AI and GPU Colocation
High Density Racks, Liquid Cooling and the Data Centers That Can Take Them

Most data center space was built for 5 to 10 kW per rack; rack-scale AI draws 120 kW and up. Placing your own GPUs, leasing megawatts or renting a cluster, we find the capacity that fits.

For GPU owners, AI tenants and GPU renters 35 to 230 kW per rack, air or liquid Paid by the operator, never by you

GPU colocation, often called AI colocation, means placing GPU servers you own in a data center that can power and cool them. The hard part is density. Current rack-scale systems draw about 120 to 230 kW per rack and need direct-to-chip liquid cooling, while most data center space was built for 5 to 10 kW. In our recent searches for rack-scale capacity, most operators had space, and very few could support the density on the timeline. The question is not which provider but which specific hall can serve your density today and still serve you in year four, when the hardware has moved twice.

GB300 NVL72
140 to 160 kW
per rack, direct-to-chip liquid cooled only
AIR COOLING CEILING
About 35 kW
per rack; rear-door heat exchangers stretch it to about 70 kW
NEXT GENERATION
190 to 230 kW
per rack for Vera Rubin, volume shipping from late 2026
PRIMARY MARKET VACANCY
1.4%
a record low across North America, H1 2026 (CBRE)

Sources: NVIDIA platform announcements and published rack specifications; CBRE North America Data Center Trends H1 2026. Figures as of September 2026.

IN THE PRESS
Data Center Knowledge led its August 2026 coverage of how little available data center space can actually run high density AI with our findings. Read the article
Data Center POST published our analysis of what AI buyers find when they search for capacity in October 2026. Read the article
Placing GPUs or leasing AI capacity? Why talk to us before you call an operator
From a few cabinets to several megawatts.
One requirement, for high density colocation or wholesale space, goes to the operators that can serve it, including Digital Realty, Equinix, DataBank, CoreSite and Cologix, plus operators outside our channel when the requirement demands it.
Checked at the hall, not the brochure.
We confirm sustained density, whether the liquid cooling loop reaches the white space today, floor loading and the electrical path for the specific hall.
Terms that survive the next generation.
Density escalation rights, cooling service levels and expansion options, negotiated before you sign.
No cost to you.
The operator you choose pays us. Your rate is not marked up, and you'll hear back within 24 hours.

The AI Rack Density Ladder

Power per rack by NVIDIA platform, against the cooling ceilings a facility has to clear

HopperHGX H100
Air, 35 kW
Rear door, 70 kW
About 40 kW
BlackwellGB200 NVL72
130
Blackwell UltraGB300 NVL72
160
Vera RubinVR200 NVL72, late 2026
Rubin UltraKyber NVL576, 2027
Feynman2028, projected

Everything above Hopper sits past both cooling ceilings. A hall built for air cooling cannot serve any current rack-scale system, and a colocation lease signed today will run through at least two more hardware generations.

Upper end of each range shown; bars to scale, kW per rack. Shipping figures from NVIDIA platform announcements and published rack specifications; Rubin Ultra and Feynman figures are industry projections and may change. Source: Metro Colo Advisory, AI Rack Density Ladder, September 2026. Free to cite with a link to this page.

AI Colocation Capacity by Deployment Size

The first three questions in any AI capacity search are how much, how fast and whether you qualify. The answers change sharply with size. Because we work across operators, this covers the whole North American market rather than one building.

DeploymentWhat is realistic nowTypical timingWhat operators ask for
Up to 200 kWOne to a few racks, or a small cageAir-cooled racks to about 30 to 40 kW in many retail facilities; liquid-cooled racks in fewerWeeks to a few months where space is built and poweredA standard financial review; a deposit for newer companies
200 kW to 1 MWA cage or small suiteAir-cooled racks of 35 to 70 kW with containment or rear-door heat exchangers at mid-size operators and newer builds; direct-to-chip where a water loop already reaches the hallOne to six months if the space is built; otherwise the next phaseFinancial statements; a deposit or prepayment is common
1 to 5 MWA private suite or data hallMostly new buildings and phases delivering in 2027; space this size available this quarter is rareReserved six to twelve months ahead, often split across hallsStrong financials, or security such as a letter of credit; terms of three to five years or more
5 MW and upA full hall, building or build-to-suitWholesale capacity, largely 2027 and 2028, usually committed before constructionTwelve to twenty-four months; longer for build-to-suitInvestment-grade credit or substantial security; terms of five to fifteen years

Metro Colo Advisory's read of the North American market, October 2026. Not quotes; availability, timing and terms vary by operator, market and density. Free to cite with a link to this page.

PLAIN ANSWER
Up to about 1 MW can often go live within weeks to months. Five megawatts or more within the next two quarters is realistic only with strong credit or security, and usually means splitting the deployment across halls or sites. If that is your requirement, send it early; the search starts with what you can qualify for.

When Owning GPUs Beats Renting Them

Renting GPUs makes sense while models and usage are still changing. The math turns once a workload runs steadily around the clock, because on-demand pricing charges for flexibility you are no longer using. How much owning saves depends on what you compare it to, so here is the same fleet priced four ways.

One inference fleet, four ways to pay
Monthly cost of 64 H100 GPUs (eight 8-GPU servers) running around the clock, September 2026
Hyperscaleron demand, about $6.88 per GPU-hour
About $321,000
GPU cloudon demand, median about $3.25
About $152,000
Reserved, 12 monthsabout 30% below on demand
About $106,000
Owned, in colocation3-year cost, before power and financing
About $80,000

Sources: CloudZero (AWS H100, August 2026); GetDeploying median, September 2026. Owned: eight servers at about $285,000 each over three years plus about $16,000 a month of colocation, a Metro Colo Advisory calculation from published prices. Illustrative, not a quote.

About 75% less than a hyperscaler

The biggest gap, and the one most teams still running production inference on AWS or Azure on demand are paying.

About half of a GPU cloud

Specialist GPU clouds already cut the hyperscaler price roughly in half. Owning halves it again for steady work.

About 25% less than a reservation

Closer than most people expect, before power and financing. Owning wins on fleets planned for three years or more, and you keep the hardware.

For a workload you will run for a year, reserving often beats buying once you count power, financing and the effort of running hardware. For fleets planned beyond three years, owning in colocation is usually the lower number. Below about $20,000 a month of GPU spend, staying on rented capacity is usually the better answer. We price both paths at no cost; the full ownership math is on the data center cost page.

Renting Instead: GPU Rental and GPU Clusters

Not every team should own hardware. For bursty training, early-stage models or capacity needed this month, renting dedicated GPUs or a reserved cluster is often the better first step, and we place both.

GPU rental

Reserved and on-demand GPU servers by model, with current pricing. See GPU rental, and by GPU: H100, H200 and B200 and B300.

GPU cluster rental

Multi-node clusters with high-speed interconnect for training, reserved by the month or the year. We place reserved B300 and GB300 clusters of up to about 1,000 GPUs on multi-year terms, and H100 and H200 servers from a single machine up. See GPU cluster rental.

Neocloud providers

The specialist GPU clouds, compared on price and capacity. See neocloud providers and CoreWeave competitors.

Bare metal

Dedicated servers by the month without buying hardware, for workloads that need control without a capital outlay. See bare metal.

Renting GPUs or a cluster?
Send the GPU model, quantity, term and workload. We find the rental options that fit, and price owning in colocation alongside if it could cost less. The provider you choose pays us, and you'll hear back within 24 hours.
Price GPU Rental

What High Density Colocation Means in 2026

High density colocation has been redefined by AI, and the definition is still moving. The platforms below set what a facility has to deliver to a single rack.

PlatformPower per rackApproximate weightCoolingStatus
HopperHGX H100About 40 kWNot publishedAir or liquidShipping
BlackwellGB200 NVL72About 120 to 130 kW1,360 kg (about 3,000 lb)Direct-to-chip liquidShipping
Blackwell UltraGB300 NVL72About 140 to 160 kW1,360 kg (about 3,000 lb)Direct-to-chip liquidShipping
Vera RubinVR200 NVL72190 to 230 kWNot publishedDirect-to-chip liquidVolume shipping second half 2026
Rubin UltraKyber NVL576About 600 kWNot publishedDirect-to-chip liquid2027
FeynmanRack not yet specifiedUp to 1 MW, projectedNot publishedLiquid2028

Weights approximate and vary by configuration. Figures for systems not yet shipping reflect published roadmap guidance and industry projections, and may change.

THE CONTRACT POINT
Colocation terms run five to ten years while the hardware changes every twelve months. What matters is not the density you need on day one but whether the facility has a documented path to the density you will need in year four, and whether your agreement gives you a right to it. That is almost never in the standard terms. See the data center lease guide.

What Makes a Data Center AI Ready

"AI ready" has become a marketing phrase. Four things separate a facility built for AI from one that supports a few high density cabinets.

Sustained, contiguous power

Density per cabinet held continuously, not as a peak, across a block of racks rather than isolated positions.

Water to the white space

A facility water loop that reaches the data hall today, not one that is planned. Building it later is a construction project.

Floors rated for the weight

About 1.5 tons per rack, which rules out many upper floors in converted buildings.

Electrical headroom

A distribution path with room for the next hardware generation, not just the current one.

Most colocation facilities were built before AI. The famous carrier hotels, 60 Hudson Street in New York, 350 East Cermak in Chicago and One Wilshire in Los Angeles, were designed for 3 to 5 kW per rack and are world-class for networks, not for rack-scale density.

Data Center Liquid Cooling, Compared

Density is a cooling problem before it is a power problem. Any facility can deliver more power to a rack; removing the heat is what limits what a hall can support, and it is where most facility evaluations go wrong.

MethodPractical ceilingWhat the facility needsServes rack-scale AI?
Air coolinghot and cold aisle containmentAbout 30 to 35 kW per rackStandard containmentNo
Rear-door heat exchangerliquid radiator on the rack doorAbout 50 to 70 kW per rackFacility water to the rack doorNo
Direct-to-chip liquidcold plates on the processors200 kW and above per rackWater loop to the white space, plus a coolant distribution unitYes, required
Immersionhardware in dielectric fluidHighest of any methodTanks and different hardware handlingNot in current rack-scale form

Is the loop there today?

Whether facility water reaches the white space now, or has to be built, is the biggest single driver of whether a deployment date is achievable.

How warm can the water be?

Many rack-scale systems tolerate warm supply water, in some cases up to 45°C, which often allows free cooling and widens the pool of qualifying facilities.

Who supplies the CDU?

Some racks ship with the coolant distribution unit built in; others need the facility to provide it. The answer changes capital cost and who is responsible when it fails.

Power Architecture and the 800 VDC Transition

Cooling gets most of the attention; power distribution is the constraint arriving behind it. Traditional distribution converts to 54 volts DC inside the rack, which breaks down as racks approach a megawatt: a 54-volt system at 1 MW per rack needs up to 200 kilograms of copper busbar per rack. The industry answer is 800-volt DC from the facility to the rack. NVIDIA has published a reference architecture, Vertiv, Schneider Electric, Eaton and Delta have announced commercial 800 VDC products for the second half of 2026, and neoclouds including CoreWeave, Lambda and Nebius are designing facilities around it. Current Blackwell and Vera Rubin racks do not require it, but a lease signed today will run past the transition.

The four questions we ask every operator on a long-term high density requirement
1
Maximum sustained density, this hall
Not the portfolio figure, and sustained, not peak.
2
The documented path to more
What it would take, what it would cost, and when.
3
An 800 VDC roadmap
Including certifications and trained staff, not just equipment.
4
Density escalation rights
A right to future capacity in the agreement, not a verbal assurance.

What the AI Capacity Market Looks Like Right Now

Where the capacity under construction already stands
7,481 MW under construction across North American primary markets, a record, H1 2026
80%+ preleased
Open
1.4% vacancy, a record low
Under 1,500 MW still open, about six months of demand

Source: CBRE, North America Data Center Trends H1 2026. Northern Virginia vacancy is near 0.2%.

Asking rates for 250 to 500 kW requirements rose 4.3 percent in the first half of 2026, and rates above 10 MW rose 6.7 percent. Contiguous space is the constraint more than total capacity, new builds take two to three years to power, and requirements that can flex, on warm water or on splitting across a campus, qualify at facilities a rigid requirement would be turned away from. For multi-megawatt requirements, see wholesale colocation.

Where Rack-Scale Density Actually Exists

Industry survey data puts average rack density around 27 kW in 2026, and only about one operator in five reports being ready for 50 to 70 kW racks. Rack-scale systems sit two to four times above that.

The primary markets

Northern Virginia holds the deepest concentration of density-capable capacity, including Sabey's Ashburn campus designed for more than 100 kW per rack. In Silicon Valley, Colovore supports 5 to more than 600 kW per rack. Liquid-cooled deployments there commonly take three to six months to go live.

The secondary markets

Phoenix, Columbus, Salt Lake City, Charlotte, Atlanta and Reno bring dense capacity online faster, often in four to eight weeks, and can price 20 to 40 percent below Northern Virginia.

Canada

QScale's Q01 campus near Quebec City publishes liquid-cooled cabinets rated well past 200 kW on hydro power, and eStruxture publishes 150 kW and above in Vancouver. Worth checking for training with no US latency requirement.

The commitment and credit screens

Tier 1 operators in the tightest markets now gate new customers behind 100 kW or multi-megawatt commitments, and operators serving high density often raise the buyer's credit before discussing availability.

Liquid-cooled capacity: primary versus secondary markets
Typical time from decision to live capacity
Northern Virginia, Silicon Valleyprimary markets
3 to 6 months
Phoenix, Columbus, Atlanta, Renosecondary markets
4 to 8 weeks

Secondary markets can also price 20 to 40 percent below Northern Virginia for workloads without a coastal latency requirement.

Metro Colo Advisory market read, September 2026. Typical ranges, not quotes; timing depends on the facility, the density and the requirement.

Most rack-scale capacity trades off-market, published availability lags what operators will commit to, and the answer is frequently no. In recent searches for large liquid-cooled requirements, most major operators approached declined at that density. Requirements that can flex on specification or geography place far more easily.

AI Capacity by Market

Northern Virginia and Ashburn

The largest data center market in the world, with the deepest cloud on-ramps and density-capable capacity. Best for AI workloads needing direct cloud connectivity at scale.

Dallas

A central position with growing high density capacity and better economics than the coasts. A fit for inference serving the central and southern US.

Phoenix

Large new campuses and pricing below the coasts. New power is now the constraint, as the main utility limits new data center load, so existing and committed capacity is what counts.

Columbus, Ohio

One of the fastest-growing AI markets, with major hyperscaler investment around New Albany. Large new loads now come with a utility tariff requiring long, firm commitments.

Atlanta and Chicago

Atlanta leads primary markets in construction; Chicago offers established density in the central US. Fits for inference serving the Southeast and Midwest.

Los Angeles, the Bay Area and Denver

West Coast proximity at premium pricing, with Silicon Valley holding purpose-built density, and Denver as a central alternative.

New York metro

DataBank LGA3 in Orangeburg reaches 100 kW and above with liquid cooling; CoreSite NY3 and Equinix NY5 in Secaucus serve hybrid cloud and financial AI. None currently advertise rack-scale density, so that tier is usually placed outside the metro.

Quebec and Alberta

Power well below US primary market rates and free cooling much of the year. Best for training with no US latency requirement.

DATA CENTER CONSULTING

For Developers, Operators and Investors

Placing a defined requirement is free to the buyer. The questions before placement are different work: what density a site can actually support once the floor, the cooling loop and the electrical path are accounted for, which operators and tenants would take a building, and what a specification forecloses once the drawings lock. Those are consulting engagements for developers, operators and investors, priced as projects.

Design for AI tenants

Density, cooling and power decisions made against what AI tenants will actually lease. See data center consulting.

Land and power

Whether a site's power date and capacity make it marketable to AI and hyperscale demand. See powered land and build to suit.

Acquisitions and diligence

Whether a facility can be repositioned for high density, and what it is worth if it can. See due diligence and valuation.

Working with developers

How the largest developers build for AI, and how landowners and tenants work with them. See data center developers.

Building or buying for AI demand?
Tell us about the site, the facility or the deal. We scope the work, at a fixed fee agreed before it starts, and you'll hear back within 24 hours.
Scope a Project

The Hybrid Architecture: The Right Answer for Most AI Companies

For most AI companies the answer is not all-owned or all-rented but a split. Steady production inference, validated models and predictable training belong on dedicated infrastructure, owned in colocation or rented as reserved clusters. Experimentation, burst capacity and early-stage models belong on rented or cloud capacity. Getting the split right is where most of the savings are. See cloud repatriation and hybrid cloud.

Common Mistakes in High Density Colocation

1. Choosing a carrier hotel for the name

The famous network buildings are world-class for connectivity and wrong for rack-scale density.

2. Underestimating cooling

Air tops out around 30 to 35 kW per rack whatever the facility. Anything above needs liquid, planned early.

3. Leaving out cross-connects

Private links to the clouds add recurring cost. They usually save more in egress, but they belong in the model.

4. Treating it like cloud provisioning

Dedicated infrastructure runs 60 to 120 days from signing to live. Plan for it with the migration guide.

5. Signing standard terms

Standard contracts assume standard density. High density needs power guarantees, cooling service levels and density escalation rights.

GPU Colocation Services: How We Find and Place Capacity

1

You send the requirement

Density per rack, total power, cooling type, markets and date. Or the GPU model and quantity if you are deciding between renting and owning.

2

We screen at the hall level

Sustained density, cooling loop, floor loading and electrical path for each candidate hall, not the operator's brochure.

3

We find what is actually available

Including space that is not advertised and operators outside our channel when the requirement needs them, compared on five-year totals.

4

We negotiate before you sign

Density escalation rights, cooling service levels and expansion options. The operator you choose pays us. How a data center broker works.

Frequently Asked Questions

What is AI and GPU colocation?

Placing GPU servers you own in a data center that can power and cool them. For current rack-scale AI systems that means 120 kW or more per rack and direct-to-chip liquid cooling, which most data center space cannot provide.

What is high density colocation?

Data center deployments at about 25 kW per rack or more, usually driven by GPU and AI workloads. Current AI deployments run from about 35 kW for air-cooled GPU servers to 140 kW and above for rack-scale liquid-cooled systems, while most legacy facilities support 5 to 10 kW.

How much power does a GB300 NVL72 or Vera Rubin rack need?

A GB300 NVL72 draws about 140 to 160 kW and weighs roughly 1.5 tons. The Vera Rubin VR200 NVL72, shipping in volume from the second half of 2026, draws about 190 to 230 kW. Rubin Ultra on the Kyber rack is specified at around 600 kW for 2027. All require direct-to-chip liquid cooling.

Which data centers can serve rack-scale AI density?

A small share. Density-capable capacity concentrates in Northern Virginia and Silicon Valley, with faster availability in Phoenix, Columbus, Atlanta and Reno, and in Canada at QScale near Quebec City and eStruxture in Vancouver. We run live searches across operators at no cost.

Can any colocation facility support liquid cooling?

No. The deciding question is whether a facility water loop reaches the white space today or has to be built, because retrofitting one into an operating hall is a construction project. A provider supporting liquid cooling and a specific hall having a loop today are different answers.

What is the difference between air cooling, rear-door heat exchangers and direct-to-chip cooling?

Air cooling tops out around 30 to 35 kW per rack. Rear-door heat exchangers extend that to about 50 to 70 kW. Direct-to-chip liquid cooling puts cold plates on the processors and supports 200 kW and above, and it is required for current rack-scale GPU systems.

Is owning GPUs in colocation cheaper than renting?

For steady workloads, usually. In our 64-GPU example, owning in colocation runs about 75 percent below hyperscaler on-demand pricing, about half a GPU cloud, and about 25 percent below a 12-month reservation, before power and financing. For bursty or short-term work, renting is usually better.

Should I rent GPUs or a GPU cluster instead?

Renting suits training bursts, early-stage models and capacity needed quickly. Reserved GPU servers and clusters can be live in days or weeks, while owned hardware in colocation takes months. We place both and compare them for your workload.

Is dedicated infrastructure worth it below $20,000 a month of GPU spend?

Generally no. Below that level the work of buying hardware, contracting space and running infrastructure usually outweighs the savings, and staying on rented capacity until workloads stabilize is the better answer.

How fast can I get AI or GPU colocation?

It depends on size. Up to about 200 kW can often go live within weeks where space is built and powered. Between 200 kW and 1 MW usually takes one to six months. From 1 to 5 MW, most capacity is reserved six to twelve months ahead for 2027 delivery, and 5 MW and up typically means twelve to twenty-four months. Hardware lead times can add to any of these.

How is power billed for AI and GPU colocation?

Two main ways. Smaller deployments are often quoted at an all-in rate per kW of committed capacity, with electricity included up to that commitment. Larger blocks, often 100 kW and up, are usually billed for space and committed capacity separately, with the electricity you actually use metered and a cooling overhead applied. Comparing quotes means converting both to the same monthly total.

What PUE should I expect for AI colocation?

Power usage effectiveness averages about 1.54 across the industry. Air-cooled colocation commonly runs in the 1.4 to 1.6 range, while purpose-built liquid-cooled halls can run well below that, around 1.1 to 1.25. On metered billing, PUE directly raises your power cost, so it belongs in any comparison.

What credit do operators require for AI colocation?

More as the commitment grows. Small deployments need a standard financial review. From around 1 MW, operators expect strong financials or security such as a deposit, letter of credit or prepayment, and multi-megawatt commitments usually require investment-grade credit or substantial security. Many operators will not quote without it, so it is the first thing to prepare.

Where is AI colocation cheapest?

Outside the coastal hubs. Phoenix, Columbus, Atlanta, Reno and Dallas typically run 20 to 40 percent below Northern Virginia for workloads without a coastal latency requirement, and Quebec lower still on hydro power for training.

What should a high density colocation contract include?

The maximum sustained density for the specific hall, the documented path and cost to increase it, cooling service levels separate from power, and density escalation rights giving you a claim on future capacity. Standard contracts contain none of this.

Do you advise data center developers on AI demand?

Yes, as paid consulting: what density a site can support, which operators and tenants would take it, power and land, diligence and valuation. Placement for buyers is free; consulting for developers, operators and investors is priced as a project.

Do you offer AI and GPU colocation services in every market?

Yes, across North America, through formal channel partnerships with Digital Realty, Equinix, DataBank, CoreSite, Cologix and others, and with operators outside our channel when the requirement needs them. Send the requirement and you'll hear back within 24 hours. The operator you choose pays us.

Find AI Capacity, or Price GPU Rental

Placing your own GPUs: send the density per rack, total power, cooling and date. Leasing megawatts: send the load, markets and date. Renting: send the GPU model, quantity and term. You'll hear back within 24 hours.

A few lines are enough to start.
The operator or provider you choose pays us, so it costs you nothing. Building or buying for AI demand instead? Scope a consulting project.
Find AI Capacity