Neocloud Providers
The Providers Compared, GPU Pricing Against the Hyperscalers, and Which Neoclouds Are Built to Last

Neoclouds rent the same NVIDIA GPUs as the hyperscalers for about half the price. But with debt and IPO trouble hitting the sector, the provider you sign with now matters as much as the rate. We quote your requirement across the neoclouds that can deliver it, and check each one before you commit or prepay.

Price My GPU Requirement
For AI teams renting GPUs and neoclouds building capacity Every provider checked before you prepay No fee to you

Updated October 26, 2026. Company figures from filings and results releases; prices from public rate cards; contract terms from quotes we have seen this month.

THE SHORT ANSWER
A neocloud is a cloud provider built to rent GPU compute for AI training and inference, rather than the full menu of services a hyperscaler like AWS, Azure or Google Cloud sells. Neocloud revenue passed $25 billion in 2025, and Synergy Research forecasts close to $400 billion by 2031. The largest are CoreWeave, Nebius, Lambda and Crusoe, with Nscale, Fluidstack, Together AI and Vultr behind them. A neocloud usually rents the same NVIDIA GPU for about half the hyperscaler price and often gets new generations first. The catch in 2026 is the providers themselves: several carry heavy debt, depend on one or two customers, or are still waiting on power, so checking the provider is now as important as comparing the rate.
MARKET SIZE
$25B+
neocloud revenue in 2025; near $400B forecast by 2031
B300, ON DEMAND
$9.50 vs $17.80
per GPU-hour at Nebius against AWS, October 2026
B300, RESERVED
$4.50 to $6
per GPU-hour on 24 to 36-month terms, from quotes we have seen
NEW CLUSTER DATES
Early 2027
for new reserved B300 clusters quoted this month
Neocloud vs hyperscaler: on-demand price per GPU-hour
Lowest listed rate at a major neocloud against AWS, October 26, 2026
NeocloudAWS
B300, neocloudNebius, lowest major listing
$9.50
B300, AWShyperscaler
$17.80
B200, neocloudLambda
$6.69
B200, AWShyperscaler
$14.24
H100, neocloudLambda
$3.29
H100, AWShyperscaler
$6.88

Source: GetDeploying’s cloud GPU price tracker and its B300, B200 and H100 pages, October 26, 2026. Listed “from” prices; server configurations differ, and the Lambda H100 rate was listed out of stock. Market size from Synergy Research Group, April 2026. Free to cite with a link to this page.

Renting GPUs? Send the requirement before you contact any provider.
GPU model, count, term and start date, from one server on a monthly term to a reserved cluster. You’ll hear back within 24 hours. We find the neoclouds that can actually deliver it, benchmark their pricing against the market, and check each provider before you sign. There is no fee to you.
Price My GPU Requirement

What Is a Neocloud? Neocloud vs Hyperscaler

A neocloud rents GPUs; a hyperscaler rents everything, GPUs included. Here is what that difference means for a buyer.

NeocloudHyperscaler
GPU priceOften half the hyperscaler rate for the same GPU, and far lower again on reserved termsHigher on-demand rates; discounts mostly through large committed-spend agreements
Newest GPUsOften first with new NVIDIA generations; CoreWeave and Nebius had Vera Rubin systems running in September 2026Broad availability, sometimes later and with quotas
Built forGPU clusters with high-speed interconnect, tuned for training and inferenceEvery workload: databases, storage, networking, managed services, and GPUs among them
TermsNegotiable by server, cluster, term and start date; big clusters now come with long terms and prepaymentMostly standard pricing, with enterprise agreements for large spend
Provider riskVaries widely: some are well funded, others carry heavy debt or depend on one or two customersVery low: the big three are among the best-capitalized companies in the world
Variation between providersWide: availability, cluster size, support and terms differ a lotNarrow: the big three behave similarly
WHAT THAT MEANS
If your workload is mostly GPU compute, a neocloud usually wins on price and access to the newest hardware. If it depends on the rest of a hyperscaler’s services, a hybrid is common: GPUs from a neocloud, everything else where it already runs. Because neoclouds differ so much from each other, and some are under real financial strain, the provider matters as much as the category.

The State of the Neoclouds: Debt, IPOs and Power in October 2026

Demand for neocloud capacity is real: the largest providers hold tens of billions of dollars in contracted backlog, and new GPU clusters are booked well into 2027. But the money behind that build-out has become the story. In mid-October, CoreWeave’s shares fell about 25 percent in a week as its bonds sold off, Nscale met pushback on the valuation for its planned IPO, and Australia’s Firmus withdrew its IPO. Investors are asking whether the debt raised to buy GPUs will be repaid before the next NVIDIA generation cuts what those GPUs can earn.

For a buyer, that changes the question. The neoclouds most likely to deliver on a multi-year contract have power already connected, contracts with creditworthy customers, a spread of customers rather than one or two, and the financing in place for the hardware they are selling you. Here is where the largest providers stand on those measures, from their own filings.

CoreWeave

NASDAQ: CRWV · LIVINGSTON, NJ
STRENGTHS
  • Q2 2026 revenue of $2.58 billion, up 112 percent
  • About $104 billion of contracted backlog
  • 1.5 GW of active power, about 3.7 GW contracted
  • Vera Rubin NVL72 in production since September 30, 2026
WHAT TO WATCH
  • $35.1 billion of debt plus $16.5 billion of lease liabilities at June 30
  • Two customers made up 62 percent of Q2 revenue
  • Shares fell about 25 percent in the week to October 16; its 2032 bonds traded near 79.5 cents, about a 15 percent yield

Nebius

NASDAQ: NBIS
STRENGTHS
  • Q2 2026 revenue of $582 million, up 454 percent; $3.0 billion annualized run rate
  • More than $40 billion of customer commitments, including Microsoft (up to $17.4 billion) and Meta (up to $27 billion)
  • About $8 billion of cash; expects more than $9 billion of customer prepayments in 2026
WHAT TO WATCH
  • Heavy spending: about $5.7 billion of capex in Q2 alone
  • Raised on-demand prices October 1, 2026: B300 from $7.85 to $9.50 an hour

Nscale

IPO FILED SEPTEMBER 18, 2026 · LONDON
STRENGTHS
  • $103.4 billion of active and contracted deals covering about 461,000 GPUs
  • Contracts with Microsoft (up to $43.8 billion) and Anthropic (up to about $44.6 billion)
WHAT TO WATCH
  • First-half 2026 revenue of $140.6 million against a $1.02 billion net loss
  • Its largest customer was 52 percent of first-half revenue; Microsoft and Anthropic are about 85 percent of contracts
  • Said in its filing it had no binding financing yet for the GPUs and data centers those contracts need
  • Microsoft withdrew as anchor of its Essex, UK site, where grid power may not arrive until the 2030s; investors pushed its IPO valuation from about $30 billion toward $16 to $19 billion

Lambda

PRIVATE · SAN FRANCISCO
STRENGTHS
  • Backlog of about $50 billion in September, up from $15 billion in June
  • Raising up to $4 billion at a $14.5 billion pre-money valuation, with an IPO targeted for 2027
  • Multibillion-dollar Microsoft agreement including GB300 NVL72
WHAT TO WATCH
  • Private, so less financial disclosure; its 2026 revenue is reported at about $1.5 billion, an estimate

Crusoe

PRIVATE
STRENGTHS
  • Raised $3.9 billion at a $30.9 billion valuation in September 2026
  • More than $140 billion of contracted value and more than 6 GW contracted
WHAT TO WATCH
  • About 1 GW operational against that 6 GW: most of the capacity still has to be built
  • Revenue and debt are not disclosed

Sources: CoreWeave Q2 2026 results, August 2026; CoreWeave 10-Q for June 30, 2026; TIKR, October 2026; Nebius Q2 2026 shareholder letter, August 2026, and DCD; Nebius price change; Nscale S-1, September 2026; The Next Web, citing Bloomberg; investingLive, citing The Telegraph and Bloomberg; Reuters, citing the WSJ, October 2026; Crusoe Series F, September 2026. Strengths and risks are drawn from each company’s reported figures, not a credit rating.

WHAT THAT MEANS
None of this means a neocloud will fail, and the biggest contracts are with some of the strongest buyers in the world. It means the provider you choose should be checked the way a provider checks you. If you are prepaying 25 percent of a three-year contract, you want to know where that cash goes, whether the power for your cluster is already connected, and what happens if delivery slips.
Before you prepay a neocloud, send it to us first.
We check the provider as hard as it checks you: its funding, its customer concentration, whether the power for your cluster is live, and how your prepayment is protected in the contract. You’ll hear back within 24 hours.
Check My Provider and Price

More Neocloud Providers Compared

Beyond the largest four and Nscale, these are the providers buyers most often compare. Research firm SemiAnalysis groups the market into tiers: the hyperscalers, a handful of neocloud giants, a wide field of emerging neoclouds, and brokers and marketplaces at the spot end. For more on alternatives to the largest provider, see CoreWeave competitors.

ProviderLatestWorth knowing
FluidstackPrivate, New YorkRaised $1.5 billion at an $18 billion valuation, September 2026 (Dealroom)Builds for Anthropic, Meta, Mistral and Poolside, largely on power from former bitcoin miners
Together AIPrivate, San FranciscoRaised $800 million at an $8.3 billion valuation, July 2026 (Dealroom)Inference and training platform; annual bookings passed $1.15 billion in Q2 2026
VultrPrivate, West Palm BeachReported to be seeking at least $1 billion of new funding in 2026Broad cloud with GPUs, including a large AMD GPU cluster in Ohio
FirmusPrivate, AustraliaWithdrew its planned IPO in October 2026 (Forbes Australia)A sign of how cautious public investors have become on neoclouds
Bare metal GPU providersDedicated GPU servers by the monthBest for one to a few servers with full control. See bare metal

Neocloud Pricing in October 2026

Neocloud GPU pricing is quoted per GPU-hour, on demand or on a reserved term. On-demand rates are rising for the newest GPUs: Nebius raised its B300 rate from $7.85 to $9.50 an hour on October 1. Reserved terms are where the large discounts are, but they now come with longer commitments and money up front.

GPUNeocloud, on demandReservedHyperscaler, on demandDetail
B300Nebius $9.50, Crusoe $9.90, Together $9.99; median $9.50About $4.50 to $6 on 24 to 36-month termsOracle $15.00, AWS $17.80B200 and B300 rental
B200Lambda $6.69, Together $8.19, Nebius $8.50, CoreWeave $8.60; median $7.99Quoted per requirementOracle $14.00, AWS $14.24B200 and B300 rental
H200Crusoe $4.29, Nebius $5.40, Together $5.99, CoreWeave $6.30; median $4.78Quoted per requirementAWS $7.91, Azure $13.78H200 rental
H100Lambda $3.29, Crusoe $3.90, Together $3.99, Nebius $4.50; median $3.80Quoted per requirementAWS $6.88, Azure $6.98, Google Cloud $11.07H100 rental

On-demand prices per GPU-hour from GetDeploying’s cloud GPU price tracker and its B300, B200, H200 and H100 pages, October 26, 2026; listed “from” prices, and configurations differ. Reserved B300 range from provider quotes we have seen in October 2026. Updated monthly on the GPU rental hub.

What a reserved neocloud contract looks like now

From the quotes crossing our desk this month for reserved Blackwell clusters:

36 months

Minimum term on new reserved Blackwell clusters, up from 24 a year ago.

25%+ up front

Typical prepayment, credited against the monthly fee.

Early 2027

Ready-for-service dates for new B300 clusters quoted now.

RoCE now, InfiniBand later

Switch shortages add three months or more to InfiniBand builds.

Storage extra

High-performance shared storage is quoted separately, often around $0.04 per GB a month.

How to Choose a Neocloud Provider

1

Confirm the GPUs exist on your date

For new clusters, ask for the ready-for-service date in writing, not a waitlist position. New B300 clusters are quoting early 2027.

2

Match the cluster to the workload

Training needs a non-blocking fabric between servers, InfiniBand or RoCE; inference often does not. Paying for a training fabric you will not use is common.

3

Price the whole bill

Storage, data transfer, support and idle reserved capacity can change the answer. Compare total monthly cost at your expected utilization, not the hourly rate.

4

Read the commitment terms

Check the minimum term, the prepayment, what happens if you need to scale down or move to Rubin, and whether you can leave early.

5

Check the provider, not just the price

Debt, customer concentration, whether the power for your cluster is already connected, and how the provider is funding the GPUs it is promising you. A low rate from a provider that cannot deliver is the most expensive option.

6

Protect any prepayment

Tie prepayments to delivery milestones and get the right to terminate for missed dates. Microsoft’s contract with Nebius works this way, and smaller buyers can ask for the same.

7

Quote several at once

Neocloud rates for the same GPU vary by more than double, and the provider that wins on price is not always the one that can deliver. Comparing several against current benchmarks finds the real market.

We run that search, and the provider check, for you.
One server or a thousand GPUs, on demand or reserved: we take the requirement to the neoclouds that can deliver it, compare the full bill and terms, check each provider’s footing, and negotiate before you sign. There is no fee to you.
Price My GPU Requirement

Who Rents From Neoclouds

AI companies training models

Reserved clusters of H200, B200, B300 or GB300 GPUs on a non-blocking fabric, now usually on 24 to 36-month terms. See GPU cluster rental.

Inference at scale

Serving models in production, where cost per token and reliable capacity matter more than interconnect. The H200 and B200 are common choices for their memory.

Enterprises adding AI

Teams that run the rest of their stack on a hyperscaler but rent GPUs from a neocloud for price or availability, often connected privately. See hybrid cloud.

Startups and researchers

One to a few GPUs on demand or by the month, to experiment before committing. See GPU rental.

Building a Neocloud? The Data Center Capacity Behind It

Most neoclouds run on data center capacity they lease rather than own, and power is now the dividing line between the providers that deliver and the ones that wait. Primary-market vacancy is 1.4 percent and just 0.2 percent in Northern Virginia, more than 80 percent of the capacity under construction is already preleased, and many halls marketed for AI cannot support rack-scale liquid-cooled systems on the date you need. Nscale’s Essex site, where grid power may not arrive until the 2030s, shows what happens when a provider signs before its power is secured. Expanding neoclouds need what any large tenant needs: facilities that can actually deliver the density, power and date, compared on terms.

Air-cooled GPU capacity

HGX-class servers at 35 to 70 kW per rack fit a wider set of existing halls, with rear-door heat exchangers or containment at the top of the range.

Liquid-cooled capacity

Rack-scale systems at 120 kW and up, and Vera Rubin racks beyond that, need direct-to-chip cooling delivered to the rack, which far fewer facilities can provide on a near-term date. See NVIDIA Rubin.

Wholesale and build to suit

Multi-megawatt requirements usually mean a prelease or a building developed for you. See wholesale colocation and build to suit.

Vacancy and preleasing from CBRE North America Data Center Trends H1 2026. Build costs per megawatt in our data center cost dataset.

A neocloud or GPU provider that needs megawatts?
Send the requirement: MW, density, cooling, regions and date. You’ll hear back within 24 hours. We take it to the operators across North America and beyond that can deliver it, and check that each power date is real before you sign. The operator you choose pays us.
Find My GPU Capacity

How We Help

We are an independent broker on both sides of the neocloud market. For GPU renters, we take your requirement to the neoclouds that fit, compare the full bill and terms, check each provider’s funding, customers and power, and negotiate before you sign, including how any prepayment is protected. For neoclouds and GPU providers, we find data center capacity through AI and GPU colocation. There is no fee to you either way. How a data center broker works.

Frequently Asked Questions

What is a neocloud?

A cloud provider built specifically to rent GPU compute for AI training and inference, rather than the broad range of services a hyperscaler like AWS, Azure or Google Cloud sells. CoreWeave, Nebius, Lambda and Crusoe are the largest.

What are the main neocloud providers?

The largest are CoreWeave, Nebius, Lambda and Crusoe, followed by Nscale, Fluidstack, Together AI and Vultr, plus bare metal GPU providers that rent dedicated servers by the month.

How big is the neocloud market?

Neocloud revenue passed $25 billion in 2025, according to Synergy Research, which forecasts close to $400 billion by 2031, growth of about 58 percent a year.

Are neoclouds cheaper than AWS or Azure?

Usually, for GPUs. In October 2026 a B300 listed from $9.50 an hour at Nebius against $17.80 at AWS, a B200 from $6.69 at Lambda against $14.24 at AWS, and an H100 from about $3.30 to $4.50 at the main neoclouds against $6.88 at AWS.

Are neoclouds financially stable?

It varies by provider. The largest hold tens of billions of dollars of contracted backlog, but several also carry heavy debt or rely on one or two customers. CoreWeave reported $35.1 billion of debt plus $16.5 billion of lease liabilities at June 30, 2026, and its bonds sold off in October; Nscale said in its IPO filing that it did not yet have binding financing for the GPUs and data centers its contracts need. Check funding, customer concentration and whether the power is connected before committing.

What happens to my contract if a neocloud runs into trouble?

That depends on how the contract is written. Tie any prepayment to delivery milestones, get the right to terminate if dates are missed, and know who holds your data and how you get it out. Large buyers already do this: Microsoft’s contract with Nebius links its prepayments to delivery milestones and lets it terminate if schedules slip.

Why are neoclouds asking for longer terms and prepayment?

Because they are financing the GPUs. Long contracts with creditworthy customers are what lenders lend against, and prepayments fund the hardware directly. Reserved Blackwell clusters quoted in October 2026 typically require 36 months and 25 percent or more up front.

Did neocloud GPU prices go up in 2026?

For the newest GPUs, yes. Nebius raised its on-demand prices on October 1, 2026, including the B300 from $7.85 to $9.50 an hour and the B200 from $7.15 to $8.50. Reserved rates remain far lower, at about $4.50 to $6 for a B300 on a 24 to 36-month term.

What is the difference between a neocloud and a hyperscaler?

A neocloud focuses on GPU compute for AI, with lower prices, earlier access to new GPUs and negotiable terms. A hyperscaler sells every kind of cloud service, with deep integration across them, higher GPU rates and very low provider risk.

How do I choose a neocloud provider?

Confirm the GPUs exist on your date, match the cluster and interconnect to the workload, price the whole bill, read the commitment terms, check the provider’s funding and power, protect any prepayment, and quote several providers at once.

Can I rent a single GPU server from a neocloud?

Yes. Many neoclouds and bare metal providers rent single servers on demand or by the month, and some start at one GPU. Larger clusters are usually reserved on a term.

Is CoreWeave a neocloud?

Yes. CoreWeave is the largest independent neocloud, reporting $2.58 billion of revenue in the second quarter of 2026, up 112 percent, and about $104 billion of contracted backlog.

Where do neoclouds get their data center capacity?

Mostly by leasing it from colocation operators and developers, and increasingly through campuses built for them. Capacity is scarce: CBRE put primary-market vacancy at 1.4 percent in the first half of 2026, with more than 80 percent of the capacity under construction already preleased.

Does using a broker cost more when renting GPUs?

There is no fee to you. We are paid by the provider or within the single all-in rate we negotiate, and we show you that rate against current market pricing so you can see exactly what you are paying. What you gain is the providers that can actually deliver, a check on each one, and negotiated terms.

Price Your GPU Requirement

Send what you need: GPU model, count, term and start date, or for capacity, the megawatts, density and regions. You’ll hear back within 24 hours. We find the providers that can deliver it, benchmark their pricing against current rates, and check each one before you commit.

Send it before you call a provider.
Once you have contacted a provider directly, it usually will not work through an advisor on your deal, and you lose the comparison. There is no fee to you.
Price My GPU Requirement

Renting GPUs: GPU rental, H100 rental, H200 rental, B200 and B300 rental, GB200 and GB300 NVL72 rental, GPU cluster rental, NVIDIA Rubin, CoreWeave competitors and bare metal.
Hosting GPUs: AI and GPU colocation, wholesale colocation, build to suit, cloud repatriation and hybrid cloud.
Markets and more: Dallas, Atlanta, Northern Virginia, Chicago, data center developers, data center cost, the colocation pricing guide and how a data center broker works.