gives AI deployments more options than the primary hubs. New purpose-built capacity is arriving too, including Element Critical's 10 MW high-density hall in Katy, with its first 4.5 MW due by the fourth quarter of 2026. The questions are the same as anywhere: which hall can deliver your density, whether liquid cooling reaches the rack, and on what date.

Owning your GPU servers

Air-cooled GPU servers at 35 to 70 kW per rack fit more Houston halls; rack-scale liquid-cooled systems need a facility built for them. See AI and GPU colocation.

Renting GPUs instead

For workloads that are bursty or still being proven, rented GPU servers or clusters are live in days, not months. See GPU rental and GPU cluster rental.

Multi-megawatt capacity

Texas's 2025 law on large electricity users, SB 6, gives the state grid operator more control over new loads of 75 MW and above, so very large deployments need early interconnection planning. Most retail and mid-size placements are not affected. See wholesale colocation.

Want Houston pricing for your requirement?
Send cabinets or kilowatts, density and the date. We find the Houston space that fits and price it against what comparable deployments pay, at no cost to you.
Price My Houston Requirement

Houston Disaster Recovery: Hurricanes, Flooding and the Grid

Houston's risks are well known, and the better facilities are built around them. Hurricane Harvey brought record flooding in 2017, and Hurricane Beryl in July 2024 left more than 2 million CenterPoint customers without power. Houston also sits on ERCOT, the Texas grid, which runs largely separate from the rest of the country, as Winter Storm Uri showed in February 2021. None of that rules Houston out. It means five questions belong in every Houston search.

FIVE QUESTIONS FOR ANY HOUSTON FACILITY
What to check before you sign in Houston
1
Elevation and flood zone
The flood zone of the site and the height of the electrical and mechanical equipment, not just the street address.
2
Wind rating
How the building is rated for hurricane winds. Some Houston campuses are built well beyond code; the Skybox-built campus in Katy, for example, has a concrete roof deck rated for winds above 190 mph.
3
Fuel and runtime
Generator runtime at full load, priority fuel delivery contracts, and how many days the site can run without utility power.
4
Staff and access
Ride-out plans for on-site staff, remote hands during a storm, and access when roads flood.
5
Recovery outside the region
A Houston primary should recover outside the Gulf Coast, and ideally outside ERCOT: Denver, Phoenix or Atlanta. See disaster recovery colocation and DRaaS.
PLAIN ANSWER
Houston is a sound place for colocation when the facility is chosen for elevation, fuel and runtime, and when the recovery site sits outside the region. We check all three with the price, before you sign.

Who Houston Colocation Suits

Energy and engineering companies

Seismic processing, reservoir modeling and engineering simulation, the compute-heavy work Houston's data centers grew up serving.

Gulf Coast enterprises

Healthcare, petrochemical, logistics and professional services companies moving off owned server rooms or out of the cloud. See cloud repatriation and HIPAA colocation.

Companies needing a Texas presence

Houston reaches Austin, San Antonio and Dallas within about 4 ms, at rates below the primary hubs. See hybrid cloud.

AI and high-density deployments

More room than the primary markets, and halls with a history of dense computing. See AI and GPU colocation.

Texas Colocation and Other Markets

Houston is one of four Texas colocation markets, with Dallas, Austin and San Antonio, all within about 4 ms of each other on the same grid. Statewide context is on our Texas data centers guide. For recovery outside ERCOT, the nearest options are Atlanta, Denver and Phoenix.

MarketHow it compares with Houston
DallasThe larger Texas market, with more carriers and wholesale supply, about 4 ms away on the same grid. See Dallas colocation
Austin and San AntonioSmaller Texas markets about 2 to 3 ms from Houston, useful for a second Texas site, though on the same grid
DenverA central recovery site outside both the Gulf Coast and ERCOT, about 14 ms away. See Denver colocation
PhoenixA larger, tighter market with low natural-disaster risk, about 16 ms away. See Phoenix colocation
AtlantaThe Southeast hub, about 11 ms away and on a different grid. See Atlanta colocation
Planning a Houston primary and a recovery site?
Send both requirements together. We find space for the Houston primary and an out-of-region recovery site, so you see the full cost before you sign either. The operators you choose pay us, and you'll hear back within 24 hours.
Price Primary and Recovery

Houston Colocation Services: How We Find Space

1

You send the requirement

Cabinets or kilowatts, density, downtown or suburban, connectivity, compliance, recovery needs and the date. One email or one call.

2

We find what is actually available

Across downtown, the North Freeway, the Energy Corridor and Katy, including space that is not advertised, checked for elevation, fuel and runtime.

3

We compare five-year totals

Rate, escalator, cross-connects, setup, remote hands and power billing, side by side, benchmarked against what comparable deployments pay.

4

We negotiate before you sign

Expansion rights, renewal caps and the terms that move the most money, while they are still negotiable. The operator you choose pays us. How a data center broker works.

Frequently Asked Questions

How much does colocation cost in Houston?

JLL's midyear 2025 report put Houston at $130 to $160 per kW per month for 1 to 5 MW, below the roughly $196 per kW average CBRE reported across the primary North American markets at the end of 2025. Smaller retail deployments cost more per kW, downtown carrier space at 1301 Fannin carries a premium, and cross-connects, remote hands and setup come on top of the rate.

Where are the main data centers in Houston, TX?

In four areas: downtown at 1301 Fannin Street, the carrier hotel; the North Freeway in Greenspoint, home to Digital Realty's Digital Houston campus, Switch, FiberTown, Cogent and Lumen, with Equinix HO1 about 3 miles east; the Energy Corridor off Beltway 8, where DataBank runs the Westway Park campus, formerly CyrusOne's Houston West; and Katy, where Element Critical runs the Houston One campus, formerly Skybox.

What is 1301 Fannin Street?

Houston's carrier hotel: a 25-story, 1.1 million square foot downtown tower with about 26 MW of power and more than 40 network operators. It is the main interconnection point for carriers serving Houston, and the building to be in for peering and network-heavy deployments.

Who owns 1301 Fannin?

Netrality, which acquired the building in February 2015 and operates it as a carrier-neutral interconnection facility.

What happened to CyrusOne's Houston data centers?

DataBank bought four Houston-area data centers from CyrusOne in 2022 for $670 million, including the Westway Park campus, then called Houston West, in the Energy Corridor. The deal made DataBank the largest independent data center provider in Houston, with more than 300,000 square feet of raised floor and 42.5 MW of installed critical IT load.

Does Digital Realty have data centers in Houston?

Yes. Digital Realty's Digital Houston campus spans 12001 to 12245 North Freeway in Greenspoint, with buildings including IAH10, IAH11, IAH13 and IAH14, offering cabinets through private suites.

What is Element Critical Houston One?

A 26 MW data center campus on 20 acres at 22000 Franz Road in Katy, which Element Critical bought from Skybox Datacenters in 2021, with Skybox continuing to handle wholesale leasing after the sale. Element Critical is now adding a 20,000 square foot, 10 MW high-density hall, launching with 4.5 MW by the fourth quarter of 2026.

Is Houston a safe place for a data center, given hurricanes?

It can be, when the facility is chosen carefully. Check the flood zone and the elevation of critical equipment, generator runtime at full load, fuel delivery contracts, and how staff and remote hands operate during a storm. Hurricane Beryl in July 2024 left more than 2 million CenterPoint customers without power, so on-site power and fuel matter more here than in most markets.

Should a Houston company put its recovery site outside Texas?

Usually, yes. Dallas is only about 4 ms away but sits on the same Texas grid, ERCOT, and can share a statewide event like Winter Storm Uri in 2021. Denver, Phoenix and Atlanta are outside both the Gulf Coast and ERCOT, at roughly 11 to 16 ms.

Houston or Dallas for colocation?

Dallas is the larger Texas market, with more carriers, more operators and more wholesale supply. Houston is smaller, had more room in 2025, and suits companies with Gulf Coast operations or energy-industry computing. They are about 4 ms apart, and many companies use one as the primary and keep an option in the other.

Can Houston data centers support AI and GPU racks?

Some can. The energy industry's seismic computing gave Houston halls a history of high density, and air-cooled GPU servers at 35 to 70 kW per rack fit a good number of them. New purpose-built capacity is arriving as well: Element Critical is building a 10 MW high-density hall in Katy, with its first 4.5 MW due by the fourth quarter of 2026. Rack-scale liquid-cooled systems need a facility with a water loop to the hall, so the search starts with which halls have one and when.

Where else in Texas can I colocate?

Dallas is the state's largest market, with Austin and San Antonio as smaller options. All three are within about 4 ms of Houston, which makes a second Texas site easy to network, though all share the ERCOT grid.

How fast can I get colocation in Houston?

Up to about 200 kW can often go live within weeks where space is built and powered. Larger blocks depend on which buildings have room, and multi-megawatt deployments are typically reserved six to twelve months or more ahead.

What does Houston colocation pricing include?

Usually power and space together, quoted per kW of committed power, plus cross-connects, remote hands, setup fees and an annual escalator. On metered contracts, electricity is billed separately at Texas market rates, so the contract terms matter as much as the headline rate.

Do you charge for finding Houston colocation?

No. The operator you choose pays us from its channel budget, and your rate is not marked up. Send the requirement and you'll hear back within 24 hours.

Price Your Houston Requirement

Send what you need: cabinets or kilowatts, density, downtown or suburban, connectivity, recovery needs and the date. You'll hear back within 24 hours from the person who will run your search. We find the Houston space that fits, price it against what comparable deployments pay, and negotiate the contract before you sign.

Send it before you call an operator.
Once you have contacted an operator directly, it usually will not work through an advisor on your deal. The operator you choose pays us, so it costs you nothing.
Price My Houston Requirement