Copper Retirement TrackerAT&T, Verizon and Lumen Landline Shutoffs by State, the FCC’s 2026 Order and What a Notice Letter Means

AT&T can begin shutting off copper landlines in parts of 18 states on November 15, 2026. Got carrier letters for several sites? Send them with the addresses. We map which sites are affected, run the replacement providers that fit at once and negotiate, at no cost to you.

Plan My Copper Exit
Built for multiple sites or 20+ lines Every date sourced and logged Paid by the provider, reply within 24 hours

Copper retirement, also called the copper sunset, is a carrier shutting down its copper telephone network and the landline (POTS) service that runs on it. AT&T can begin shutting off copper landlines on November 15, 2026 in wire centers serving about 90,000 customers in 18 states, approved by the FCC on January 12, 2026 (Broadband Breakfast). Verizon has approval in parts of 8 states and requests pending in 18 more states and D.C., and under the FCC’s March 2026 order (FCC 26-19) every carrier’s application is granted automatically after 31 days unless the FCC acts. For organizations with many sites, the copper exit is usually one part of a bigger network and infrastructure plan, which is the work our data center consulting scopes.

AT&T APPROVED
18 states
about 90,000 customers, approved January 12, 2026
18-STATE BATCH CAN START
Nov. 15, 2026
when shutoffs can begin, not one cutoff date
VERIZON APPROVED
8 states
approved August 21, 2026; 18 more states pending
BUSINESS LANDLINES LEFT
8.6M
at June 30, 2025, down about 18% in a year

Sources: Broadband Breakfast, January 13, 2026 (AT&T approval, reported as granted Monday, January 12, and start date); Broadband Breakfast, July 6, 2026 (AT&T California); Broadband Breakfast, August 21, 2026, Fierce Network, September 28, 2026 and DataRemote (Verizon); FCC, Voice Telephone Services: Status as of June 30, 2025, Table 1, released May 2026 (8,612,000 business lines, from 10,531,000 a year earlier; the 18 percent decline is an MCA calculation).

Copper Retirement Map: Where AT&T and Verizon Have Approval

Each colored tile is a state where an AT&T or Verizon filing logged on this page has FCC approval to discontinue copper landline service, or is pending. Approvals cover specific wire centers, so a colored tile means some sites there are affected, not all of them.

Copper landline discontinuance by state: AT&T and Verizon
One tile per state, for the filings logged on this page: AT&T’s 18-state batch and California approval, and Verizon’s three applications. A corner marker means Verizon has also filed in an AT&T state.
AT&T approved Verizon approved Verizon request pending AT&T approved, Verizon approved too AT&T approved, Verizon pending Nothing logged here yet
22 states with a logged approval. AT&T’s 18 plus California, plus Verizon’s 8, less the 5 states on both lists (Florida, Indiana, North Carolina, Texas and Wisconsin): 19 + 8 − 5 = 22. MCA calculation.
36 states plus D.C. with a logged approval or request. Add Verizon’s 9 states under review, less Ohio and South Carolina, already counted, and its September filing’s 9 states and D.C., less California and Michigan, already counted: 22 + 7 + 7 = 36, plus D.C. MCA calculation.

Sources: Broadband Breakfast, January 13, 2026 (AT&T); Verizon’s July 7, 2026 application as copied to the Florida Public Service Commission and Broadband Breakfast, August 21, 2026 (Verizon approved); Fierce Network, September 28, 2026 (Verizon under review); Broadband Breakfast, July 6, 2026 (AT&T California); DataRemote (Verizon September filing). A gray tile means no AT&T or Verizon approval or request is logged on this page, not that every line there is safe: AT&T’s business-line application in 34 states and D.C. is not mapped because the states are not published, and Lumen and other carriers publish their own notices. The map data is free to download from our copper retirement data page. Figures as of October 2026. Free to cite with a link to this page.

Interactive version: open the interactive map, with hover details, a PNG download and embed code. Free to embed with credit to Metro Colo Advisory.

Beyond the 18-state batch, the FCC approved AT&T’s California application on June 29, 2026, with shutoffs there on or after June 1, 2027. A separate AT&T application to end business landline service sold by its CLEC affiliates in 34 states and D.C. is set to be granted automatically on November 5, 2026 unless the FCC acts. Verizon’s eight-state approval came automatically on August 21, 2026, its request for nine more states is under FCC review, and a September 9 filing covers parts of nine more states and D.C. Lumen closed new copper POTS orders across its legacy territory in 2025.

This tracker logs each of those approvals, requests and FCC actions with the date and source beside every entry, and we update it as new ones are announced. It is written for organizations with multiple locations or 20 or more lines, where fire alarm panels, elevator phones, alarm panels, fax machines, gates and ATMs still run on copper, and where the job is replacing every one of those lines before those dates arrive. Holding a carrier letter? Go straight to what to do with it. The data behind this page is free to download as CSV files: copper retirement data.

How Fast Is AT&T Retiring Copper?

Each copper retirement notice covers a wire center or part of one, so the yearly count shows how quickly the network is being taken apart. The count has risen every year since 2019, and 2025 was the steepest jump.

AT&T copper retirement notices per year, 2019 to 2025 (industry tally)
Notices issued each year. 2025 is highlighted.
2019
2020
2021
2022
2023
2024
2025
More than double in one year. 494 notices in 2025 against 240 in 2024 is 2.06 times. MCA calculation.
One year outran four. 2025 alone exceeded 2019 to 2022 combined: 16 + 82 + 97 + 111 = 306. MCA calculation.

Source: MetTel tally reported in DataRemote’s Copper Retirement Bulletin, Q3 2026. This is an industry tally, not an FCC count; the bulletin’s own check of AT&T’s disclosure listings found more than 580 network change disclosures listed for 2025. The 2026 figure is left out because the published number is unclear, and since FCC 26-19 removed the network change filing requirements, counts from 2026 on may not compare with earlier years. Figures as of October 2026. Free to cite with a link to this page.

Interactive version: open the interactive chart, with hover details, a PNG download and embed code. Free to embed with credit to Metro Colo Advisory.

Got a carrier notice? Why talk to us before you call a provider
Send what you have.
Don’t have a full line list? The notice letters and a list of site addresses, or a recent phone bill, is enough to start. We map which sites each letter covers and what runs on those lines.
Every provider that fits, at once.
The replacement providers that fit price every site on the same day, compared as full-term totals, not a headline price per line. Once you ask a provider for pricing directly, that provider usually will not register an advisor on the deal, and you negotiate alone.
The carrier’s offer is one option.
AT&T and Verizon offer their own replacements, and they are one option, not the only one. For fire alarm and elevator lines, what the local authority accepts decides the answer.
No cost to you.
The provider you choose pays us, so it costs you nothing. If you have one building and a couple of lines, your carrier’s own replacement may be the simplest answer, and we will say so.
What happens next: you’ll hear back within 24 hours, we line up the providers that fit, and their engineers handle the site surveys. No calls needed from you.
For organizations with multiple locations or 20 or more lines, whether that is 3 buildings or 300. If you have already spoken to one provider, tell us which; we can still run the rest of the market.

AT&T Copper Retirement List: The 18 Approved States

The FCC granted AT&T’s December 1, 2025 application automatically on Monday, January 12, 2026, 31 days after public notice. It covers wire centers serving about 90,000 customers in 18 states, who were told in November 2025 that copper landline service could be discontinued starting November 15, 2026: the first day shutoffs can begin, not one cutoff day for everyone. AT&T offers its own broadband-based phone service or a mobile line as the replacement.

The approval covers specific wire centers, not every AT&T line in a state. The notice letter, not the state name, tells you whether a site is affected. The last column shows any Verizon filing in the same state.

In every row: carrier AT&T, status FCC approved January 12, 2026, earliest discontinuance November 15, 2026. Below each state is any Verizon filing in the same state.
StateCarrierStatusEarliest discontinuanceVerizon filing in the same state
AlabamaAT&TFCC approved January 12, 2026November 15, 2026No Verizon filing logged here
ArkansasAT&TFCC approved January 12, 2026November 15, 2026No Verizon filing logged here
FloridaAT&TFCC approved January 12, 2026November 15, 2026Verizon: approved August 21, 2026
GeorgiaAT&TFCC approved January 12, 2026November 15, 2026No Verizon filing logged here
IndianaAT&TFCC approved January 12, 2026November 15, 2026Verizon: approved August 21, 2026
KansasAT&TFCC approved January 12, 2026November 15, 2026No Verizon filing logged here
KentuckyAT&TFCC approved January 12, 2026November 15, 2026No Verizon filing logged here
LouisianaAT&TFCC approved January 12, 2026November 15, 2026No Verizon filing logged here
MichiganAT&TFCC approved January 12, 2026November 15, 2026No Verizon filing logged here
MississippiAT&TFCC approved January 12, 2026November 15, 2026No Verizon filing logged here
MissouriAT&TFCC approved January 12, 2026November 15, 2026No Verizon filing logged here
North CarolinaAT&TFCC approved January 12, 2026November 15, 2026Verizon: approved August 21, 2026
OhioAT&TFCC approved January 12, 2026November 15, 2026Under FCC review (filed August 10, 2026)
OklahomaAT&TFCC approved January 12, 2026November 15, 2026No Verizon filing logged here
South CarolinaAT&TFCC approved January 12, 2026November 15, 2026Under FCC review (filed August 10, 2026)
TennesseeAT&TFCC approved January 12, 2026November 15, 2026No Verizon filing logged here
TexasAT&TFCC approved January 12, 2026November 15, 2026Verizon: approved August 21, 2026
WisconsinAT&TFCC approved January 12, 2026November 15, 2026Verizon: approved August 21, 2026

Sources: Broadband Breakfast, January 13, 2026 (AT&T states, approval and start date); Verizon filings as copied to the Florida Public Service Commission (July 7, 2026 application) and Fierce Network, September 28, 2026 (August 10, 2026 request).

AT&T Wire Centers by State: Where November 15 Shutoffs Can Start

AT&T’s December 1, 2025 application names 1,060 wire centers across the 18 states, from 19 each in Florida and North Carolina to 140 in Michigan. A wire center is the local phone office that serves a group of addresses, usually named for the town it sits in. The application covers portions of each one, not every line in it, and two services: AT&T Residential Local Service and AT&T Business Local Exchange Access Line Service. Pick a state to see its list. Verizon and former Frontier towns, with a November 16 date, have their own list.

No listed AT&T wire center matches that name. Check the spelling, look for the nearest larger town, or check the Verizon and Frontier list.
Alabama25 wire centers
BremenCarbon HillCitronelleClaytonCordovaCourtlandDoraElk RiverEutawFairviewFlomatonFort DepositGreensboroHancevilleHurtsboroLafayetteLindenMacintoshMoultonMount VernonRed BayRenfroe EastTuskegee EastUniontownYork
Arkansas53 wire centers
ArkadelphiaAshdownBauxiteBeebeBlytheville AFBBrinkleyCalionCamden-CullendaleCamden-ShumakerCamden-TempleCenter RidgeDellDermottEarleEudoraForrest City-MainForrest City-PalestineGreers FerryHamburgHarrisburgHeber SpringsHelena-HickoryHelena-WestHickory RidgeHopeHuttigJessieville-DeSotoLake VillageLonokeMagnoliaMalvernMariannaMarionMcGeheeMcNeilMorrilton-FleetwoodMorrilton-Petit JeanMount HollyNashvilleNewarkNewportNorphletOsceolaParagould-LightParkinPine Bluff-Watson ChapelRogers-EastSmackoverStampsUrbanaWalnut RidgeWarrenWilmar
Florida19 wire centers
Fort Lauderdale AirportBaldwinBronsonCedar KeyChieflandCross CityDeLeon SpringsFellsmereFort GeorgeGenevaGracevilleJayMicanopyNorth Key LargoOld TownPomona ParkTrentonVernonYankeetown
Georgia42 wire centers
AmericusBacontonBaxleyBlackshearBowdonBuchananCamillaClaxtonCochranColquittCordeleDublinEastmanGayGibsonGrantvilleGreenvilleHazlehurstJekyll IslandJesupKingstonLearyLeesburgLouisvilleLyonsMillenNewtonPelhamRoopvilleRutledgeSandersvilleSmithvilleSylvesterTallapoosaTybee IslandVidaliaWadleyWarrentonWilmington IslandWrensWrightsvilleZebulon
Indiana60 wire centers
AlexandriaAndrewsAtticaAuburnBellmoreBlufftonBoswellBuck CreekBunker HillBurlingtonCayugaClintonConverse-AmboyCulverDanaDarlingtonEatonFairlandFlat RockFowlerGary NorthGastonGreentownHopeHuntingtonJasonvilleKendallvilleKingmanKirklinLadogaLagroLake VillageLebanonLintonMarshallMechanicsburgMiddletownMontezumaMorgantownMoroccoMount VernonNew MarketNew WashingtonOsceolaOtterbeinOxfordRockvilleRosedaleShelby Cedar CreekSheridanSpencervilleSummitvilleTell CityTennysonUplandVeedersburgVincennesWashingtonWaynetownWest Lebanon
Kansas89 wire centers
AndaleAtticaAtwoodBellevilleBeloitBird CityBlue RapidsBurnsCantonChaseCheneyClay CenterCoffeyvilleCoffeyville-DearingColbyColdwaterConcordiaCottonwood FallsDodge CityEllsworthEmporiaEurekaFlorenceFowlerFrankfortGarden PlainGoodlandGreat BendHalsteadHanoverHarperHartfordHerndonHoxieJacksonJewellKingmanLa CrosseLarnedLiberalLincolnLindsborgLyonsMankatoMarionMarquetteMarysvilleMcPhersonMeadeMedicine LodgeMinneapolisMinneolaMount HopeGoddardSedgwickNewtonNickersonNorcaturOakleyOberlinOttawaPaolaPawnee RockPeabodyPhillipsburgPittsburgPlainsPlainvillePrattProtectionSabethaScandiaSenecaSeveryStaffordStocktonSubletteTopeka (two offices)Topeka AuburnTopeka DoverTopeka Maple HillTopeka NorthTopeka RichlandWashingtonWellingtonWichita ColwichWichita WhitewaterWilliamsburg
Kentucky43 wire centers
Beaver DamBentonBremenCadizCalhounCantonCentertownCentral CityClintonCorydonCrab OrchardCroftonDrakesboroEminenceFredoniaGilbertsvilleGreenvilleHansonHardinsburgHawesvilleHebbardsvilleHickmanInformation Park (Paducah)KirksvilleLafayetteLone Oak (Paducah)MarionMaysvilleMorganfieldMount EdenOwentonPantherPembrokePort RoyalReidland (Paducah)RobardsSacramentoSt. CharlesSulphurWaddyWest PointWhitesvilleWillisburg
Louisiana53 wire centers
AmeliaBaldwinBurr FerryCalvinCastorCentervilleColumbiaConventConverseCoushattaCrowvilleDelhiDevilleDownsvilleDry ProngDubachErathFlorienFort NecessityGeorgetownGibslandGramblingGrand CaneGueydanHahnvilleHessmerHornbeckJeaneretteJonesvilleKoranKrotz SpringsLake ArthurLecompteLeonvilleMichoudMontereyMontgomeryMount HermonNatchitochesOak GroveOakdalePierre PartPlaquemine-CrescentPollockRobelineSalineSicily IslandSt. JosephSt. LandryTunicaWashingtonWaterproofZwolle
Michigan140 wire centers
AdaAlbionAlgonacAltoArmadaAthensBad AxeBattle Creek SouthBeavertonBeldingBellevueBenton Harbor EastBerrien SpringsBeulahBig RapidsBirch RunBoyne CityBridgeport MainBridgeport SouthByronCadillacCaledoniaCarletonCarsonvilleCasnoviaCharlevoixCharlotteCheboygan MainCheboygan SouthClareClark LakeClarksvilleColemanCroswellDetroit HogarthDetroit PlazaDimondaleEast JordanEast TawasEaton RapidsEau ClaireEvartFairgroveFarwellFlint NEFlint NorthFlushingFountainFowlervilleFrankenmuthFrankfortFreelandFremontFultonGalesburgGalienGrantGrattanGrawnGreenvilleHarbor SpringsHarriettaHarrisonHartlandHaslettHastingsHillsdaleIndian RiverIoniaIronsJackson NEJackson SWJamestownJonesvilleKalkaskaLake LeelanauLake OdessaLansing NWLe RoyLeslieLexingtonLinwoodMacatawa ParkMancelonaManchesterManisteeMantonMarine CityMarionMarshallMartinMarysvilleMcBainMichigan CenterMiddlevilleMolineMonroe NEMorleyNapoleonNashvilleNew BuffaloNewaygoOlivetOnekamaOscodaOtsegoOwendalePellstonPlainwellPort SanilacPortlandPottervilleReed CityReeseRichlandRiversideRockford SESaginaw MainSaginaw ShieldsSand LakeSanduskySaranacScottsScottvilleSebewaingSpartaSt. ClairStandishThree OaksTraverse CityTustinUblyVassarVicksburgWalloon LakeWatervlietWaylandWest BranchWhite CloudWhitmore Lake
Mississippi69 wire centers
AshlandBaldwynBelmontBentonBogue ChittoBoonevilleBriarwoodCarrolltonCarthageCauseyvilleCharlestonClevelandColdwaterColumbus AFBCrenshawCrystal SpringsDeKalbDrewDuck HillDurantEdwardsEthelFayetteFloraForestGoodmanHarpervilleHeidelbergHollandaleInvernessIukaLakeLelandLexingtonLynvilleMaconMagnoliaMarksMendenhallMonticelloMortonMount OliveNaval Air Station MeridianNewtonPelahatchiePhiladelphiaPickensPoplarvilleRichtonRipleyRoxieRulevilleSaltilloSeminaryShawShubutaSmithdaleSummitSumnerTaylorsvilleTchulaTerryTylertownUnionUticaWalnut GroveWessonWestWest Point
Missouri86 wire centers
AdrianArchieArgyleBeaufortBenton (Kansas City)BillingsBloomfieldBloomsdaleBonne TerreBoonvilleBowling GreenBrookfieldCamdenton NorthCamdenton SouthCampbellCarl JunctionCarrolltonCarthageCaruthersvilleCharlestonChillicotheCleverDeeringDe SotoDexterDowningEast PrairieEdinaEldonElsberryExcelsior SpringsFair GroveFayetteFreeburgGravois MillsGray SummitHannibalHouse SpringsJacksonJasperKennettKnob NosterLa MonteLamarLancasterLinnLouisianaMaldenMarshallMetaMexicoMoberlyMonettMontgomery CityNevadaNew MadridOsage BeachPattonPaynesvillePierce CityPocahontasPortagevillePuxicoRichwoodsSenathSikestonSlaterSt. ClairSte. GenevieveSt. Joseph MidtownSt. MarysStanberryStraffordSunrise BeachTrentonTuscumbiaUnionVersaillesViennaWabash (Kansas City)Walnut GroveWareWest PuxicoWestphaliaWillardWyatt
North Carolina19 wire centers
AcmeRaleigh AirportCharlotte AirportBlowing RockCaroleenClaremontClevelandEdneyvilleEllenboroFairmontGranthamGroverJulianLawndaleMaggie ValleyRowlandRuffinSimpsonvilleStoney Point
Ohio74 wire centers
AberdeenBelfastBellaireBelpreBethesdaBloomingvilleBowersvilleBurtonCanal FultonCarrollCastaliaCedarvilleCheshireChristiansburgClaringtonConesvilleCorningDaltonDanvilleDresdenEast PalestineFairbornFive PointsFranklinFultonhamGlenfordHarrisburgHillsboroJamestownJeffersonvilleKirtlandLeetoniaLeroyLindseyLouisvilleMagnoliaMarshallMilledgevilleMurray CityNavarreNew HollandNew LexingtonNew MiddletownNew RiegelNew WaterfordNorth HamptonNorth JacksonNorwichPiquaRainsboroRio GrandeRipleyRogersRootstownRosevilleRushvilleSalinevilleScotlandSebringShawneeSomersetSouth PointSugar GroveSugar Tree RidgeThornvilleTiffinUhrichsvilleUpper SanduskyVintonWashington Court HouseWellsvilleWest JeffersonWest LafayetteWinchester
Oklahoma75 wire centers
AlluweAlvaAnadarkoAtokaBartlesville-FederalBenningtonBingerBlackwellBlairCacheCalvinCashionCementChandlerChickashaClevelandClintonCoalgateCopanCordellDeweyEufaulaFairviewGraniteGroveHartshorneHealdtonHenryettaHobartHugoIdabelIndiahomaKetchumKonawaLawton WestLone WolfMadillMariettaMaudMcAlesterMedfordMiamiMincoNewkirkOiltonOklahoma City SpencerOkemahOkmulgeePauls ValleyPawhuskaPawneePerkinsPerryPicherPonca CityPryorRush SpringsSeminoleShawneeSpiroStiglerStratfordTalihinaTishomingoTonkawaTuttleVinitaWaltersWaukomisWeatherfordWetumkaWewokaWilsonWoodwardWynnewood
South Carolina23 wire centers
Abbeville HighwayWest Columbia AirportBambergBarnwellBeckman RoadBennettsvilleBlackvilleCentralClintonCowpensDarlingtonDillonEastoverFolly BeachHartsvilleHickory GroveLibertyMcCollMullinsParklaneSt. GeorgeTokeenaWalhalla
Tennessee37 wire centers
Bethel SpringsBlancheBolivarBrownsvilleBulls GapCharlotteClintonCulleokaDecaturDoverDyersburgEaglevilleFayettevilleFlintvilleGrand JunctionHallsHarrimanHartsvilleHenningHuntingdonJasperLake CityManchesterMcKenzieMoscowParisPetersburgRockwoodSanta FeSelmerSouthwindSurgoinsvilleTiptonvilleTrentonUnion CityWhite BluffWhiteville
Texas124 wire centers
AllisonAlpineAmarillo-DiamondAngleton-DanburyAnsonAtlantaAustin-CreedmoorBartlettBellevueBowieBunaBurkburnettCalvertCameronCarrizo SpringsCelinaChinaChristineCiscoClintColorado CityCotullaCraneCrystal CityCueroDeweyvilleEagle LakeEastlandEdgewoodEdnaEl CampoFalcon HeightsFannettFarmersvilleFloydadaFort StocktonFreerGainesvilleGoliadGordonGruverHallettsvilleHamlinHearneHebbronvilleHenriettaHerefordHondoHouston-SheldonIowa ParkItalyItascaJasper-RayburnKarnes CityKenedyKermitKirbyvilleKountzeLa PryorLockneyLongview-JudsonLubbock-New DealLulingLytleMadisonvilleMarfaMarlinMarshallMathisMcCameyMeridianMexiaMineolaMineral WellsMoultonMount PleasantNordheimOmahaOwentownPampaParis-NorthPearsallPlainviewPleasantonPort Arthur-YukonPort IsabelPoteetRangerRankinRefugioRio HondoRoscoeRotanRungeSabinalSan Antonio-SayersSan AugustineSeminoleShinerSilsbeeSlatonSour LakeStamfordSullivan CityTeagueTemple-Lake BeltonTimpsonTroyTyler-Chapel HillVernonWaco-LorenaWaco-MartWaco-McGregorWaco-WestWhartonWichita Falls-LamarWildwood (two offices)Wills PointWinkWolfe CityWorthamYoakumYorktown
Wisconsin29 wire centers
AlgomaBeaver DamBig BendCaledoniaEllsworthFort AtkinsonGenoa CityHoriconHortonvilleHoultonJeffersonJuneauKewauneeMayvilleMilwaukee Park PlaceNew LondonNewburgOmroRiver FallsRobertsSheboygan FallsSomersStevens PointStoughtonWaupacaWaupunWhitewaterWilliams BayWinneconne

Source: AT&T’s December 1, 2025 FCC application, Exhibit 1, as copied to the Florida Public Service Commission (Document No. 15393-2025); granted January 12, 2026. Names are as listed in the filing, lightly cleaned for spelling and abbreviations; where AT&T lists two offices under one town name, both are counted.

When Does It Affect My Line?

AT&T has not published a date for each address, and there is no public lookup. Being in one of these towns does not by itself mean a line is affected. The letter is what tells a customer their line is in the batch: AT&T mailed residential notices from November 3 to November 14, 2025 and business notices on November 14, 2025, and the sample letter in the filing says the service “will be discontinued on November 15, 2026.”

1

Find the November 2025 letter

If a home or business got it, that line is in the batch, and the date in the letter is the one that applies.

2

No letter, or not sure? Call AT&T

Call 1-800-288-2020 and ask whether the line is on copper, whether it is in an area approved for discontinuance, and what the date is for that line. Seniors and customers with disabilities can call AT&T’s Disability and Aging Center at 1-800-772-3140.

3

Businesses: check every line, not only the main number

Fire alarm panels, elevator emergency phones and security systems often run on copper lines nobody has looked at in years, and they need a new connection the local inspector accepts before the shutoff. If you have several locations, we map every copper line across your sites, get the replacement providers pricing all of them at once and negotiate the terms: commercial POTS line replacement.

Other AT&T Approvals and Applications

Before the 18-state batch, the FCC approved an initial batch of about 500 wire centers, about 10 percent of AT&T’s footprint, reported in September 2025 as taking effect in June 2026 (Light Reading, September 25, 2025). Since then, an FCC public notice released August 14, 2026 set further AT&T applications for automatic grant on September 14, 2026 absent FCC action: business lines in parts of Alabama, Arkansas, Georgia, Louisiana, South Carolina and Tennessee, on or after November 15, 2026, and residential lines in parts of Alabama, Louisiana and Mississippi, on or after September 30, 2026 (FCC public notice DA 26-861). Broadband Breakfast reported on September 29, 2026 that more AT&T applications were set for automatic approval on October 5, October 18, October 22 and November 20 (Broadband Breakfast).

The largest new filing is for business lines. AT&T’s CLEC affiliates applied on September 16, 2026 to stop selling business landline service, sold as PrimePath Service or Business Local Exchange Service, throughout 34 states and the District of Columbia. FCC public notice DA 26-1075, released October 5, says the application will be granted automatically on November 5, 2026 unless the FCC acts (WC Docket No. 26-276), and customer letters dated August 28 gave October 30 as the service discontinuance date. The New York State Public Service Commission asked the FCC on October 20 to pause it. Sources: DataRemote, October 19, 2026; Broadband Breakfast, October 22, 2026; FCC public notice DA 26-1075. The published sources do not list the 34 states, so check any AT&T business notice for PrimePath or Business Local Exchange Service lines.

WHAT THAT MEANS
The 90,000 figure counts homes and businesses together; published coverage does not split out business lines. Sort your sites into three groups: letter received, in an approved state with no letter yet, and outside the approved states. The first group sets the schedule. The second is the next wave: AT&T has roughly 4,600 copper wire centers, says it spends $6 billion a year maintaining them, and plans to retire the large majority of its copper outside California by the end of 2029 (Broadband Breakfast). The same sort works for buildings in a property management portfolio, stores in retail and restaurants, branches at banks and credit unions, or schools, hospitals and public buildings.
FOR ORGANIZATIONS WITH MANY SITES

I Got a Copper Retirement Notice: What Now?

1
Inventory every line at every site.
Lines per location and what each runs: fire alarm, elevator, alarm panel, fax, gate or call box, ATM or payment terminal, or voice. Take the numbers from the bills; the lines nobody remembers often run a panel in a back room.
2
Map each site to its carrier and its notice.
Record the carrier, the address or wire center on each letter, and its date. Sites in an approved state with no letter yet go on a second list: AT&T plans to retire the large majority of its copper outside California by the end of 2029.
3
Put life-safety lines first.
Fire alarm and elevator lines need a replacement the local authority having jurisdiction (AHJ) accepts: the fire marshal for the fire alarm communicator under NFPA 72, the elevator inspector for the emergency phone under ASME A17.1. Confirm with the AHJ before anything is installed.
4
Check contracts and rates.
Contract end dates can matter as much as the carrier’s dates. After North Carolina’s AT&T contract expired at the end of 2025, the state’s IT department published sample tariff rates of $2,460.12 a month per POTS line against $34.42 under the contract, noting that the samples may not reflect final pricing and exclude regulatory surcharges and fees (North Carolina Department of Information Technology). For comparison, a published 2026 price guide puts POTS over cellular at about $40 to $60 per line per month (source: AeroCom, August 6, 2026).
5
Send us the letters and addresses before you request quotes.
Add whatever you have of the inventory, a recent bill and contract end dates. We map which sites each letter covers and run the providers that fit at the same time. Once you ask a provider for pricing directly, that provider usually will not register an advisor on the deal.
Don’t have a full line list? Send what you have. The letters and a list of site addresses are enough to start. You’ll hear back within 24 hours, and the provider’s engineers handle the site surveys.
For organizations with multiple locations or 20 or more lines. The provider you choose pays us, so it costs you nothing.
Plan My Copper Exit

Verizon Copper Retirement: Is Verizon Discontinuing Landlines?

Yes. Verizon has approval in parts of eight states, a request under FCC review for parts of nine more, and a September 2026 filing for parts of nine more states and D.C. Verizon closed its acquisition of Frontier in January 2026, so many of the affected lines were Frontier lines. The applications cover residential and business legacy copper voice service. The town-by-town list for the eight approved states is below.

Frontier Landline Discontinued: The Eight Approved States

Verizon filed on July 7, 2026, for its Frontier companies and Verizon South, to discontinue copper POTS in portions of eight states. It said about 140,000 residential and business legacy voice lines remained in use, which it put at less than 4 percent. The FCC granted the application automatically on August 21, 2026. The application asked for authority effective on or after September 8, 2026, while the customer notices filed with it say on or after November 16, 2026, so plan around the date on your own notice letter. A companion application covers about 16,500 business lines in the same states: Centrex, ISDN BRI, PBX trunks, foreign exchange, payphone and key systems.

All eight: Verizon, including former Frontier, FCC approved August 21, 2026, earliest discontinuance on or after November 16, 2026 per customer notices.
StateCarrierStatusEarliest discontinuance
FloridaVerizon, including former FrontierFCC approved August 21, 2026On or after November 16, 2026, per customer notices
IndianaVerizon, including former FrontierFCC approved August 21, 2026On or after November 16, 2026, per customer notices
MinnesotaVerizon, including former FrontierFCC approved August 21, 2026On or after November 16, 2026, per customer notices
NebraskaVerizon, including former FrontierFCC approved August 21, 2026On or after November 16, 2026, per customer notices
NevadaVerizon, including former FrontierFCC approved August 21, 2026On or after November 16, 2026, per customer notices
North CarolinaVerizon, including former FrontierFCC approved August 21, 2026On or after November 16, 2026, per customer notices
TexasVerizon, including former FrontierFCC approved August 21, 2026On or after November 16, 2026, per customer notices
WisconsinVerizon, including former FrontierFCC approved August 21, 2026On or after November 16, 2026, per customer notices

Sources: Verizon’s July 7, 2026 applications and customer notices, as copied to the Florida Public Service Commission (states, lines in use, dates, business services); Broadband Breakfast, August 21, 2026 (automatic approval) and September 29, 2026 (confirming the earlier eight-state grant). We have not found a separate published decision on the companion business services application, so check any notice letter for those lines.

Verizon and Frontier Wire Centers by State: Where November 16 Shutoffs Can Start

Verizon’s August 7, 2026 copper retirement notices list 979 wire centers in the eight approved states, from 8 in Nevada to 274 in Texas. Most are former Frontier areas. The notices say Verizon can retire the copper network in these wire centers on or after November 6, 2026, and the customer notices put the end of copper landline service on or after November 16, 2026. As with AT&T, a listed wire center means portions of that area are affected, not every line in it. Pick a state or search for your town.

No listed Verizon wire center matches that name. Check the spelling, look for the nearest larger town, or check the AT&T list.
Florida93 wire centers
AlafiaAlturasAnna MariaAuburndaleBabson ParkBartowBayouBayshoreBeach ParkBradentonBradenton BayBradley JunctionBrandonCarrollwoodClearwaterCountrysideCypress GardensDundeeDunedinEnglewoodFeather SoundFrostproofGandyHaines City MainHaines City NorthHighlandsHudsonHyde ParkIndian Lake EstatesIndian Rocks BeachKeystoneLake AlfredLake WalesLake Wales EastLakeland EastLakeland MainLakeland NorthLand O LakesLargoLealmanLongboat KeyLutzMolinoMoon LakeMulberryMyakka CityNew Port RicheyNorth Gulf BeachNorth PortNorthsideOldsmarOspreyPalma SolaPalmettoParrishPasadenaPinecrestPinellasPlant CityPoincianaPolk CityRuskinSarasotaSarasota SpringsSeminole HeightsSeven SpringsSiesta KeySkywaySouth Gulf BeachSouthside SarasotaSt. Armands KeySt. GeorgeSt. PetersburgSt. Petersburg SouthSulphur SpringsSweetwater CreekTampaTampa EastTampa MainTarpon SpringsTemple TerraceThonotosassaUniversityVenice MainVenice SouthWallcraftWalnut HillWesley ChapelWestsideWimaumaWinter HavenYbor CityZephyrhills

Source: Verizon Florida copper retirement notice, August 7, 2026 (PDF)

Indiana224 wire centers
AkronAlbionAngolaArlingtonAtwoodAustinBatesvilleBicknellBippusBirdseyeBlountsvilleBourbonBrazilBristolBrookvilleBrownstownBurketButlerButlervilleCambridge CityCampbellsburgCarlisleCarthageCenter PointCentervilleCentralChestertonChurubusCiceroClarkshillClay CityClaypoolClearspringConnersvilleCoryCorydonCrandallCraneCrothersvilleCutlerCynthianaDeckerDelphiDuboisDunkirkDunlapElberfeldElizabethElkhart MainElkhart NorthEnglishFairbanksFairmountFarmersburgFarmlandFerdinandFort BranchFort WayneFort Wayne MainFort Wayne NorthFort Wayne NortheastFort Wayne NorthwestFort Wayne SouthFort Wayne SoutheastFort Wayne WestFountain CityFrancisFranktonFredericksburgFreelandvilleFreetownFremontFritchtonFultonGalvestonGarrettGeorgetownGlenwoodGoshenGraysvilleGreencastleGreensburgGreensforkHagerstownHamiltonHannaHanoverHarlanHaysvilleHazletonHenryvilleHobartHuntertownHuntingburgIdavilleJasperKimmellKoutsLaconiaLacrosseLafayette EastLafayette MainLafayette NorthwestLafayette SouthLafayette WestLake StationLanesvilleLaporte MainLaporte SouthLaporte SoutheastLaurelLeavenworthLeoLewisLexingtonLibertyLogansportLoogooteeLucerneLynnLynnvilleMackeyMacyMadisonMarengoMarkleMaysMechanicsburgMedoraMentoneMeromMiddleburyMilanMilltownMillwoodMilroyMitchellModocMonroe CityMonroevilleMoorelandMorristownMortonNew HavenNew MiddletownNorth ManchesterNorth VernonOakland CityOaktownOrlandOrleansOssianOwensvillePalmyraPaoliPatokaPendletonPerkinsvillePetersburgPleasant LakePoe HoaglandPokagonPortage MainPortage NorthPrairie CreekPrincetonRamseyReddingtonRedkeyReservoirRichmondRidgevilleRileyRoanokeRolling PrairieRoyal CenterRushvilleSalemScipioScottsburgSeymourShelburnShirleyShoalsSidneySilver LakeSpicelandSpringportSpurgeonSt. AnthonySt. JoeSullivanTerre Haute EastTerre Haute MainTerre Haute NorthTerre Haute NorthwestTerre Haute SouthTerre Haute WestThorntownTippecanoeUnion MillsUniondaleValparaisoVersaillesWabashWakarusaWaltonWanatahWaterlooWawakaWaynedale Oakbrook Data CenterWest College CornerWestfield MainWestfield NorthWestportWestvilleWheatlandWheelerWinchesterWindfallWoodburnWorthingtonWyattZanesville

Source: Verizon Indiana copper retirement notice, August 7, 2026 (PDF)

Minnesota161 wire centers
AdamsAdrianAlbornAlden - PoiAlmelundAlvaradoApple ValleyArcoArgyleArlingtonAskovAtwaterAuroraAvocaBabbittBalatonBear RiverBelgradeBelle PlaineBig FallsBigelowBlooming PrairieBoydBrimsonBrookstonBrownsdaleBurnsvilleButterfieldByronCanbyCannon FallsCeylonChandlerCherry GroveClaremontClarkfieldClarks GroveClear LakeClearwaterComfreyCosmosCottonwoodCrane LakeCromwellCurrieDawsonDelanoDelftDenhamDexterDodge CenterEast ChainEdgertonEllendaleEllsworthElrosaElyElysianEmbarrassEricsburgFairmontFarmingtonFinlaysonFloodwoodFountainGarrisonGatewayGhentGreaneyGreen IsleHallockHanley FallsHardwickHayfieldHazel RunHectorHendersonHermanHollandaleHoyt LakesInternational FallsIonaIsabellaIsleIvanhoeJacobsonJanesvilleJasperJordanKabetogamaKandiyohiKennedyKenyonKettle RiverKiester - PoiKilkennyKimberlyLake Lillian (Hector)Lake WilsonLakefieldLakevilleLe CenterLe RoyLeotaLewisvilleLindstromLittleforkLyleLyndMadisonMalmoMaple PlainMayerMcgrathMcgregorMeadowlandsMilacaMontgomeryMoundMountain LakeNew GermanyNickersonNorthropOdinOkabenaOnamiaOsloPalisadePaloPeasePorterPrinsburgRanierRaymondRosemountScandia-MarineSherburnSlaytonSt BonifaciusSt LeoStephenSturgeon LakeSveaTaylors FallsTowerTrimontTrumanTwo HarborsTylerWahkonWanamingoWarbaWarrenWatertownWatervilleWelcomeWestncordWheatonWorthingtonWrightWyoming

Source: Verizon Minnesota copper retirement notice, August 7, 2026 (PDF)

Nebraska37 wire centers
AlbionAlmaAmherstBattle CreekBeaver CityBertrandBloomingtonBrunswickColumbusDuncanEdisonFranklinGenoaGreeleyHeartwellHildrethKearneyLeighLindsayMadisonMillerMonroeNaponeeNelighNewman GroveOrchardOrdOrleansPalmerPlatte CenterPleasantonRepublican CityRiverdaleStamfordSumnerTildenWilsonville

Source: Verizon Nebraska copper retirement notice, August 7, 2026 (PDF)

Nevada8 wire centers
CarlinElkoLamoilleLee-JiggsMontelloRuby ValleyWellsWendover

Source: Nevada Public Utilities Commission advice letter, Elko Division (PDF)

North Carolina42 wire centers
AltonAndrewsBakersvilleBryson CityBurnsvilleCashiersCherokeeCreedmoor-ButnerCreedmoor-Fleming StreetCullowheeDurham AngierDurham BennettDurham BragtownDurham HoltDurham LakewoodDurham MainDurham NelsonDurham ParkwoodDurham Research Triangle ParkDurham WattsFontanaFranklinGarden CityGlenwoodGoose CreekGuntertownHayesvilleHighlandsHot SpringsKnotts IslandMarionMars HillMarshallMicavilleMonroeMurphyOld FortRobbinsvilleSevierSuitSylvaWeaverville

Source: Verizon North Carolina copper retirement notice, August 7, 2026 (PDF)

Texas274 wire centers
Agua DulceAlbaAransas PassArgyleArla MainAzleBacliffBallingerBangsBardwellBarnhartBartonvilleBatsonBaytownBaytown NorthBaytown WestBeach CityBellsBen WheelerBertramBig LakeBig SandyBirthrightBishopBlanBlanketBlessingBloomingtonBlue RidgeBoerneBohhamBolingBradyBrashearBriggsBristolBronteBrownwoodBryanBryan LakeviewBryan SteephollowBuchanan DamBudaBurnetBurtonCaddo MillsCaldwellCantonCarlsbadCarrollton MainCarrollton NorthCarrollton NortheastCarrollton SoutheastCashCelesteCharlotteChristovalCollege Station MainCollege Station Post OakCollege Station Spring CreekCollinsvilleComoCrosbyDaleDeanvilleDel Rio EastDel Rio MainDentonDeversDfw Airport MainDickinsonDilleyDime BoxDorchesterDripping SpringsEast BernardEctorEdenEldoradoEmhouseEmoryFalfurriasFayettevilleFentressFerrisFloresvilleFredericksburgGarland MainGarland NorthGarland SouthGarland SoutheastGeorge WestGeorgetown MainGiddingsGillettGilmerGladewaterGoldthwaiteGonzalesGordonvilleGrand SalineGrangerGranite Shoals MainGrapevine MainGunterGustineHallsville MainHardinHawkinsHendersonHighlandsHitchcockHoweHuffmanHullInglesideIrving EastIrving MainIrving NorthIrving SouthwestIrving WestIrving WoodbineJacksonJacksonvilleJarrellJohnson CityJosephineJourdantonJunctionJustinKeller MainKemahKemah Lake ShoreKilgore MainKingslandKosciuskoKurtenKyleLa FeriaLa GrangeLa VerniaLake BrownwoodLeague City MainLemanLeonardLewisville Garden RidgeLewisville MainLewisville Round GroveLewisville SouthLewisville WestLexingtonLlanoLondonLone OakLyfordLytton SpringsMancheMarble FallsMartindaleMasonMaypearlMcDadeMenardMeritMertzonMilesMiller GroveMont BelvieuMount VernonMyrtle SpringsNassau BayNevadaNew SummerfieldNew WaverlyNixonNorthrupOaklandOdemOrange GroveOzonaPaigePaint RockPalaciosPalmerPicktonPilot PointPine MillsPlano CrosscreekPlano MainPlano NorthPlano NorthwestPlano WestPointPoint ComfortPort LavacaPort O’ConnorPortlandPothPremontQuinlanQuitmanRaymondvilleRaywoodRed SpringsReno (Parker)RiceRio Grande CityRoaneRobert LeeRobstownRoma MainRosharonRound MountainRowena MainRowlettRuskSan Angelo MainSan Angelo SoutheastSan Angelo WestSan GabrielSanta RoseSante FeSaratogaSchulenburgSeadriftShepherdSherman MainShirleySmileySnook TunisSomersetSomervilleSonoraSpringtownStaffordSterling CityStonewallSulphur SpringsSutherland SpringsTaftTawakoniTelephoneThorndale-ThrallThree RiversTiogaTivoli-AustwellTom BeanTowTrentonTurnertownUplandVanVan AlstyneVanderbiltVenusWallisWalnut HillWater ValleyWeaverWeimarWesla MainWhitehouseWhitesboroWhitewrightWillis MainWillow CityWilmerWimberley MainWindomWinfieldWinnsboroWintersWylie MainZephyr

Source: Verizon Texas copper retirement notice, August 7, 2026 (PDF)

Wisconsin140 wire centers
AdamsAllentonAntigoArenaArgonneAthensBaileys HarborBear CreekBelgiumBelleville (State Highway 69)BirnamwoodBloom CityBowlerBriggsvilleBrillionBristolBrodheadBrooklynCambridgeCampbellsportCascadeCecilCedar GroveChiltonClintonClintonville/TandemClymanCobbColbyCottage GroveCrandonCrescent LakeDarienDeerfieldDodgevilleEagle RiverEdenEdgarEdgertonEgg HarborElchoElkhart LakeGreenbushGreshamHatleyHilbertHollandaleHustisfordIthacaJacksonportJohnsburgKeshenaKewaskumKielLac Du FlambeauLake MillsLake TomahawkLand O LakesLebanonLime RidgeLodiLoganvilleLomiraLone RockLoyalLyndon StationMapletonMarathonMarionMarshallMarshfieldMattoonMaustonMcFarlandMerrillMerrimacMineral PointMinocquaMishitMondoviMonroe CenterMontelloMount CalvaryNeopitNeoshoNew HolsteinNew Richmond/TandemOakfieldOostburgOregonOrfordvilleOwenPardeevillePelican LakePhelpsPickerelPlainPlymouthPortageRandom LakeReedsburgReedsvilleRhinelander/TandemRib LakeRichland CenterRidgewaySalemSauk CitySaynerShawanoSilver LakeSister BaySlingerSpencerSpring GreenSt CloudStar PrairieStratfordSugar CampSun PrairieTheresaThree LakesTigertonTomahawkTrevorTwin LakesTwo RiversViroqua/TandemWalworthWashington IslandWaterlooWaubekaWausau MainWausau NorthwestWausau SchofieldWestfieldWhite LakeWhitelawWisconsin DellsWitwen

Source: Verizon Wisconsin copper retirement notice, August 7, 2026 (PDF)

Notes: Wisconsin’s notice gives a total of 136 and Minnesota’s 163, while the lists in those notices name 140 and 161; we show every name listed. The North Carolina list includes Knotts Island, which Verizon filed in a separate notice. Nevada’s eight Elko-area wire centers come from a filing with the Nevada Public Utilities Commission rather than an FCC notice. Your own notice letter is the final word for your line.

The Nine States Under FCC Review

Verizon’s August 10, 2026 request covers 382 wire stations in former Frontier territory and 280 Verizon-branded wire stations, with Ohio (245) and Virginia (211) the largest. Verizon said about 277,000 legacy voice lines remain in use across that footprint. The FCC’s public notice of August 26, 2026 said the request would be granted automatically on September 26, with discontinuance proposed on or after October 23, 2026. On September 25 the FCC removed it from automatic grant because it “requires additional time to complete its review,” adding that the removal is not a final determination on the merits. Virginia and New Jersey officials raised concerns with the FCC. No FCC decision had been published as of October 24, 2026.

All nine: Verizon, under FCC review, earliest discontinuance not set until the FCC acts.
StateCarrierStatusEarliest discontinuance
ArizonaVerizonUnder FCC reviewNot set until the FCC acts
DelawareVerizonUnder FCC reviewNot set until the FCC acts
New JerseyVerizonUnder FCC reviewNot set until the FCC acts
New MexicoVerizonUnder FCC reviewNot set until the FCC acts
OhioVerizonUnder FCC reviewNot set until the FCC acts
Rhode IslandVerizonUnder FCC reviewNot set until the FCC acts
South CarolinaVerizonUnder FCC reviewNot set until the FCC acts
UtahVerizonUnder FCC reviewNot set until the FCC acts
VirginiaVerizonUnder FCC reviewNot set until the FCC acts

Sources: Fierce Network, September 28, 2026 (states, wire stations, FCC statement, state concerns); FCC public notice DA 26-890, August 26, 2026 (automatic grant date and proposed date); Broadband Breakfast, September 29, 2026 (277,000 lines in use, removal notice issued Friday, September 25); Benton Institute summary of the FCC notice.

WHAT THAT MEANS
Under review is not denied: the FCC has said only that it needs more time. Inventory the lines in these nine states now so you can move once a decision is published. Verizon’s approvals also overlap five of AT&T’s 18 states, so a chain or branch network in Florida, Indiana, North Carolina, Texas or Wisconsin can get notices from both carriers, with different dates, for different sites.

The September 2026 Filing: Nine More States and D.C.

On September 9, 2026, Verizon filed to discontinue legacy copper voice service in portions of California, Connecticut, the District of Columbia, Illinois, Maryland, Massachusetts, Michigan, New York, Pennsylvania and West Virginia, with a proposed date of on or after November 30, 2026. Verizon said only about 750,000 residential and business locations in those areas, about 2.7 percent, still subscribe to legacy voice. We have not found an FCC public notice accepting this application, which starts the 31-day automatic grant clock, so treat the November 30 date as Verizon’s proposal, not an approval.

All ten: Verizon, filed September 9, 2026, pending, proposed on or after November 30, 2026.
StateCarrierStatusProposed date
CaliforniaVerizonFiled September 9, 2026; pendingOn or after November 30, 2026
ConnecticutVerizonFiled September 9, 2026; pendingOn or after November 30, 2026
District of ColumbiaVerizonFiled September 9, 2026; pendingOn or after November 30, 2026
IllinoisVerizonFiled September 9, 2026; pendingOn or after November 30, 2026
MarylandVerizonFiled September 9, 2026; pendingOn or after November 30, 2026
MassachusettsVerizonFiled September 9, 2026; pendingOn or after November 30, 2026
MichiganVerizonFiled September 9, 2026; pendingOn or after November 30, 2026
New YorkVerizonFiled September 9, 2026; pendingOn or after November 30, 2026
PennsylvaniaVerizonFiled September 9, 2026; pendingOn or after November 30, 2026
West VirginiaVerizonFiled September 9, 2026; pendingOn or after November 30, 2026

Source: DataRemote, Verizon Section 214 application, September 2026 (states, locations, proposed date, filing status). Checked October 24, 2026.

Lumen, CenturyLink and Other Carriers

Lumen (CenturyLink) closed new copper POTS orders across its legacy territory in 2025 and publishes rolling copper retirement notices (source: DataRemote Copper Retirement Bulletin, Q3 2026).

Smaller carriers are filing too. Fidium, formerly Consolidated Communications, applied in August 2026 to discontinue legacy service in parts of eight states, mostly Maine and New Hampshire, from September through November 2026 (Broadband Breakfast, August 21, 2026).

AT&T Copper Retirement in California

California sits outside AT&T’s 2029 target because of its carrier of last resort rules. On May 20, 2026, AT&T filed two applications with the FCC to discontinue legacy voice service in portions of 360 California wire centers: about 184,000 residential and 15,000 business customers, with discontinuance proposed on or after June 1, 2027. The California Public Utilities Commission filed comments at the FCC on June 15, 2026. On June 29, 2026, the FCC approved AT&T’s request to discontinue copper voice service at more than 184,000 California locations, with customers keeping service until on or after June 1, 2027 (Broadband Breakfast; Light Reading). Two fights continue: AT&T’s petition asking the FCC to preempt California’s rules is still pending, and AT&T has sued the state in federal court, where California has asked the judge to dismiss the case. Verizon’s September 2026 filing also covers parts of California.

AT&T’s discontinued-service workbook, which lists more than 100,000 location entries, now spans 21 states: the 18 approved states plus California, Illinois and Nevada (source: DataRemote Copper Retirement Bulletin, Q3 2026).

Sources: California Public Utilities Commission, AT&T federal applications (filing date, customers, wire centers, proposed date, CPUC filings); Broadband Breakfast, June 8, 2026 (preemption request); Broadband Breakfast, July 6, 2026 and Light Reading, July 7, 2026 (June 29 approval); Broadband Breakfast, September 23, 2026 (lawsuit).

AT&T Copper Retirement in Illinois

Illinois sits in between. AT&T’s December 1, 2025 federal application listed 79 Illinois wire centers alongside the 18 states, under the same “on or after November 15, 2026, pending regulatory approval” language. But reporting on the January 12, 2026 grant counts 18 states, and the letters AT&T sent Illinois landline customers say traditional landline service will be discontinued on or after March 15, 2027. The Citizens Utility Board says state officials have approved AT&T moving forward, and an Illinois customer without a reliable alternative for voice and 911 can ask the Illinois Commerce Commission to look into it. As of October 26, 2026, we have not found an FCC document confirming whether the Illinois portion was granted, so plan around the date on your own letter.

Two bills backed by the Citizens Utility Board, House Bill 4562 and Senate Bill 3965, would require AT&T to keep operating its copper network for five more years. Separately, Verizon’s September 9, 2026 filing covers portions of Illinois.

Illinois: AT&T letters say on or after March 15, 2027; federal approval for Illinois not confirmed. Verizon filed September 9, 2026, pending.
CarrierStatusDate
AT&TListed in the December 2025 federal application; approval for Illinois not confirmed; state approval reportedOn or after March 15, 2027, per customer letters
VerizonFiled September 9, 2026; pendingOn or after November 30, 2026, proposed

Sources: AT&T’s December 1, 2025 Section 214 application, Exhibit 1, as copied to the Florida Public Service Commission (79 Illinois wire centers); Broadband Breakfast, January 13, 2026 (18-state grant); Citizens Utility Board, March 16, 2026 and December 2, 2025 (letter date, state approval, Illinois Commerce Commission, bills); NBC Chicago, December 6, 2025 (letters to customers). Checked October 26, 2026.

When Are POTS Lines Being Discontinued? The Key Dates

POTS lines are being discontinued wire center by wire center, on dates set by each carrier’s approval and notice letters.

Copper retirement timeline: AT&T, Verizon and the FCC
WHAT HAS HAPPENED
September 2025

AT&T’s first approved batch, about 500 wire centers, reported as taking effect in June 2026.

November 2025

AT&T notifies customers in 18 states of discontinuance starting November 15, 2026.

January 12, 2026

The FCC grants AT&T’s 18-state application automatically.

March 26, 2026

The FCC adopts FCC 26-19 unanimously; it is released March 27.

May 20, 2026

AT&T files to discontinue legacy voice in portions of 360 California wire centers.

June 29, 2026

The FCC approves AT&T’s California discontinuance, about 184,000 locations, effective on or after June 1, 2027.

July 7, 2026

Verizon files for portions of eight states, mostly through its former Frontier companies.

August 10, 2026

Verizon files for nine more states.

August 14, 2026

FCC notice sets more AT&T applications, in parts of seven Southern states, for automatic grant on September 14.

August 21, 2026

Verizon’s eight-state application is granted automatically.

September 9, 2026

Verizon files for portions of nine more states and D.C.

September 25, 2026

The FCC removes the nine-state request from automatic grant, a day before its September 26 date.

October 5, 2026

FCC notice sets AT&T’s business-line application for 34 states and D.C. for automatic grant on November 5.

WHAT COMES NEXT
November 5, 2026

Automatic grant date for AT&T’s business-line application in 34 states and D.C., unless the FCC acts.

November 6, 2026

Verizon can begin retiring copper facilities in the listed wire centers of its eight approved states, per its August 7 notices.

November 15, 2026

AT&T discontinuance can begin in the 18-state batch, site by site.

November 16, 2026

Date on Verizon’s notices for its eight approved states.

November 30, 2026

Verizon’s proposed date for its September filing, nine states and D.C., pending FCC action.

No date set

The FCC’s decision on Verizon’s nine-state request.

June 1, 2027

AT&T’s California discontinuance can begin, under the FCC’s June 29 approval.

End of 2029

AT&T’s target to retire the large majority of its copper outside California.

Sources: Light Reading, September 25, 2025; Broadband Breakfast, January 13, 2026; FCC public notice DA 26-861; FCC 26-19; California Public Utilities Commission; Verizon filing copied to the Florida PSC; Broadband Breakfast, August 21, 2026; Fierce Network, September 28, 2026; Broadband Breakfast, September 29, 2026; Broadband Breakfast, July 6, 2026; DataRemote (Verizon September filing); DataRemote, October 19, 2026 (DA 26-1075). Free to cite with a link to this page.

FCC Copper Retirement 2026: What FCC 26-19 Changed

FCC 26-19, “Reducing Barriers to Network Improvements and Service Changes; Accelerating Network Modernization,” was adopted unanimously on March 26, 2026 and released March 27 (WC Docket Nos. 25-209 and 25-208). Here is what it changed, in plain terms, and what each change means for a multi-site organization.

What the order doesIn plain termsWhat it means for a multi-site organization
Network change disclosuresFiling requirements eliminatedThe FCC no longer issues public notices or runs an objection process for copper retirements. Carriers still post notice of planned changes publicly, for example on their own websites.Copper retirement notices are no longer collected in one FCC filing, though discontinuance applications still appear in FCC public notices. The carrier’s notice to you and your own line inventory are the signals that matter site by site.
Section 214 discontinuance31-day automatic grantEvery carrier’s discontinuance application is granted automatically 31 days after public notice unless the FCC acts.Approvals arrive quickly. Verizon’s nine-state request shows the FCC can still pull an application for more review.
Blanket grandfatheringNo new customers on legacy serviceCarriers may stop selling legacy copper voice, data below 25/3 Mbps and interconnected VoIP over copper to new customers.A new building or a new account may not be able to order a copper line at all, even before the existing lines are shut off.
State and local rulesSubject to preemptionState and local rules that force carriers to keep legacy networks running after FCC approval are subject to preemption.Do not plan on a state rule keeping a line in service after federal approval. California is the case being argued now.
Notice timeNot a rule the FCC setIndustry analyses of the order put the gap between a customer notice and disconnection at as little as 90 days.Ninety days is short for permits, sign-off from the fire marshal or elevator inspector, and installs across dozens of buildings.

Sources: FCC 26-19, Report and Order (paragraphs 5 to 7, 12 and 22); FCC press release, March 26, 2026; Broadband Breakfast, March 26, 2026 (unanimous vote); notice time from an industry analysis (source: vCom, July 16, 2026).

WHAT THAT MEANS
For a portfolio, the clock that matters is how long it takes to inventory every line, get each fire alarm line replacement accepted by the fire marshal and each elevator phone replacement accepted by the elevator inspector, and schedule installs across every building.
How long do you have?
Less than the dates suggest. AT&T’s 18-state batch can start November 15, 2026, industry analyses put notice at as little as 90 days, and permits, sign-off from the fire marshal or elevator inspector, and installs across dozens of buildings all have to fit inside that window. Send the letters and addresses before you sign anything or request quotes. The carrier’s own replacement is one option, not the only one. For organizations with multiple locations or 20 or more lines.
Plan My Copper Exit

Copper Retirement Tracker Log

Every development on this page, with the date it happened, the date we logged it and its source. New approvals, requests and FCC actions are added here as they are announced.

Entries below logged October 14, 24 and 26 and November 1, 2026.
LoggedEvent dateCarrier or agencyWhat happenedSource
October 14, 2026September 2025AT&TReported FCC approval for an initial batch of about 500 wire centers, about 10 percent of AT&T’s footprint, set to take effect in June 2026.Light Reading
October 14, 2026November 2025AT&TCustomers in wire centers in 18 states told that copper landline service could be discontinued starting November 15, 2026.Broadband Breakfast
October 26, 2026Late 2025AT&TLetters tell Illinois landline customers that traditional landline service will be discontinued on or after March 15, 2027. AT&T’s December 1, 2025 federal application listed 79 Illinois wire centers, but reporting on the January 12 grant counts 18 states; no FCC document confirming the Illinois portion found as of October 26, 2026.Citizens Utility Board; NBC Chicago; AT&T application
October 14, 2026December 1, 2025AT&TApplies to the FCC to discontinue copper landline service in wire centers serving about 90,000 customers in 18 states.Broadband Breakfast
October 14, 2026January 12, 2026FCC, AT&TAT&T’s 18-state application granted automatically, 31 days after public notice (reported January 13).Broadband Breakfast
October 14, 2026January 2026VerizonCloses its acquisition of Frontier.Fierce Network
October 14, 2026March 26, 2026FCCAdopts FCC 26-19 unanimously, released March 27: network change disclosure filings eliminated, 31-day automatic grant for all discontinuance applications, blanket grandfathering, preemption of conflicting state and local rules.FCC 26-19
October 14, 2026May 2026FCCReports 15.0 million retail switched access lines at June 30, 2025, down from 18.2 million a year earlier (about 17.6 percent, MCA calculation); 8.6 million are business lines.FCC Voice Telephone Services report
October 14, 2026May 20, 2026AT&TFiles to discontinue legacy voice in portions of 360 California wire centers, about 184,000 residential and 15,000 business customers, proposed on or after June 1, 2027. Granted June 29, 2026; see the next entry.California Public Utilities Commission
October 24, 2026June 29, 2026FCC, AT&TFCC approves AT&T’s request to discontinue copper voice service at more than 184,000 California locations; service continues until on or after June 1, 2027. AT&T’s petition to preempt California rules is still pending.Broadband Breakfast; Light Reading
October 14, 2026July 7, 2026VerizonFiles, through its Frontier companies and Verizon South, for portions of eight states, with about 140,000 legacy voice lines in use, plus a companion application for about 16,500 business lines.Copy filed with the Florida PSC
November 1, 2026August 7, 2026VerizonCopper retirement notices list 979 wire centers in the eight approved states, with copper facilities retired on or after November 6, 2026; customer notices set the end of copper landline service on or after November 16. Town-by-town lists added to this page.Verizon Florida notice; Verizon Texas notice; The Mountain Buzz, October 14, 2026
October 14, 2026August 9, 2026AT&TStops service in another batch of areas the FCC had allowed it to discontinue after network damage.Broadband Breakfast
October 14, 2026August 10, 2026VerizonFiles for nine states: Arizona, Delaware, New Jersey, New Mexico, Ohio, Rhode Island, South Carolina, Utah and Virginia.Fierce Network
October 14, 2026August 14, 2026FCC, AT&TPublic notice sets further AT&T applications for automatic grant on September 14, 2026 absent FCC action: business lines in parts of Alabama, Arkansas, Georgia, Louisiana, South Carolina and Tennessee (on or after November 15, 2026) and residential lines in parts of Alabama, Louisiana and Mississippi (on or after September 30, 2026).FCC DA 26-861
October 14, 2026August 17, 2026IndustryIndustry bulletin reports a tally of 494 AT&T copper retirement notices in 2025, AT&T’s discontinued-service workbook spanning 21 states, and Lumen’s 2025 close of new copper POTS orders.Source: DataRemote Copper Retirement Bulletin, Q3 2026
October 14, 2026August 21, 2026FCC, VerizonVerizon’s eight-state application granted automatically.Broadband Breakfast
October 14, 2026Reported August 21, 2026AT&THas approval to discontinue legacy services at more than 30 percent of its roughly 4,600 copper wire centers, effective late 2026, and to stop selling them to new customers at more than 85 percent of its wire centers.Broadband Breakfast
October 14, 2026Reported August 21, 2026AT&TAsks the FCC for authority not to restore service in more than 600 areas across 16 states where copper was damaged by theft or equipment failure (maps filed July 28 and August 14).Broadband Breakfast
October 14, 2026Reported August 21, 2026FidiumApplies to discontinue legacy service in parts of eight states, more than 790,000 passings serving only 500 customers, from September through November 2026.Broadband Breakfast
October 14, 2026August 26, 2026FCC, VerizonPublic notice sets the nine-state request for automatic grant on September 26, 2026, with discontinuance proposed on or after October 23, 2026.FCC DA 26-890
October 24, 2026September 9, 2026VerizonFiles to discontinue legacy copper voice in portions of California, Connecticut, D.C., Illinois, Maryland, Massachusetts, Michigan, New York, Pennsylvania and West Virginia, where about 750,000 locations still use legacy voice; proposed on or after November 30, 2026. No FCC acceptance notice found as of October 24.DataRemote
October 14, 2026September 25, 2026FCC, VerizonNine-state request removed from automatic grant: the FCC “requires additional time to complete its review.” Not a final determination.Fierce Network; Broadband Breakfast
October 14, 2026Reported September 29, 2026AT&TMore AT&T discontinuance applications set for automatic approval on October 5, October 18, October 22 and November 20, 2026.Broadband Breakfast
October 24, 2026October 5, 2026FCC, AT&TPublic notice DA 26-1075: AT&T’s CLEC affiliates’ application to discontinue business landline service (PrimePath Service and Business Local Exchange Service) in 34 states and D.C. will be granted automatically on November 5, 2026 absent FCC action (WC Docket No. 26-276).DataRemote; Broadband Breakfast
October 24, 2026October 20, 2026New York PSCFiles comments urging the FCC to pause AT&T’s business-line application under DA 26-1075, saying it should be granted only with protection for critical services.Broadband Breakfast
October 24, 2026October 24, 2026FCC, VerizonStatus check: no FCC decision published on Verizon’s nine-state request, removed from automatic grant on September 25.Fierce Network
HOW TO CITE THIS PAGE
Metro Colo Advisory, “Copper Retirement Tracker: AT&T, Verizon and Lumen,” https://metrocoloadvisory.com/copper-retirement-tracker/, figures as of October 2026, with the date you accessed it. Cite carrier dates and figures to their original sources, linked beside each one; the map, the state counts and the MCA calculations can be cited to this page. The data is free to download as CSV files on our copper retirement data page.

How We Place POTS Replacement

1

You send the letters and the line list

Carrier notice letters, site addresses, lines per location and what each runs, a recent bill and contract end dates. Rough numbers are fine.

2

We run the providers that fit, at once

The providers that fit your line types and sites see the same list on the same day, so prices compare line by line and site by site.

3

The provider’s engineers survey the sites

Signal at each fire panel and elevator machine room, power and backup. The provider’s team does the survey and installation; we do not install equipment, monitor alarms or sell hardware.

4

We negotiate and you sign

Price per line, equipment, monitoring, the install schedule and contract terms, settled while they are still negotiable. You sign with the provider you choose.

5

The provider pays us

The provider you choose pays us, so it costs you nothing.

Copper Retirement: Frequently Asked Questions

Are POTS lines being discontinued?

Yes, wire center by wire center. AT&T has FCC approval to begin discontinuing copper landline service in parts of 18 states starting November 15, 2026, Verizon has approval in parts of eight states, and Lumen closed new copper POTS orders across its legacy territory in 2025. The FCC's March 2026 order made carrier applications to discontinue legacy service faster to approve.

When are POTS lines being discontinued?

It depends on the carrier and the wire center. AT&T's 18-state batch approved in January 2026 can start on November 15, 2026, Verizon's customer notices for its eight approved states say on or after November 16, 2026, and AT&T plans to retire the large majority of its copper outside California by the end of 2029. The date on your own notice letter is the one that applies to that site.

What is copper retirement?

Copper retirement, also called the copper sunset, is a carrier shutting down its copper telephone network and the landline service that runs on it. The carrier files with the FCC to discontinue the service, notifies customers and offers a replacement over its broadband network or wireless. Fire alarm panels, elevator phones, alarm panels, fax machines and ATMs that still use those lines need a new connection before the shutoff.

Which states is AT&T discontinuing copper landlines in?

AT&T's January 2026 approval covers wire centers in 18 states: Alabama, Arkansas, Florida, Georgia, Indiana, Kansas, Kentucky, Louisiana, Michigan, Missouri, Mississippi, North Carolina, Ohio, Oklahoma, South Carolina, Tennessee, Texas and Wisconsin. The FCC approved it on January 12, 2026, and discontinuance can start November 15, 2026. The FCC also approved AT&T’s application for portions of 360 California wire centers on June 29, 2026, effective on or after June 1, 2027. Separately, an application to end business landline service sold by AT&T’s CLEC affiliates in 34 states and D.C. is set for automatic grant on November 5, 2026.

What does an AT&T landline discontinued letter mean?

It means AT&T has included the copper service at that site in a discontinuance filing, and once the FCC approves it, as it did for the 18-state batch in January 2026, the service can be shut off on or after the date in the letter. It is not a single cutoff day for every customer, and AT&T offers its own broadband-based phone service or a mobile line as the replacement. For an organization with many sites, log the letter against the site and its lines, then plan the replacement for every line there, starting with fire alarm and elevator lines.

Is Verizon discontinuing landlines?

Yes, in parts of eight states so far, with requests pending for parts of 18 more states and D.C. Its application for eight states, filed mostly through its former Frontier companies (Florida, Indiana, Minnesota, Nebraska, Nevada, North Carolina, Texas and Wisconsin), was granted automatically on August 21, 2026. Its August 10, 2026 request for Arizona, Delaware, New Jersey, New Mexico, Ohio, Rhode Island, South Carolina, Utah and Virginia was removed from automatic grant because the FCC needs more time, which is not a final decision. A September 9, 2026 filing covers parts of nine more states and D.C., proposed for on or after November 30, 2026.

Is Frontier discontinuing landlines?

Yes, through Verizon, which closed its acquisition of Frontier in January 2026. Verizon's application to discontinue copper voice service in former Frontier areas of eight states was granted on August 21, 2026, and its customer notices give a date of on or after November 16, 2026. Former Frontier territory is also part of Verizon's nine-state request now under FCC review.

Is Lumen discontinuing CenturyLink POTS lines?

Lumen closed new copper POTS orders across its legacy CenturyLink territory in 2025, so new copper lines cannot be ordered there. It also publishes rolling copper retirement notices covering wire centers in multiple states. Check any Lumen notice for the date and the sites it covers.

What did the FCC change about copper retirement in 2026?

FCC 26-19, adopted March 26, 2026, eliminated the filing requirements in the network change disclosure rules, so the FCC no longer issues public notices or runs an objection process for copper retirements. It applies a 31-day automatic grant period to all discontinuance applications, lets carriers stop selling legacy copper services to new customers, and makes state and local rules that keep legacy networks running after FCC approval subject to preemption.

How much notice does a carrier give before a copper landline shutdown?

Industry analyses of the FCC's 2026 order put the gap between a customer notice and disconnection at as little as 90 days. That is not a rule the FCC set, and AT&T's 18-state batch gave about a year: notices in November 2025 for a start date of November 15, 2026. Plan for the short case, because permits, inspections and installs across many buildings take time.

Will my AT&T POTS line price go up?

It can when a contract that held the rate ends. One public example: after North Carolina's AT&T contract expired at the end of 2025, the state's IT department published sample tariff rates of $2,460.12 a month per POTS line against $34.42 under the contract, noting the samples may not reflect final pricing and exclude regulatory surcharges and fees. That is one state's published sample, not a forecast of anyone else's bill, but it is a reason to check every contract end date in your portfolio before the carrier's dates.

What happens to fire alarm and elevator lines when copper is retired?

They need a new communication path before the copper line is shut off, and the local authority having jurisdiction decides whether the replacement is acceptable. Fire alarm panels are reviewed by the fire marshal under NFPA 72, and elevator emergency phones by the elevator inspector under ASME A17.1. Confirm the replacement with the AHJ before installation.

Do we have to take the carrier's own replacement?

No. The carrier's replacement is one option, not the only one, and for a portfolio with many line types it may not fit every line. Replacement providers price the same line list differently depending on line type, coverage at each site and monitoring, so running them at the same time is how you compare real totals.

How often is this copper retirement tracker updated?

We update it as new carrier approvals, requests and FCC actions are announced, not on a fixed schedule. Every change is added to the tracker log with the date it happened, the date we logged it and its source. Figures on this page are as of October 2026.

Got Carrier Letters? Send Them Before You Request Quotes

Send the notice letters and your site addresses, with whatever you have on lines per site, what each line runs, a recent bill and contract end dates. A full inventory is not needed to start. You'll hear back within 24 hours: we map which sites the letters cover and line up the providers that fit, and their engineers handle the site surveys. Send it before you sign anything or request quotes, because once you ask a provider for pricing directly, it usually will not register an advisor on the deal and you negotiate alone. If you have one building and a couple of lines, your carrier’s own replacement may be the simplest answer, and we will say so.

For organizations with multiple locations or 20 or more lines, from 3 buildings to 300.
The provider you choose pays us, so it costs you nothing. If you have already spoken to one provider, tell us which; we can still run the rest of the market.