Phoenix Colocation
Phoenix and Arizona Data Centers: Providers, Submarkets and Pricing

Phoenix colocation sits in one of North America's tightest data center markets, with power now the limit on new supply. Send us the requirement before you call a data center, and we find the Phoenix space that fits and negotiate the price and terms, at no cost to you.

Price My Phoenix Requirement
For companies needing colocation in Phoenix The available space, found for you Paid by the provider, never by you

Phoenix colocation means renting space, power and connectivity for your own servers in one of the Phoenix metro's data centers, from the downtown carrier hotel at 120 East Van Buren Street to the campuses near Sky Harbor Airport and in Chandler, Mesa and the West Valley. The Phoenix metro holds most of Arizona's data centers: Maricopa County now hosts about 2,381 MW of operating data center capacity, with another 2,978 MW planned or under construction, which makes Phoenix one of the largest and fastest-growing data center markets in North America. In the first half of 2026, Phoenix absorbed 442 MW with 1.7 GW under construction, according to JLL. It is also one of the tightest: CBRE put Phoenix vacancy at 1.7 percent and average rents at about $190 per kW per month in early 2025, and the main utility, APS, has said it is turning away new data center customers for lack of power. For a buyer, that means the space that exists today is what there is, and the requirement should reach every Phoenix data center that can serve it at the same time.

OPERATING
~2,381 MW
data center capacity in Maricopa County (RadiusDC)
PIPELINE
~2,978 MW
planned or under construction (RadiusDC)
ABSORPTION
442 MW
absorbed in the first half of 2026 (JLL)
UNDER CONSTRUCTION
1.7 GW
Phoenix, first half of 2026 (JLL)

Sources: RadiusDC Phoenix market overview (capacity, pipeline and utility figures); CBRE Global Data Center Trends 2025 (vacancy and rent); JLL North America Data Center Report, H1 2026 (absorption and construction). CBRE's Phoenix vacancy and rent figures are from Q1 2025; JLL put Phoenix vacancy at about 3 percent at midyear 2025. JLL figures added November 2026; other figures as of September 2026.

Looking for colocation in Phoenix? Why talk to us before you call an operator

Every operator at once

One requirement goes to Digital Realty, Csquare, DataBank, Flexential, RadiusDC and other Phoenix operators that fit, on the same day. Call a data center directly and its sales team prices you as the only option.

What is available now

With vacancy under 2 percent and new power scarce, we find out which Phoenix buildings have space and power at your density on your date, before you spend weeks on tours.

Better terms, not just a rate

Escalators, cross-connects, expansion rights and renewal caps are negotiated before you sign, when they are still negotiable.

No cost to you

The operator you choose pays us from its channel budget. Your rate is not marked up, and you'll hear back within 24 hours.

Price My Phoenix RequirementSend the requirement before you contact an operator.
Why new Phoenix capacity is scarce: data center power requests at APS
Megawatts, Arizona Public Service, the largest utility serving the Phoenix metro
Data center load served todaywhat APS currently supplies to data centers
~350
APS peak system capacityfor all customers, not just data centers
~8,200
Data center load if every applicant connectedpending requests
~19,000

Figures as reported in the RadiusDC Phoenix market overview, 2026. APS has publicly acknowledged turning away new data center customers; Salt River Project is running its first cluster study of 25 data center applicants. Free to cite with a link to this page.

Phoenix and Arizona Data Center Submarkets

Phoenix data centers spread across the Valley in distinct clusters. The submarket decides connectivity, price and how much room there is to grow.

SubmarketKey facilitiesBest for
Downtown Phoenixthe carrier hotelDigital Realty PHX10 at 120 East Van Buren Street, with 36-plus carriers and an internet exchangeInterconnection, peering, network-dense deployments
East Phoenix and Sky Harborthe enterprise coreIron Mountain's campus on North 48th Street, with Csquare and DataBank inside it; QTS on North 40th Street; the former phoenixNAP data center on East University Drive, now RadiusDCEnterprise colocation, hybrid cloud, compliance-heavy workloads
Chandler and Tempethe southeast corridorCyrusOne's Chandler campus, Digital Realty's Chandler data centersLarger enterprise and wholesale deployments
Mesathe East ValleyEdgeCore's campus in the Elliot Road Technology Corridor, Centersquare on West University DriveWholesale, hyperscale and AI capacity
West ValleyGoodyear, Avondale, GlendaleWholesale and hyperscale campuses, including CompassMulti-megawatt and hyperscale requirements
North PhoenixDeer ValleyFlexential on West Deer Valley RoadEnterprise colocation with managed services

Facility locations from operator announcements and public listings, September 2026.

Phoenix Data Centers and Providers: The Facilities

These are the Phoenix data centers a colocation search usually compares, grouped by operator.

OperatorPhoenix facilitiesBuilt for
Digital RealtyPHX10 at 120 East Van Buren Street downtown; data centers in ChandlerPhoenix's leading carrier hotel and interconnection hub, plus larger enterprise space
Iron MountainPhoenix campus: AZP-1 at 615 North 48th Street, AZP-2 at 4802 East Van Buren Street, AZP-3 in developmentEnterprise and hyperscale colocation on a 39-acre campus
CsquarePHX1 at 615 North 48th Street, within the Iron Mountain campusEnterprise colocation with shared access to the campus meet-me room
DataBankPHX2, Phoenix Sky Harbor, at 615 North 48th StreetEnterprise and compliance-focused colocation
QTSPhoenix 2 campus on North 40th Street, plus further Phoenix campusesHyperscale, wholesale and enterprise capacity
CyrusOneChandler campus, PHX1 through PHX7Large enterprise, wholesale and hyperscale deployments
EdgeCoreMesa campus at 3856 South Everton TerraceHyperscale and wholesale, planned at 225 MW
RadiusDC (formerly phoenixNAP)The phoenixNAP data center on East University Drive, now operated by RadiusDCColocation in one of Phoenix's carrier hotels; RadiusDC acquired phoenixNAP's data center and colocation business in 2026
FlexentialDeer Valley at 1850 West Deer Valley Road, about 5 MWEnterprise colocation with compliance and managed services
Centersquare, Compass, Aligned and othersMesa, the West Valley and across the metroEnterprise through hyperscale capacity

Facility details from operator materials and public listings, including Digital Realty PHX10 and Data Center Map, September 2026. See every operator side by side in the provider comparison.

Iron Mountain Phoenix

Iron Mountain's Phoenix campus, about ten minutes east of downtown near Sky Harbor Airport, spans 39 acres and more than a million square feet. AZP-1 and AZP-2 deliver about 89 MW combined, and AZP-3 is in development. The campus became home to North America's first BREEAM design-certified data centers, and Csquare and DataBank both operate inside it at 615 North 48th Street, so one address offers several operators to compare.

Considering Iron Mountain Phoenix? Csquare and DataBank, both inside the same campus at 615 North 48th Street, are among our channel partners. We find what is available across the rest of the Phoenix market and negotiate the price and terms before you commit, at no cost to you. Send the requirement and you'll hear back within 24 hours.

Digital Realty Phoenix

Digital Realty's PHX10, at 120 East Van Buren Street, is Phoenix's best-connected building: a fiber crossroads on almost every national backbone, with 36-plus carriers and the Digital Realty Internet Exchange. Digital Realty also operates data centers in Chandler for larger enterprise footprints.

Considering Digital Realty Phoenix? Digital Realty is one of our channel partners. We find what is available at PHX10 or Chandler alongside the other Phoenix options that fit and negotiate the price and terms, at no cost to you. Send the requirement and you'll hear back within 24 hours.

QTS Phoenix, CyrusOne Chandler and EdgeCore Mesa

The large campuses: QTS's Phoenix 2 on North 40th Street close to the Iron Mountain campus, CyrusOne's seven-building Chandler campus, and EdgeCore's Mesa campus in the Elliot Road Technology Corridor, planned at 1.2 million square feet and 225 MW. They suit requirements from several hundred kilowatts to hyperscale.

Sizing a larger Phoenix deployment? Before you start with one campus, we put the requirement in front of the Phoenix operators we place with, including Digital Realty's Chandler data centers, so the first conversation is already competitive. Send the requirement and you'll hear back within 24 hours.

Already have a Phoenix building in mind?
Send us the requirement before you call it. We find what is available from the Phoenix operators we place with, including Digital Realty, Csquare, DataBank, Flexential and RadiusDC, and negotiate the price and terms for you. There is no cost to you, and you'll hear back within 24 hours.
Send My Phoenix Requirement

Phoenix Data Centers: The Building List

Phoenix data centers on this list: 35 colocation and wholesale buildings run by 17 operators across the Phoenix metro, from Digital Realty's downtown carrier hotel at 120 East Van Buren Street and Iron Mountain's Phoenix campus to the leased hyperscale campuses in Chandler, Mesa and the West Valley, plus 2 in Tucson. Every row comes from the operator's own facility page or a public filing. Filter by area, operator or building type, or search an address.

Buildings on this list
35
Phoenix metro colocation and wholesale buildings, 17 operators
Hyperscale leases
16
of the 37 Arizona buildings are leased campuses built for one large tenant
Average lease term
7 years
for Phoenix data center capacity, H1 2026 (CBRE)
Tax exemption pause
36 months
Arizona moratorium on data center sales tax exemptions (CBRE)
Where the buildings arePhoenix metro buildings on this list, by area
Central and East Phoenix10
Chandler and Tempe7
Mesa5
West Valley4
North Phoenix and Scottsdale4
Phoenix metro, site not published5
Phoenix and Arizona data center buildings37 buildings, 19 operators, checked November 14, 2026
37 buildings
BuildingWhereTypeSizePowerSource
Iron Mountain AZP-1 PhoenixIron Mountain Data Centers615 N 48th StreetPhoenix, AZ (Maricopa)Retail and wholesale588,669 sq ft41 MWtotal capacity (basis not defined by operator)ironmountain.com
Iron Mountain AZP-2 PhoenixIron Mountain Data CentersStreet address not publishedPhoenix, AZ (Maricopa)Retail and wholesale547,000 sq ft500,000 sq ft of colocation space48 MWcritical IT, planned full buildironmountain.com
Iron Mountain AZP-3 PhoenixIron Mountain Data CentersStreet address not publishedPhoenix, AZ (Maricopa)Retail and wholesaleNot published36 MWas listed on market page (basis not defined)ironmountain.com
Digital Realty PHX10Digital Realty120 East Van Buren StreetPhoenix, AZ (Maricopa)Carrier hotel275,000 sq ftNot publisheddigitalrealty.com
QTS Phoenix 2 DC1QTS Data Centers, PHX2 DC11200 N 40th StreetPhoenix, AZ (Maricopa)Hyperscale leaseNot publishedNot publishedq.com
QTS Phoenix 2 DC2QTS Data Centers, PHX2 DC21250 N 40th StreetPhoenix, AZ (Maricopa)Hyperscale leaseNot publishedNot publishedq.com
QTS Phoenix 2 DC3QTS Data Centers, PHX2 DC31400 N 40th StreetPhoenix, AZ (Maricopa)Hyperscale leaseNot publishedNot publishedq.com
QTS Phoenix 2 DC4QTS Data Centers, PHX2 DC41450 N 40th StreetPhoenix, AZ (Maricopa)Hyperscale leaseNot publishedNot publishedq.com
QTS Phoenix 2 DC5QTS Data Centers, PHX2 DC51500 N 40th StreetPhoenix, AZ (Maricopa)Hyperscale leaseNot publishedNot publishedq.com
Centersquare PHX1 PhoenixCentersquareStreet address not publishedPhoenix, AZ (Maricopa)Retail colocation40,456 sq ft of colocation space13.3 MWUPS capacitycsquare.com
Digital Realty PHX15Digital Realty2121 South Price RoadChandler, AZ (Maricopa)Retail and wholesale508,000 sq ftNot publisheddigitalrealty.com
Aligned PHX-04Aligned Data Centers2501 S Price RdChandler, AZ (Maricopa)WholesaleNot publishedNot publishedaligneddc.com
Aligned PHX-06Aligned Data Centers2955 West Innovation StreetChandler, AZ (Maricopa)WholesaleNot publishedNot publishedaligneddc.com
CyrusOne Chandler campusCyrusOne, PHX1-PHX8Street address not publishedChandler, AZ (Maricopa)Retail and wholesale2,000,000 sq ft of colocation space169 MWtotal IT capacity, campus (operator does not say built vs planned)cyrusone.com
EdgeConneX Phoenix PHX01EdgeConneXStreet address not publishedTempe, AZ (Maricopa)Retail colocation79,200 sq ft17,300 sq ft of colocation spaceNot publishededgeconnex.com
H5 Phoenix data centerH5 Data Centers2600 W Germann RdChandler, AZ (Maricopa)Retail colocation180,000 sq ft26 MWcapacity (basis not stated)h5datacenters.com
Lincoln Chandler data centerLincoln Property Company2500 W. Frye Rd.Chandler, AZ (Maricopa)Wholesale191,000 sq ft28 MWutility power (confirmed)azbigmedia.com
Centersquare PHX3 MesaCentersquareStreet address not publishedMesa, AZ (Maricopa)Retail colocation50,256 sq ft of colocation space8 MWUPS capacity (utility capacity 17.3 MW; generator 11.5 MW)csquare.com
NTT Phoenix PH1NTT Global Data Centers10256 Elliot Rd.Mesa, AZ (Maricopa)Wholesale126,000 sq ft of colocation space36 MWcritical ITnttdata.com
NTT Phoenix PH4NTT Global Data Centers10256 Elliot Rd., Bldg 4Mesa, AZ (Maricopa)Wholesale127,000 sq ft of colocation space36 MWcritical ITnttdata.com
EdgeCore Mesa campusEdgeCore Digital InfrastructureNear Elliot Road and Everton TerraceMesa, AZ (Maricopa)Hyperscale lease3,100,000 sq ft450 MWcapacity at full build (basis not stated)ktar.com
Novva Mesa campusNovva Data CentersStreet address not publishedMesa, AZ (Maricopa)Hyperscale lease1,300,000 sq ft of colocation space300 MWtotal (basis not stated), planned full buildnovva.com
Aligned PHX-07Aligned Data Centers8785 N Reems RdWaddell, AZ (Maricopa)Hyperscale leaseNot publishedNot publishedaligneddc.com
Compass Phoenix (Goodyear) campusCompass DatacentersStreet address not publishedGoodyear, AZ (Maricopa)Hyperscale leaseNot published144 MWIT load, planned first series of buildingscompassdatacenters.com
Stream PHXA Goodyear campusStream Data Centers2950 S. Litchfield RoadGoodyear, AZ (Maricopa)Hyperscale lease2,000,000 sq ft280 MWcritical load, planned full buildstreamdatacenters.com
Vantage AZ1 Phoenix campusVantage Data Centers45 S Bullard AvenueGoodyear, AZ (Maricopa)Hyperscale lease1,000,000 sq ft176 MWcritical IT, planned full buildvantage-dc.com
Iron Mountain AZS-1 ScottsdaleIron Mountain Data Centers8521 E Princess DriveScottsdale, AZ (Maricopa)Retail colocation121,000 sq ft5.8 MWtotal capacity, 2N (operator says scalable to 9.6 MW)ironmountain.com
Aligned PHX-01, PHX-02, PHX-03Aligned Data Centers, PHX-01/02/032500 W Union Hills DrivePhoenix, AZ (Maricopa)Retail and wholesaleNot publishedNot publishedaligneddc.com
Aligned PHX-05Aligned Data Centers2500 W Union Hills DrivePhoenix, AZ (Maricopa)WholesaleNot publishedNot publishedaligneddc.com
Flexential Phoenix - Deer ValleyFlexentialStreet address not publishedPhoenix, AZ (Maricopa)Retail colocation109,476 sq ft5 MWcritical load UPS capacityflexential.com
Prime Phoenix PHX01 building 1Prime Data Centers, PHX01-01Street address not publishedAZHyperscale lease267,000 sq ft48 MWcritical ITprimedatacenters.com
Prime Phoenix PHX01 building 2Prime Data Centers, PHX01-02Street address not publishedAZHyperscale lease267,000 sq ft48 MWcritical ITprimedatacenters.com
Prime Phoenix PHX01 building 3Prime Data Centers, PHX01-03Street address not publishedAZHyperscale lease267,000 sq ft48 MWcritical ITprimedatacenters.com
Prime Phoenix PHX01 building 4Prime Data Centers, PHX01-04Street address not publishedAZHyperscale lease267,000 sq ft48 MWcritical ITprimedatacenters.com
Prime Phoenix PHX01 building 5Prime Data Centers, PHX01-05Street address not publishedAZHyperscale lease267,000 sq ft48 MWcritical ITprimedatacenters.com
Ark Tucson data centerArk Data Centers (Involta)Street address not publishedTucson, AZ (Pima)Retail colocation38,000 sq ft20,000 sq ft of colocation space2.1 MWcapacity (stated as 2,072 kW)involta.com
TECfusions TucsonTECfusionsStreet address not publishedTucson, AZ (Pima)WholesaleNot published15 MWIT capacitytecfusions.com

Figures are as each operator publishes them, checked November 14, 2026. A blank means the operator does not publish that figure, and power is critical IT load unless the line under it says otherwise. The list shows what each building is, not what space is open: availability changes month to month, and we check it per requirement. Campuses that hyperscalers built for their own use are not listed.

Download the list (CSV)
Need more than the download?

The public file is free to use under CC BY 4.0. For a custom cut by market, operator or date, scheduled updates, email us what you are working on. If it is a site, a deal or a lease, the same research backs our data center consulting.

Request Custom Data

Need space in one of these buildings, or power on a set date? Send us the requirement and you'll hear back within 24 hours with the buildings that fit. For a megawatt or more, see wholesale colocation; for GPU racks, AI and GPU colocation.

Price My Phoenix Requirement

Phoenix Colocation Pricing

CBRE put Phoenix's average asking rent at about $190 per kW per month in early 2025, after several years of fast increases, with vacancy at 1.7 percent. CBRE noted that pricing held steady year over year after rapid gains in earlier years. That places Phoenix in the same range as Chicago and Northern Virginia rather than among the discount markets.

What drives the price

Size, density and building. The downtown carrier hotel prices for its connectivity; East Phoenix and Chandler campuses usually offer more space and power per dollar.

What the rate leaves out

Cross-connects, remote hands, setup fees and power above the commitment. Compare five-year totals, not rates. See the colocation pricing guide.

How to get the market price

Put the same requirement in front of every qualifying operator at once. See the data center lease guide for the terms that matter.

Power in Phoenix: APS and SRP

Two utilities serve the Phoenix metro, and both are the constraint on new data centers. Arizona Public Service has acknowledged turning away new data center customers: it serves about 350 MW of data center load today against peak system capacity of about 8,200 MW, and pending data center requests would add up to roughly 19,000 MW. Salt River Project, the other main utility, is processing its first cluster study of 25 data center applicants. For a colocation buyer, the takeaway is simple: capacity in buildings that already have power is worth securing now, because new supply will arrive more slowly than demand.

AI and GPU Capacity in Phoenix

Phoenix's newer campuses in Mesa, Chandler and the West Valley were built for high density, and several operators market liquid-cooling-ready halls. The heat makes efficient cooling design more important here than in most markets, and power is the gating factor for anything large. The first questions are which hall can deliver your density, whether liquid cooling reaches the rack, and on what date.

Owning your GPU servers

Air-cooled GPU servers at 35 to 70 kW per rack fit a wider set of Phoenix halls; rack-scale liquid-cooled systems need a facility built for them. See AI and GPU colocation.

Renting GPUs instead

GPU rental is not tied to a location, so the right provider may be anywhere. See GPU rental.

Multi-megawatt and neocloud capacity

Large requirements usually mean a prelease on a building under construction. See wholesale colocation.

Data Centers in Arizona: Beyond Phoenix

Arizona had about 98 operating data centers and another 86 planned or under construction in early 2026, a pipeline behind only Virginia, Texas, Illinois and Georgia. The Phoenix metro holds most of them, as covered above. Outside it, the new proposals are larger, farther out, and more contested.

AreaWhat is thereStatus
Pinal County: Eloy and Casa GrandeLarge proposed campuses between Phoenix and Tucson, including projects near Eloy and Casa GrandeContested. The county board voted 4-1 in August 2026 against rezoning for the largest, the La Osa campus near Eloy
Tucson and Pima CountyProject Blue in unincorporated Pima County, a proposed campus at Davis-Monthan Air Force Base, and a proposal in MaranaProject Blue is under construction amid local opposition; Tucson adopted half-mile residential setbacks for large data centers in August 2026
West Valley and the East ValleyGoodyear, Avondale, Buckeye, Mesa and Chandler, part of the Phoenix metroWhere most operating capacity and near-term supply sits

Sources: Pew Research Center figures as reported by Axios Phoenix; DC Map Arizona; Server Country Arizona policy tracker. As of October 2026.

For tenants, Phoenix is still the market

The outlying proposals are hyperscale campuses, most years from delivery and several in dispute. Colocation and wholesale space for a mid-market requirement is in the Phoenix metro.

Air cooling and water

Arizona's water debate has pushed new proposals, including Project Blue, toward air-cooled designs. Ask any operator how a hall is cooled and what water it depends on.

Recovery from Arizona

Phoenix's low natural-disaster risk makes it a common recovery site for California. See disaster recovery colocation.

Building a Data Center in Arizona: Power and Tax

For developers, landowners and investors, two things decide what an Arizona site is worth.

Power comes first

With APS turning away new data center customers and SRP studying its first cluster of 25 applicants, a site's value rests on a written utility commitment with a date. Development is moving to wherever power can be delivered, including outlying parts of the metro. See powered land.

The tax exemption is under review

Arizona's Computer Data Center Program has offered transaction privilege and use tax exemptions on qualifying equipment, including for qualifying colocation tenants. Governor Katie Hobbs called for its repeal in her January 2026 State of the State address, and the Legislature is weighing a sunset. Confirm the status before counting on it.

What it means for value

Land assembled for data centers without a power commitment trades closer to industrial land. Land with a dated utility commitment trades at a large premium. See data center valuation.

Source: RadiusDC Phoenix market overview, 2026.

Building, buying or investing in Phoenix?
Site and power feasibility, market studies and acquisition due diligence for developers and investors in this market, in writing at a fixed fee agreed before work starts. See data center consulting and data center developers.
Scope a Market Study

Phoenix vs Other Markets

MarketHow it compares with Phoenix
Los Angeles and Silicon ValleyPhoenix is the usual inland alternative and recovery site for California primaries: far lower earthquake exposure, a different grid, and often more space. See Los Angeles and San Francisco Bay Area colocation
Dallas-Fort WorthA larger central market with more available capacity; a common second option when Phoenix power is not available in time. See Dallas colocation
Chicago and Northern VirginiaSimilar pricing and similarly tight vacancy, with deeper cloud and network ecosystems. See Chicago and Northern Virginia
OhioA lower-cost central market with fast-growing capacity around Columbus. See Ohio data centers

How We Find Colocation Space in Phoenix

1

You send the requirement

Cabinets or kilowatts, density, submarket, connectivity, compliance and the date. One email or one call.

2

We find what is actually available

Across Digital Realty, Csquare, DataBank, Flexential, RadiusDC and the other Phoenix operators that fit, including space that is not advertised.

3

We compare five-year totals

Rate, escalator, cross-connects, setup and remote hands, side by side, benchmarked against what comparable deployments pay.

4

We negotiate before you sign

Expansion rights, renewal caps and the terms that move the most money, while they are still negotiable. The operator you choose pays us. How a data center broker works.

Frequently Asked Questions

How much does Phoenix colocation cost?

CBRE put Phoenix's average asking rent at about $190 per kW per month in early 2025, with pricing steady after rapid gains in earlier years. Cross-connects, remote hands and setup fees add to the total.

Is there a list of data centers in Phoenix?

Yes. The building list on this page covers 35 colocation and wholesale buildings in the Phoenix metro from 17 operators, plus 2 in Tucson, each with its address, type, size and power as the operator publishes them, and a source. It is free to download as a CSV.

Which companies operate data centers in Phoenix?

The colocation and wholesale operators include Digital Realty, Iron Mountain, Aligned, QTS, Prime, NTT, Centersquare, CyrusOne, Stream, Vantage, Compass, EdgeCore, Novva, EdgeConneX, H5, Flexential and Lincoln Property Company, alongside the hyperscalers' own campuses. Which one fits depends on size, power date and connectivity, and that is what we check for you.

Who are the main Phoenix data center providers?

Digital Realty, Iron Mountain, QTS, CyrusOne, EdgeCore, Csquare, DataBank, Flexential, RadiusDC (formerly phoenixNAP), Centersquare, Compass and Aligned, among others, from the downtown carrier hotel to wholesale campuses in Chandler, Mesa and the West Valley.

How big is the Phoenix data center market?

Maricopa County hosts about 2,381 MW of operating data center capacity, with roughly 2,978 MW more planned or under construction, one of the largest pipelines in the country.

Is there colocation space available in Phoenix?

Some, but it is tight. Phoenix absorbed 442 MW in the first half of 2026 with 1.7 GW under construction, according to JLL. CBRE put Phoenix vacancy at 1.7 percent in early 2025, and new power is scarce, so existing space at the right density moves quickly. Cabinets and small suites are easier to find than large blocks.

Where is Iron Mountain Phoenix?

On a 39-acre campus about ten minutes east of downtown Phoenix, at 615 North 48th Street (AZP-1) and 4802 East Van Buren Street (AZP-2), with AZP-3 in development. AZP-1 and AZP-2 deliver about 89 MW combined. Csquare and DataBank, both on the same campus, are among our channel partners, so we can find what is available and negotiate the price and terms at no cost to you.

What is Digital Realty Phoenix?

Digital Realty's PHX10 at 120 East Van Buren Street is Phoenix's leading carrier hotel, with 36-plus carriers and an internet exchange. Digital Realty also operates data centers in Chandler. Digital Realty is one of our channel partners, so we can find what is available alongside other Phoenix options and negotiate the price and terms at no cost to you.

What is QTS Phoenix?

QTS operates the Phoenix 2 campus on North 40th Street, near the Iron Mountain campus, and further Phoenix campuses for hyperscale and wholesale customers. Send us the requirement first and we compare it with the Phoenix operators we place with.

What is CyrusOne Chandler?

CyrusOne's Chandler campus, southeast of Phoenix, includes seven data centers, PHX1 through PHX7, serving large enterprise, wholesale and hyperscale customers. Send us the requirement first and we compare it with the Phoenix operators we place with.

What is EdgeCore Mesa?

EdgeCore's Mesa campus, at 3856 South Everton Terrace in the Elliot Road Technology Corridor, is planned at 1.2 million square feet and 225 MW for hyperscale and wholesale tenants. Send us the requirement first and we compare it with the Phoenix operators we place with.

Which Phoenix data centers are on the Iron Mountain campus?

Iron Mountain's own AZP-1 and AZP-2, plus Csquare PHX1 and DataBank PHX2, both at 615 North 48th Street, so one campus offers several operators to compare.

Where are Arizona data centers located?

The Phoenix metro dominates: downtown Phoenix, East Phoenix near Sky Harbor, Chandler and Tempe, Mesa, and the West Valley around Goodyear, Avondale and Glendale. Tucson and outlying counties are growing as developers follow available power.

Where are the Mesa, Tempe, Goodyear and Avondale data centers?

Mesa data centers sit in the East Valley, led by EdgeCore's campus in the Elliot Road Technology Corridor and Centersquare on West University Drive. For a Tempe data center location, the nearest cluster is East Phoenix, including the former phoenixNAP data center on East University Drive, now operated by RadiusDC. Goodyear data center and Avondale data center campuses in the West Valley host wholesale and hyperscale capacity, including Compass. Chandler, to the southeast, is home to CyrusOne's campus and Digital Realty's Chandler data centers.

Is there Arizona colocation outside Phoenix?

Some. Tucson has a smaller colocation market, and developers are moving to outlying counties where power can be delivered. For most buyers, Arizona colocation means the Phoenix metro, where the carrier hotels, operators and network routes are concentrated.

Why is new data center power hard to get in Phoenix?

Demand far exceeds what the utilities can deliver. APS serves about 350 MW of data center load today against about 8,200 MW of peak system capacity, and pending data center requests would add up to roughly 19,000 MW. APS has acknowledged turning away new data center customers.

Does Arizona have a data center tax exemption?

Arizona's Computer Data Center Program has offered transaction privilege and use tax exemptions on qualifying equipment, including for qualifying colocation tenants. Governor Hobbs called for its repeal in January 2026 and the Legislature is weighing a sunset, so confirm the current status.

Is Phoenix a good disaster recovery site for California?

Often, yes. Phoenix sits on a different grid with far lower earthquake exposure than Los Angeles or the Bay Area, close enough for practical latency, which is why many California companies place recovery capacity there.

Can Phoenix data centers host AI and GPU hardware?

Yes, in the right halls. Newer campuses in Mesa, Chandler and the West Valley were built for high density, and some offer liquid cooling. Power availability is the limit, so start with which hall can deliver your density on your date.

Do you place colocation in Phoenix?

Yes, across the Phoenix operators that fit your requirement, including Digital Realty, Csquare, DataBank, Flexential and RadiusDC through formal channel partnerships. Send the requirement and you'll hear back within 24 hours. The operator you choose pays us, so it costs you nothing.

How many data centers are in Arizona?

About 98 operating data centers and 86 planned or under construction as of early 2026, according to Pew Research Center, a pipeline behind only Virginia, Texas, Illinois and Georgia. Most are in the Phoenix metro; the newest large proposals are in Pinal County and around Tucson, several of them contested.

Price Your Phoenix Requirement

Send what you need: cabinets or kilowatts, density, submarket, connectivity and the date. You'll hear back within 24 hours. We find the Phoenix facilities that fit, benchmark them against what comparable deployments pay, and negotiate the contract before you sign. If Phoenix is not the right market, we say so and price the one that is.

Send it before you call an operator.
Once you have contacted an operator directly, it usually will not work through an advisor on your deal. The operator you choose pays us, so it costs you nothing.
Price My Phoenix Requirement