Atlanta Colocation
Atlanta Data Centers, Providers, 2026 Pricing and Where to Deploy in the Southeast's Largest Market
Atlanta is the second-largest US data center market, with the most construction in North America and about 1 percent vacancy. We find the space that fits your requirement.
Price My Atlanta RequirementAtlanta colocation means renting space, power and cooling for your own hardware in one of the roughly 240 data centers across the Atlanta metro, from the downtown carrier hotels at 56 and 55 Marietta Street to the enterprise campuses in the northern suburbs and the hyperscale corridor in Douglasville and Lithia Springs. Atlanta held 1,465 MW of colocation inventory in the first quarter of 2026, the second-largest total in the country, with vacancy at about 1 percent and 2,882 MW under construction, the most of any North American market. The pipeline is not spare capacity: most of it is preleased before it is built, and buildings fill as they are delivered. Nearly all colocation in Georgia sits inside the metro, with the largest new campuses pushing west and south of it. For a mid-market deployment, that means the right block of space in the right submarket has to be found and committed early, which is the work we do.
Prices checked September 2026. Sources: CBRE North America Data Center Trends H1 2026; CBRE Global Data Center Trends 2026 (Q1 2026 inventory and vacancy). Preleasing share is the primary-market figure. Free to cite with a link to this page.
Power, cabinets or megawatts, submarket preference, compliance and dates. You'll hear back within 24 hours from the person who will run your search, with the Atlanta facilities that fit quoted at once and benchmarked against what comparable deployments pay. In a market at 1 percent vacancy, that is how the right block gets committed before someone else takes it. The provider you choose pays us, so it costs you nothing.
The Atlanta Colocation Market in 2026
Scale arrived fast
Atlanta ended 2025 with 1,459 MW of inventory, up 459 MW in a year, and absorbed 456 MW while vacancy fell to 2 percent. By the first quarter of 2026 vacancy was 1 percent, and by mid-year the construction pipeline had passed Northern Virginia's. Hyperscale and AI leasing drive most of it, but it sets the price and availability for everyone.
Power is regulated, not free
Georgia Power serves most of the metro. The Public Service Commission approved rules in January 2025 requiring large loads over 100 MW to pay for upstream grid infrastructure, froze base rates through 2028, and has certified thousands of megawatts of new generation, most arriving after 2030. Developers now need end-user commitments and collateral to secure power, which slows speculative supply.
The tax exemption is under pressure
Georgia exempts qualifying data center equipment from sales and use tax, with investment and job thresholds. Bills introduced in 2026 would end new exemption certificates as early as December 31, 2026. For a deployment that relies on it, confirm the current status before you sign.
Local approval is now a constraint
Council chambers in Marietta filled with opponents in June 2026, and new projects across the metro face closer zoning scrutiny. That affects the pipeline, not existing buildings, but it is another reason committed capacity is worth more than announced capacity.
Atlanta Data Center Submarkets
Atlanta is six submarkets with different economics. Choosing the submarket comes before choosing the building.
| Submarket | Key facilities | Best for |
|---|---|---|
| Downtown carrier hotelsMarietta Street, Peachtree, Williams Street | 56 Marietta Street (Digital Realty's carrier hotel, with Equinix AT2 and AT3 inside), 55 Marietta Street (CoreSite AT1), Equinix AT1 at 180 Peachtree, 250 Williams Street (Digital Realty and Evocative) | Carrier density, peering, cloud on-ramps and network-heavy workloads; the most interconnected buildings in the Southeast |
| West End and southwest Atlantainside the Perimeter | DataBank's West End campus (ATL2 and ATL3, about 100,000 sq ft and 10 MW with 18 carriers) and ATL4 on Selig Drive | Enterprise and compliance-heavy deployments close to downtown at campus economics, with growing density |
| Northwest: Cumberland and MariettaI-75 corridor | Equinix AT4 at 450 Interstate North Parkway, CoreSite AT2 in Marietta | Enterprise deployments near the northwest business district, compliance-focused standalone facilities |
| Northeast corridorNorcross, Alpharetta, Suwanee | Flexential Norcross (with a 4.5 MW second building planned) and Alpharetta, QTS Suwanee | Corporate campuses in the northern suburbs, mid-market enterprise, larger wholesale at Suwanee |
| Douglasville and Lithia Springs20 to 25 miles west | Switch's campus, Flexential Douglasville, hyperscale campuses | Multi-megawatt and hyperscale deployments; land, power and permitting move faster than in the core |
| South metroFayetteville, Union City, East Point | QTS Fayetteville campus (multiple buildings), large owner-occupied hyperscale sites | Wholesale and hyperscale; the direction most new construction is heading |
Facility locations from operator sites and public data center directories, September 2026. Atlanta also hosts Centersquare, DC BLOX, Serverfarm, Hivelocity and others; the Microsoft Fairwater 2 campus, at about 300 MW, is the metro's largest single site but owner-occupied.
Atlanta Colocation Providers
The operators a mid-market search compares in Atlanta, grouped by what each is built for. We hold channel partner relationships across the major operators and are paid comparably by each, so the recommendation follows the requirement.
| Operator | Atlanta facilities | Built for |
|---|---|---|
| Digital Realty | 56 Marietta Street, the Southeast's largest interconnection facility and home of the region's largest peering exchange; 250 Williams Street | Carrier and cloud connectivity, peering, network-heavy and multi-site deployments |
| Equinix | AT1 at 180 Peachtree, AT2 and AT3 at 56 Marietta, AT4 at Interstate North Parkway | The interconnection ecosystem, cloud on-ramps, financial and payment workloads that need the Equinix fabric |
| CoreSite | AT1 at 55 Marietta Street downtown; AT2 in Marietta | Hybrid cloud through the Open Cloud Exchange, compliance-focused standalone space at AT2 |
| DataBank | ATL2 and ATL3 on the West End campus; ATL4 on Selig Drive | Enterprise and compliance-heavy deployments (healthcare, payments, public sector) at campus economics, with high density available |
| Flexential | Norcross, Alpharetta and Douglasville, with a second Norcross building planned | Mid-market enterprise in the northern suburbs and value wholesale in Douglasville |
| QTS | Atlanta-Metro campus, Suwanee, Fayetteville | Large wholesale and hyperscale deployments; retail below a few hundred kW is not its model |
| Switch | Douglasville campus | Large, high-density deployments on a campus model |
| Regional and specialist operators | Centersquare, DC BLOX, Serverfarm, Evocative at 250 Williams, Hivelocity | Mid-market deployments, edge and Southeast regional footprints, bare metal |
Operator facility lists from company sites and public directories, September 2026. For every operator side by side, see the provider comparison.
What Atlanta Colocation Costs in 2026
Atlanta has not been a discount market since vacancy fell to 1 percent, but it still prices below the most expensive markets. CBRE's first-quarter 2026 figures put the highest rates for a 250 to 500 kW requirement in Chicago ($200 to $230 per kW per month) and Northern Virginia ($190 to $235), with the primary-market average at about $204 after this year's increase. Atlanta rates for that size typically sit at or below the average, depending on submarket and density, and large requirements are priced against a pipeline that is mostly spoken for.
| Deployment | What decides the Atlanta price | Where the value usually is |
|---|---|---|
| A few cabinets | Building (downtown carrier hotel versus campus), density, cross-connects and term | Campus and suburban facilities; a downtown address costs a premium worth paying only for the connectivity |
| 50 to 500 kW | Contiguous space at your density, ramp and escalator, and whether several operators are quoting | West End, the northwest and northeast corridors; the competitive process decides more than the submarket |
| 1 MW and up | Whether capacity exists on your date at all; most of the pipeline is preleased | Douglasville, the south metro and the northeast wholesale campuses; delivery obligations matter as much as rate |
| Dense and AI | Which halls can power and cool 40 kW-plus racks, and when | Newer campus halls; the carrier hotels are built for connectivity, not density |
Site and power feasibility, market studies and acquisition due diligence for developers and investors in this market, in writing at a fixed fee agreed before work starts. See data center consulting, powered land and data center valuation.
Who Atlanta Suits
Payments and fintech
Atlanta's payment industry concentration, with Global Payments and NCR Voyix headquartered in the metro, is why it is called Transaction Alley. Payment workloads need PCI DSS documentation and low-latency connectivity to processors and networks, which points to the downtown interconnection buildings. See fintech colocation.
Southeast enterprise
Home Depot, UPS, Delta, Coca-Cola and a large corporate base in the northern suburbs drive steady enterprise demand for SOC 2 facilities with cloud on-ramps and a DR pairing. The northeast and northwest corridors and the West End campus are the usual shortlist.
Healthcare
Emory, Piedmont, Wellstar, Grady, Children's and Northside anchor a large healthcare market that needs HIPAA business associate agreements at every facility in the chain. See healthcare and HIPAA colocation.
Disaster recovery for the Gulf and Florida
Atlanta is inland, on a different grid and weather system from the Gulf Coast and Florida, and within replication latency of both. Health systems and enterprises from New Orleans to Miami use it as the out-of-hurricane-path second site. See disaster recovery colocation.
Media
The broadcast base built around Turner and Cox, plus the region's largest peering exchange at 56 Marietta, make Atlanta a strong site for bandwidth-heavy media workloads. See media and entertainment colocation.
AI and high density
The new campus halls in Douglasville, the south metro and the northeast are built for 40 kW-plus and liquid cooling. For owned GPU hardware, see AI and GPU colocation; for rented capacity, GPU rental.
Atlanta vs Northern Virginia vs Dallas
| Atlanta | Northern Virginia | Dallas-Fort Worth | |
|---|---|---|---|
| Inventory | 1,465 MW (Q1 2026), second-largest US market | 4,497 MW (H1 2026), the largest | 1,249 MW (Q1 2026) |
| Vacancy | About 1 percent | 0.2 percent | About 2.8 percent |
| Under construction | 2,882 MW, the most in North America | 2,420 MW, slowed by land and permitting | 717 MW, 88 percent preleased |
| Rates, 250 to 500 kW | At or below the $204 primary average | $190 to $235 | Below the primary average |
| Interconnection | Strong for the Southeast, centered on 56 Marietta | The deepest in the world | The Infomart and 2323 Bryan carrier hotels |
| Power outlook | Regulated growth; large loads pay for grid upgrades; new generation mostly after 2030 | Constrained; interconnection queues of years | ERCOT, with Senate Bill 6 rules for large loads |
| Best for | Southeast enterprise, payments, DR for the Gulf and Florida, growth capacity | Cloud adjacency, federal, the largest ecosystems | Central US coverage, cost, DR pairing with Atlanta |
Sources: CBRE North America Data Center Trends H1 2026 and Global Data Center Trends 2026; Dallas figures from the CBRE Q1 and H1 2026 market data on our Dallas colocation page. See also Washington DC colocation.
Data Centers in Georgia: Beyond the Atlanta Metro
Searches for data centers in Georgia mostly lead back to Atlanta, where nearly all of the state's colocation sits. The hyperscale build-out is happening in the counties around it. Georgia had about 39 operating data centers with roughly 2.5 GW of capacity in mid-2026, and about 128 planned projects that would add nearly 12 GW, most of them on large campuses west and south of the city.
| Area | What is there | What it means for tenants |
|---|---|---|
| West: Douglas County | Google's first Georgia data center, Microsoft in Douglasville, Amazon Web Services, Aligned and Flexential's Douglasville campus | The established hyperscale cluster, a short drive from downtown |
| South: Fayette, south Fulton, Coweta and Butts | QTS's 615-acre Fayetteville campus, Microsoft in East Point and Palmetto, T5 in Coweta, and AWS in Butts County | Where most new large-scale capacity is landing |
| East: Newton County | Meta's Stanton Springs campus | Hyperscale only, with no retail colocation |
| Farther out | Planned projects in Troup, Muscogee (Columbus), Spalding, Twiggs and other counties | Mostly hyperscale pipeline, years from delivery |
Sources: Cleanview Georgia data center tracker, July 2026; DCD on AWS's $11 billion Georgia plan.
AWS: $11 billion
Amazon Web Services announced about $11 billion for data center campuses in Butts and Douglas counties in January 2025, part of more than $18 billion it has invested in Georgia since 2010.
Most of the pipeline is preleased
The campuses rising in Fayette, Douglas and Butts are built for hyperscalers. For a cabinet-to-megawatt requirement, the market is still metro Atlanta's colocation buildings.
Power and tax rules are tightening
Large loads now pay for upstream grid upgrades and the sales tax exemption is under pressure, both covered above. New supply is arriving more slowly as a result.
How to Find Colocation in Atlanta
Choose the submarket before the building
Connectivity-driven workloads start downtown; enterprise deployments start with the West End campus and the northern corridors; anything over a megawatt starts west and south. Your office location is the weakest reason to pick any of them.
Send the requirement before contacting any operator
Once an operator has it directly, it usually will not work through an advisor. Sent through us, it goes to the facilities that fit, and we negotiate the terms for you.
Ask for capacity with a date, not a listing
At 1 percent vacancy, the useful question is what exists on your date at your density. Most of what is advertised as coming is already committed.
Compare five-year totals
Escalator, cross-connects, setup, remote hands and power above the commitment decide the bill. A lower rate in the wrong building is the more expensive contract.
Settle the DR pairing at the same time
Atlanta pairs naturally with Dallas or Northern Virginia for out-of-region recovery, and with the Gulf and Florida as their recovery site. Two placements negotiated together usually beat two negotiated a year apart.
Read the contract against the quote
Delivery obligations, expansion rights, renewal terms and the tax exemption's status if you are counting on it. We review it before you sign.
Frequently Asked Questions
How much does colocation cost in Atlanta?
For a 250 to 500 kW requirement, Atlanta rates typically sit at or below the primary-market average of about $204 per kW per month in 2026, below Chicago and Northern Virginia. Smaller cabinet deployments are priced per cabinet and vary most by building; downtown carrier hotels carry a premium for connectivity. Large requirements are priced against a pipeline that is mostly preleased. Your rate depends on submarket, density, term and how many operators are quoting.
What is the best data center in Atlanta?
There is no single best facility; it depends on the workload. For carrier density and peering, the downtown buildings at 56 and 55 Marietta Street lead. For enterprise and compliance-heavy deployments at campus economics, the West End campus and the northern corridors are the usual shortlist. For multi-megawatt and high-density deployments, the Douglasville and south metro campuses. We shortlist by requirement, not by name.
Is Atlanta a big data center market?
Yes. Atlanta held 1,465 MW of colocation inventory in the first quarter of 2026, the second-largest total in the United States after Northern Virginia, and had 2,882 MW under construction by mid-2026, the most of any North American market. About 240 data centers from roughly 72 operators serve the metro.
Which Atlanta data centers are Uptime Institute Tier certified?
Uptime Institute publishes a registry of certified facilities, and most colocation buildings in Atlanta, as elsewhere, describe themselves as Tier III-equivalent or concurrently maintainable without holding a certificate. Ask any operator for the certificate itself if certification matters to your compliance program, and check the registry. Our data center tiers guide explains what the classifications actually cover.
What is 56 Marietta Street?
Atlanta's main carrier hotel: a 160,000 square foot downtown building operated by Digital Realty that houses the Southeast's largest concentration of carriers and the region's largest peering exchange, with Equinix AT2 and AT3 inside it. 55 Marietta Street next door houses CoreSite AT1. For network-heavy workloads the two buildings are usually the starting point.
Which Atlanta submarket should I choose?
Downtown for connectivity and peering; the West End campus and the northwest and northeast corridors for enterprise and compliance deployments; Douglasville, Lithia Springs and the south metro for multi-megawatt and high-density requirements. Choose by what the infrastructure connects to and how much power it needs, not by where your office is.
Does Georgia offer a sales tax exemption for data centers?
Georgia exempts qualifying high-technology data center equipment from state and local sales and use tax for certified projects meeting investment and job thresholds. Bills introduced in the 2026 session would end new exemption certificates as early as December 31, 2026. Confirm the current status before a deployment relies on it.
Is power a problem in Atlanta?
Not for existing buildings, but for new supply. Georgia Power serves most of the metro; the Public Service Commission requires large loads over 100 MW to pay for upstream grid upgrades, has frozen base rates through 2028, and has certified new generation that mostly arrives after 2030. Developers need end-user commitments and collateral to secure power, which slows speculative construction and keeps committed capacity scarce.
Is Atlanta or Dallas better for colocation?
They serve different needs and pair well as primary and recovery sites. Atlanta is larger, tighter and stronger for the Southeast, payments and Gulf Coast disaster recovery. Dallas is cheaper on average, sits on ERCOT with more available capacity, and covers the central US. Many companies use both.
Is Atlanta a good disaster recovery site?
Yes, especially for the Gulf Coast and Florida. It is inland and on a different grid and weather system from the hurricane coast, within replication latency, and carries the compliance documentation health systems and financial firms need. For an Atlanta primary site, Dallas or Northern Virginia are the common out-of-region pairings.
Can I get high-density or AI colocation in Atlanta?
Yes. The newer campus halls in Douglasville, the south metro and the northeast corridor are built for 40 kW-plus racks and liquid cooling, and the West End campus offers high density inside the Perimeter. The downtown carrier hotels are built for connectivity rather than density.
Do you place colocation in Atlanta?
Yes, across the operators above, through formal channel partnerships. Send the requirement and you'll hear back within 24 hours. We find the facilities that fit, benchmark the pricing, and negotiate the contract before you sign. The provider you choose pays us, so it costs you nothing.
How many data centers are in Georgia?
About 39 operating data centers with roughly 2.5 GW of capacity, and about 128 planned projects that would add nearly 12 GW, by a July 2026 count. Nearly all colocation is in metro Atlanta; the largest new campuses are in Douglas, Fayette, Butts, Coweta and Newton counties, built mostly for hyperscalers.
Price Your Atlanta Requirement
Tell us what is moving or growing: power, cabinets or megawatts, density, compliance, submarket preference if you have one, and the date. You'll hear back within 24 hours from the person who will run your search. We find the Atlanta facilities that fit, benchmark them against what comparable deployments pay, and negotiate the contract before you sign. If Atlanta is not the right market, we say so and price the one that is. No cost, no obligation, and the provider you choose pays us.
Once you have contacted an operator directly, it usually will not work through an advisor on your deal.
Other markets: Dallas, Washington DC and Northern Virginia, Houston, Chicago, New York, Los Angeles and San Francisco.
Guides: the provider comparison, the colocation pricing guide, data center cost, data center tiers, site selection, compliance colocation and Equinix alternatives.
Moving and recovery: data center migration, disaster recovery colocation, hybrid cloud and cloud repatriation.
Building in Georgia: data center consulting, powered land, build to suit, wholesale colocation and how a data center broker works.
Also see: DataBank data centers, Phoenix colocation, Denver colocation and Miami colocation.