B200 and B300 Rental
What NVIDIA Blackwell GPUs Cost to Rent in 2026, On Demand and Reserved, and How to Get Allocation

B200s rent for a median $6.49 an hour and B300s about $7.99, but fewer than one listing in five is confirmed in stock. We find who can actually deliver and negotiate the terms.

Get B200 and B300 Quotes Through Us
Single servers on monthly terms welcome Availability verified, not assumed Paid by the provider, never by you

B200 and B300 rental is where the AI hardware market is moving in 2026. The NVIDIA B200 is the first Blackwell data center GPU, with 180 GB of memory and roughly two and a half to three times the training throughput of an H100; the B300, its Blackwell Ultra refresh, raises memory to 288 GB and rents for about a dollar an hour more. In September 2026 the B200 rents for a median of $6.49 per GPU-hour on demand and the B300 for about $7.99, according to GetDeploying, with specialist clouds at $6 to $7 and the hyperscalers at $14 to $16 for the same silicon. Multi-year reserved commitments have been quoted as low as $2.25 per B200-hour. The catch is supply: only 16 percent of B200 listings and 11 percent of B300 listings are confirmed in stock, per AIMultiple, so a rate card is not an offer until the provider can name a delivery date.

B200 ON DEMAND
$6.49
per GPU-hour median across 21 providers, up 16 percent in a year (GetDeploying, Sept 28, 2026)
B300 ON DEMAND
$7.99
per GPU-hour median, flat over 90 days (GetDeploying); reserved median $5.71 (AIMultiple)
CONFIRMED IN STOCK
16% / 11%
of B200 and B300 listings with verified availability (AIMultiple)
MULTI-YEAR RESERVED
From $2.25
per B200-hour on 36-month terms; B300 from $3.13 on 48 months (IntuitionLabs, Tech Insider)
What a B200 costs per hour, depending on where and how you rent it
US dollars per GPU-hour, September 2026
Hyperscalers, on demandAWS P6, Google Cloud A4
$14 to $16
Tracker median, all providers21 providers with priced on-demand configs
$6.49
Specialist GPU clouds, on demandthe benchmark to negotiate against
$5.99 to $6.82
Spot and cheapest verifiedinterruptible, or small providers
$3.75 to $4.40
36-month reservedlowest quoted committed rate
From $2.25

Prices checked September 2026. Sources: GetDeploying, Thunder Compute, Spheron, IntuitionLabs. Free to cite with a link to this page.

Send us the requirement before you request quotes.
Once you have asked a provider for Blackwell pricing directly, it will only work with you on its own terms. Send it to us first and you'll hear back within 24 hours from the person who will run your search, with every provider that can actually deliver quoted at once and benchmarked against the figures on this page. The provider you choose pays us, so it costs you nothing.
Get B200 and B300 Quotes Through Us

B200 and B300 Rental Prices in 2026

FigureB200B300Source
On-demand median$6.49 per GPU-hour$7.99 per GPU-hourGetDeploying, B300 page, Sept 28, 2026
Specialist cloud range, on demand$5.99 to $6.82$7.10 to about $8Thunder Compute, B300 guide, Sept 2026
Hyperscaler on demandAbout $14.24 (AWS) to $16.11 (Google Cloud)Up to about $17.80Thunder Compute, IntuitionLabs
Cheapest verified in stock$3.75About $7.10GetDeploying, Thunder Compute
SpotAbout $4.40; rose 48 percent between February and April 2026From about $4 per hour on the cheapest listingsSpheron, ColoPrice, GetDeploying
Reserved36-month commitments quoted as low as $2.25Median $5.71; 48-month commitments as low as $3.13IntuitionLabs, AIMultiple, Tech Insider
One GPU, one month, on demandAbout $4,700About $5,800MCA calculation at the medians
One eight-GPU server, one monthAbout $38,000About $47,000MCA calculation at the medians
Buying insteadEight-GPU HGX B200 server about $390,000 to $500,000About $50,000 to $60,000 per GPU; eight-GPU HGX B300 about $550,000 to $650,000GPU Smith, Thunder Compute, Tech Insider
WHAT THAT MEANS
Per hour, a B200 costs about twice an H100 ($6.49 against $3.25). Per result on large training runs, it is close to break-even or better, because each B200 does the work of two and a half to three H100s and its FP4 precision roughly doubles inference throughput again. That is why the Blackwell decision is rarely about the rate. It is about whether a provider can deliver on your date, at a specialist-cloud price rather than a hyperscaler one, on a term that will not look expensive when Rubin arrives. H100 pricing is on H100 rental, and every GPU's current rate is on GPU rental prices, updated monthly.

B200 vs B300: Which One Should You Rent?

The B300 is the B200 with more memory and more power on the same eight-GPU HGX footprint. Bandwidth is unchanged, so it helps when the model does not fit, not when the model is slow.

SpecificationB200B300
ArchitectureBlackwell; first HGX systems shipped late 2024Blackwell Ultra; broad availability from mid-2026
Memory180 GB HBM3e (some vendors quote 192 GB)288 GB HBM3e
Memory bandwidthAbout 8 TB/sAbout 8 TB/s, unchanged
GPU powerUp to 1,000 WUp to 1,400 W
Form factorSXM only, eight per HGX B200 server, NVLink at 1.8 TB/s per GPUSXM only, eight per HGX B300 server
Server powerRoughly 14 kW per eight-GPU serverRoughly 16 kW and up per eight-GPU server
Rental premiumBaselineAbout $1 to $1.50 more per GPU-hour at providers listing both

Sources: Thunder Compute, Runpod, Hyperstack. Server power figures are MCA estimates from GPU power ratings plus CPUs, memory, networking and fans.

Rent the B200 when

The model and its working set fit in 180 GB per GPU, or you are training across many GPUs anyway and memory per card is not the limit. It is the better price for most training and for inference on models up to roughly 100 billion parameters at FP4.

Rent the B300 when

A single-GPU or single-node deployment is memory-bound: the extra 108 GB lets one B300 serve a model, or a longer context, that would need two B200s. If the bottleneck is bandwidth rather than memory, the B300 will not help.

Stay on the H200 when

The workload fits in 141 GB and is inference rather than training. At $4.40 an hour the H200 is often the cheapest way to serve a large model. See H200 rental.

Stay on the H100 when

Cost per hour matters more than time to result, and the toolchain is mature. At half the price, the H100 still wins most fine-tuning and sub-80 GB inference. See H100 rental.

B200 vs H100 vs H200: Cost per Result, Not per Hour

GPUOn-demand median, Sept 2026MemoryTraining work per GPU vs H100Rough cost per unit of training
H100$3.2580 GB1x$3.25
H200$4.40141 GBAbout 1.1 to 1.4x on training; more on memory-bound inferenceAbout $3.15 to $4.00
B200$6.49180 GBAbout 2.5 to 3xAbout $2.15 to $2.60
B300$7.99288 GBAbout 2.5 to 3x, higher where memory was the constraintAbout $2.65 to $3.20

Cost per unit of training is an MCA calculation: the on-demand median divided by throughput relative to the H100, using the ranges published by ColoPrice and CloudZero. Real throughput depends on the model, precision and fabric.

WHAT THAT MEANS
On large training runs, a B200 at the median is already cheaper per result than an H100, and any reserved discount widens the gap. On inference, the comparison depends on whether the model fits: a workload that fits in 141 GB is usually cheapest on an H200, and one that needs 288 GB on a single card has no alternative but the B300. Cluster-scale deployments of any of these are covered on GPU cluster rental; rack-scale Blackwell (72 GPUs in one liquid-cooled rack) on GB200 and GB300 NVL72 rental.

Getting Allocation: Why Availability Matters More Than the Rate

Fewer than one Blackwell listing in five is confirmed in stock. A published $6 rate at a provider with no capacity is worth less than a $7 rate with servers energized and a delivery date in writing.

Ask for the delivery date in writing

"Available now" should mean a named quantity, a location and a date, with a remedy if the date is missed. "Subject to availability" is a quote, not capacity.

Quote several providers at once

Blackwell allocation is uneven: one specialist cloud has B300s energized while another is still waiting on servers. Only a search across providers finds who can deliver this quarter.

Consider monthly terms on a single server

Eight B200s on a monthly commitment, about $38,000 at the median, is now a standard offer, and it is often the fastest route to Blackwell capacity while a larger reservation is arranged.

Know the neoclouds

The specialist GPU clouds are where Blackwell capacity is cheapest and where allocation moves fastest. Who they are and how they differ is on neocloud providers.

Mind the term

A 36-month B200 reservation at $2.25 is a strong price, but it runs into the Rubin generation. Negotiate an upgrade path or a shorter term with a renewal option.

Verify before you commit

We confirm capacity with the provider before a client signs anything, because the trackers report listings, not servers.

What the Hourly Rate Leaves Out

ItemWhat to check on Blackwell
NetworkingMulti-node training needs 400 Gbps InfiniBand or equivalent per GPU; Blackwell moves enough data that a slow fabric wastes the premium you paid for the chip
StoragePer-GB-month pricing and throughput; faster GPUs need faster storage to stay busy
EgressFree at most specialist clouds, metered at the hyperscalers; checkpoints from Blackwell training runs are large
Billing increments and minimumsPer-second, per-minute or per-hour; minimum GPU counts and minimum runtimes
SoftwareFP4 and the second-generation Transformer Engine need current libraries; confirm the provider's image supports them or you lose the throughput advantage

Rent or Buy a B200 Server?

An eight-GPU HGX B200 server costs about $390,000 to $500,000 to buy. At the on-demand median it rents for about $38,000 a month, so the crossover with buying comes at roughly a year of full use, before hosting. The complication is where to put it: a B200 server draws about 14 kW and a B300 server more, which is beyond most facilities built for 5 to 15 kW racks.

One eight-GPU B200 server over three years
Running around the clock; owning uses a $450,000 server plus colocation for a 14 kW server at about $204 per kW per month
Rent on demand$6.49 per GPU-hour
About $1.36 million
Rent reservedabout 35 percent off on demand
About $890,000
Own and colocateserver plus hosting
About $550,000
Rent, 36-month reserved at $2.25lowest quoted committed rate
About $470,000

MCA calculation from the figures on this page; excludes power consumption, staff, networking and the residual value of the hardware. Free to cite with a link to this page.

Rent when

The project is under two years, demand is uncertain, or you cannot host a 14 kW-plus server. On Blackwell, renting also lets you move to Rubin without owning a depreciating asset.

Own and colocate when

The server will run for three years at high utilization and you can secure a facility for 40 kW-plus air-cooled racks. The AI and GPU colocation guide covers which facilities can, and we place those deployments too.

The long reservation

At the lowest quoted 36-month rates, a reserved B200 server is cheaper than owning one, without the capital or the facility. It is the best price on this page, and the one with the most to negotiate: delivery date, upgrade path and exit.

How We Get You Blackwell Capacity

You tell us the requirement: B200 or B300, GPU count, term, start date, storage and networking. We take it to every specialist GPU cloud and bare metal provider that can deliver Blackwell on your timeline, at the same time, so they compete; we confirm the capacity exists before you commit; we benchmark the quotes against the figures on this page; and we negotiate the rate, the delivery date, the term and the exit before you sign. A single server on a monthly term is welcome. The provider you choose pays us from the channel budget it would otherwise spend on its own sales team, so the service costs you nothing and the rate is not marked up. How it works.

Frequently Asked Questions

How much does it cost to rent a B200?

In September 2026 the median on-demand rate is $6.49 per GPU-hour across 21 providers, according to GetDeploying, with specialist clouds at $5.99 to $6.82 and the hyperscalers at $14 to $16. The cheapest verified in-stock rate is $3.75, spot runs about $4.40, and 36-month reserved commitments have been quoted as low as $2.25. One B200 costs about $4,700 a month at the median; an eight-GPU server about $38,000.

How much does it cost to rent a B300?

About $7.99 per GPU-hour at the median on demand, with specialist clouds from $7.10 and hyperscalers up to about $17.80. The reserved median is $5.71, and 48-month commitments have been quoted as low as $3.13. One B300 costs about $5,800 a month at the median; an eight-GPU server about $47,000.

What is the difference between the B200 and the B300?

The B300 is the Blackwell Ultra refresh of the B200: 288 GB of memory against 180 GB, 1,400 W against 1,000 W, the same 8 TB/s bandwidth, and about a dollar to a dollar and a half more per GPU-hour. It helps when a model or context does not fit on a B200; it does not help when the bottleneck is bandwidth.

Is the B200 worth it over the H100?

For training, usually yes: a B200 costs about twice an H100 per hour but does roughly two and a half to three times the work, so it is cheaper per result at the medians, and reserved discounts widen the gap. For fine-tuning and inference that fits in 80 GB, the H100 at half the hourly price is often still cheaper per job.

Should I rent a B200 or an H200?

For inference on a model that fits in 141 GB, the H200 at $4.40 is usually the cheapest option. For training, or inference that needs FP4 throughput or more than 141 GB, the B200 wins. The B200's FP4 precision roughly doubles inference throughput over FP8, which matters at scale.

Why are B200 prices so different between providers?

The same GPU runs about $6 on specialist GPU clouds and $14 to $16 on the hyperscalers, which bundle networking, storage and their own margins. Spot and small providers go lower still. Supply is the other factor: with only 16 percent of B200 listings confirmed in stock, providers with capacity charge for it.

Can I rent a single B200 server on a monthly term?

Yes. Eight B200s on a monthly commitment is a standard offer from specialist clouds and bare metal providers, at roughly $38,000 a month at the median, and it is often the fastest route to Blackwell capacity. We place single-server monthly deployments as well as reserved clusters.

How much power does a B200 server need?

An eight-GPU HGX B200 server draws roughly 14 kW, and an HGX B300 server 16 kW and up, from 1,000 W and 1,400 W per GPU respectively plus CPUs, memory, networking and fans. That is air-coolable at two or three servers per rack, but beyond what most facilities built for 5 to 15 kW racks can serve.

Is it cheaper to rent or buy a B200 server?

Over three years at full utilization, owning an eight-GPU B200 server and hosting it costs about $550,000, against about $890,000 to rent reserved at typical discounts and $1.36 million on demand. But the lowest quoted 36-month reserved rates come in near $470,000, cheaper than owning, without the capital or the facility.

How hard is it to get B200 or B300 capacity?

Harder than the rate cards suggest. Only 16 percent of B200 and 11 percent of B300 listings are confirmed in stock, according to AIMultiple, and allocation varies by provider and month. Quoting several providers at once, and getting the delivery date in writing, is how deployments actually land.

Will B200 prices fall when Rubin arrives?

Probably, following the pattern of every previous generation, though the timing depends on how fast Rubin ships and how strong demand stays. B200 on-demand rates rose about 16 percent in the year to September 2026 because supply lagged demand. A long reservation signed today should carry an upgrade path or an exit for that reason.

What does it cost to get Blackwell quotes through Metro Colo Advisory?

Nothing. The provider you choose pays us from its channel budget, the same way it pays its own sales team, and the rate is not marked up. If the best answer is a different GPU or the provider you already use, we say so.

Get B200 and B300 Quotes Through Us

Tell us B200 or B300, how many, the term, the start date, and the storage and networking you need. You'll hear back within 24 hours from the person who will run your search, with every provider that can actually deliver quoted at once and benchmarked against the figures on this page. If the better answer is an H200, an H100, or the provider you already use, we say so. No cost, no obligation, and the provider you choose pays us.

Send the requirement before you request quotes.
That is what keeps every provider competing for it, and on Blackwell it is how you find out who can deliver.
Get B200 and B300 Quotes Through Us