Texas Data Centers
Dallas-Fort Worth, Houston, Austin and San Antonio, the AI Campuses in West Texas, and What the 2026 Pause and the Election Mean for Your Timeline
Texas is building more data center capacity than any other state. In 2026 it paused new large-load approvals and state permits for data center projects, and the governor-elect has called for a moratorium until lawmakers act. We find Texas space that has power on your date, in an existing building or a new one, at no cost to you.
Price My Texas RequirementTexas data centers span four established colocation markets, Dallas-Fort Worth, Houston, Austin and San Antonio, plus a wave of AI campuses in West Texas and the Panhandle, including the Stargate site in Abilene. Texas leads the country in capacity under construction, about 26 GW by JLL’s mid-2026 count. The constraint is now power and politics. ERCOT’s large-load queue reached roughly 474 GW, and in 2026 the state paused new data center interconnection approvals (August 3) and then state permits for data center projects (September 21) while it audits power and water use. On November 3, voters elected Gina Hinojosa governor, who has called for a moratorium on new data center construction until the Legislature passes new protections. Space in existing, energized buildings is unaffected; new projects face a slower and less certain path.
Searches for data centers in Texas usually mean one of two things: colocation space for a company that needs cabinets, cages or a few megawatts, or the AI build-out that has made the state the center of new construction. This page covers both: the Texas markets and what each is good for, the AI data centers in Texas and their status, the 2026 pause and the election, how ERCOT and the 2025 law known as SB 6 shape power, and how to get space. Market detail is on Dallas colocation, Houston colocation and Austin and San Antonio data centers.
Sources: JLL via the Houston Business Journal (August 2026); Utility Dive on the queue audit; ERCOT July 2026 operational overview; Jefferies via Fast Company. Page updated November 4, 2026.
With new approvals and permits paused, an energized hall is worth more than a promised one. We confirm what is powered and when.
DFW for interconnection and wholesale, Houston for energy and Gulf Coast companies, Austin and San Antonio for tech and lower cost, West Texas for scale.
From a few cabinets to multi-megawatt and liquid-cooled requirements, matched to buildings that can deliver them.
The operator you choose pays us. Your rate is not marked up, and you'll hear back within 24 hours.
The 2026 Pause and the Election: What Happens Next
Texas spent the second half of 2026 tightening the path for new data centers, and the November election added a new governor who wants to go further. Here is the sequence, and the dates that decide what comes next.
| Date | What happened | What it means |
|---|---|---|
| Aug 3, 2026 | Governor Abbott ordered ERCOT to audit data centers in its large-load queue, covering power and water use, tax breaks, ownership and community impact | ERCOT delayed its Batch Zero study, effectively pausing new interconnection approvals |
| Sep 14, 2026 | Abbott directed the Texas Water Development Board to penalize data centers that skip its water-use survey | Water reporting became a condition for state permits |
| Sep 21, 2026 | Abbott ordered the TCEQ to stop issuing permits for data center projects until the ERCOT and water audits are done, and told other agencies not to advance approvals | The pause now reaches projects with their own on-site power, not just grid connections |
| Nov 3, 2026 | Gina Hinojosa was elected governor. She has called for a moratorium on new data center construction until the Legislature passes protections | Her proposals include ending the sales tax exemption, letting local officials reject projects, and keeping data centers from raising household bills |
| Dec 10, 2026 | ERCOT is scheduled to present its audit findings to the Public Utility Commission | The first point at which the permit pause could start to lift |
| Dec 2026 | The PUC expects a final decision on how much of transmission costs large loads must pay (Project 58000) | Sets part of what new large projects pay for grid upgrades |
| Jan 2027 | The Legislature convenes January 12 and the new governor takes office | Changes to tax exemptions, local zoning powers or a statewide moratorium would run through this session |
Sources: Texas Tribune on the August, September 14 and September 21 orders; Bracewell on the permit pause; Texas Public Radio on the December 10 presentation; Yahoo Finance on the AP's call of the race; the Hinojosa campaign on her proposals; Fast Company on a governor's powers; Ballotpedia on the session start. The PUC rulemaking is tracked in our data center electric rates tracker, with every Texas filing.
What a governor can do alone
Set priorities and direct state agencies within existing law, as the September 21 order did. Ending tax exemptions or expanding county zoning powers needs the Legislature.
What is not affected
Existing data centers keep operating, and space in energized buildings can still be leased. Projects that already hold their permits appear to fall outside the September order.
What is most exposed
New and early-stage projects that still need permits or a grid connection, including campuses planning their own on-site power.
Texas Data Center Markets
| Market | What is there | Best for |
|---|---|---|
| Dallas-Fort Worth | The state's largest market: carrier hotels downtown, wholesale campuses in Richardson, Garland, Plano, Allen and Red Oak | Interconnection, enterprise and wholesale colocation |
| Houston | The 1301 Fannin carrier hotel and suburban campuses, close to the energy industry | Energy, healthcare and Gulf Coast enterprises |
| Austin | Switch, CyrusOne, Digital Realty and DataBank, with growth in Round Rock and San Marcos | Tech companies and Central Texas enterprises |
| San Antonio | Microsoft's major hub and CyrusOne's Westover Hills campus, with new wholesale campuses | Lower-cost capacity and recovery for other Texas sites |
| West Texas and the Panhandle | Stargate in Abilene, Vantage's Frontier campus, and planned campuses near Amarillo and in the Permian Basin | Hyperscale AI campuses, mostly built for a single tenant |
MCA calculation from straight-line distance, about 1 ms round trip per 100 km; real fiber routes are longer. Free to cite with a link to this page.
Send power, cabinet or megawatt count, connectivity needs and date. You'll hear back within 24 hours with the Texas buildings that fit.
AI Data Centers in Texas
Texas attracts AI campuses for the same reasons it attracts every large industrial load: land, a fast-growing grid, natural gas, and a regulatory culture built for big projects. Most of these campuses are single-tenant builds for hyperscalers and AI labs rather than colocation, but they set the pace for the whole state.
| Campus | Who and where | Planned scale | Status, October 2026 |
|---|---|---|---|
| Stargate Abilene | OpenAI and Oracle, developed by Crusoe on the Lancium site in Abilene | About 1.2 GW | Buildings online since 2025, ramping through 2026 |
| Frontier | Vantage Data Centers, near Abilene | About 1.4 GW | Under construction |
| Project Matador | Fermi America, near Amarillo | Up to about 11 GW planned | Delayed; construction paused in early 2026 |
| GW Ranch | Pacifico Energy, Pecos County | About 7.65 GW, planned with its own generation | Planned |
Sources: ERCOT queue tracker, Compute Law, ROC Telecom. Project scales are as announced and may change.
For a company placing GPUs rather than building a campus, the practical options are liquid-cooled halls in DFW and San Antonio, and smaller AI-ready colocation across the state. See AI and GPU colocation and GB200 and GB300 NVL72 for what high-density racks require.
Power: ERCOT, SB 6 and the 2026 Pauses
Most of Texas runs on ERCOT, a grid largely separate from the rest of the country. Its large-load queue grew from about 63 GW at the end of 2024 to roughly 474 GW by August 2026, more than five times the grid's record peak. Only a small fraction is real: by spring 2026 about 9 GW had approval to energize.
SB 6 (2025)
Sets the rules for loads of 75 MW and more: interconnection standards, financial security, disclosure of duplicate requests, and mandatory curtailment readiness for large loads connecting from 2026.
Batch Zero
A new process approved in June 2026 to study the first group of large-load projects together, with security deposits of about $50,000 per MW.
The 2026 pauses
The August 3 audit order effectively paused new interconnection approvals, and the September 21 order paused state permits for data center projects until the audits are done.
Sources: Utility Dive, Global Data Center Hub, Texas Tribune, ERCOT. Rules are still being finalized by the Public Utility Commission.
Texas Data Center Incentives
Texas exempts qualifying data centers of at least 100,000 square feet that meet investment and job thresholds from state sales and use tax on qualifying equipment, with local tax also exempt for qualifying large projects of at least 250,000 square feet. Texas has no state income tax. Those incentives are now in question from both parties: Governor Abbott has said he will work with the Legislature to end data center incentives, and Governor-elect Hinojosa has called for ending the sales tax exemption. For tenants, any change shows up through the operator's costs rather than as a direct charge.
Sources: Bracewell; the Hinojosa campaign.
What Texas Colocation Costs
Texas markets generally price below Northern Virginia and Chicago, with Dallas and San Antonio among the more affordable large markets for wholesale space. Retail cabinets in the Dallas and Houston carrier hotels cost more than suburban campuses. Current figures are on the colocation pricing guide and each market page.
Who Texas Data Centers Suit
National enterprises
Central location with good latency to both coasts; DFW is a common primary or recovery site.
Energy and industrial companies
Houston's ecosystem and proximity to operations.
AI and GPU deployments
Scale and liquid-cooled capacity, with power dates checked.
Companies leaving cloud or their own server rooms
Lower costs than coastal markets. See cloud repatriation.
Texas and Other Markets
Texas pairs with Atlanta, Phoenix and Virginia for national footprints, and with Mexico for companies serving both sides of the border. For a recovery site, Dallas and Houston back each other up, and Austin and San Antonio sit between them.
How We Find Space in Texas
You send the requirement
Power, cabinet or megawatt count, connectivity, cooling and date. You'll hear back within 24 hours.
We find what is powered
Which Texas halls have space and energized power for your date, including space that is not advertised.
We negotiate and you sign
Rate, power dates, term and exit terms negotiated before you sign. The operator you choose pays us.
Frequently Asked Questions
How many data centers are in Texas?
About 600 by one directory count, concentrated in Dallas-Fort Worth, Houston, Austin and San Antonio, with large new AI campuses in West Texas and the Panhandle. Texas also leads the US in capacity under construction, about 26 GW by JLL's mid-2026 count.
Where are most data centers in Texas?
Dallas-Fort Worth is the largest market, followed by Houston, Austin and San Antonio. The newest large campuses are in West Texas, around Abilene, and planned near Amarillo and in the Permian Basin.
Did Texas pause data center approvals?
Yes, in two steps. On August 3, 2026, Governor Abbott ordered an audit of data centers in ERCOT's large-load queue, which had reached about 474 GW, and ERCOT delayed its Batch Zero study, effectively pausing new interconnection approvals. On September 21, he ordered the TCEQ to stop issuing permits for data center projects until the power and water audits are done. Existing data centers keep operating.
Is there a data center moratorium in Texas?
Not a statewide ban in law. The September 21 order pauses state permits for data center projects until the audits are finished, and Governor-elect Gina Hinojosa has called for a moratorium on new data center construction until the Legislature passes new protections. Ending tax exemptions or changing local zoning powers would need the Legislature, which convenes January 12, 2027.
What does Gina Hinojosa's election mean for Texas data centers?
She takes office in January and has called for a moratorium on new data center construction until lawmakers pass protections, an end to the sales tax exemption, a say for local officials, disclosure of water and power use, and protection for household bills. A governor can direct state agencies within existing law; most of the rest needs the Legislature. Existing, energized data centers keep operating.
When will the Texas data center pause end?
No end date has been set. The permit pause runs until the ERCOT and water audits are complete, and ERCOT is scheduled to present its findings to the Public Utility Commission on December 10, 2026. New rules may follow from the PUC and the 2027 legislative session.
Why are so many data centers being built in Texas?
Land, a fast-growing grid, natural gas, a central location with good latency to both coasts and Mexico, and a regulatory culture used to large industrial projects.
What are the biggest AI data centers in Texas?
The Stargate campus in Abilene for OpenAI and Oracle, about 1.2 GW; Vantage's Frontier campus near Abilene, about 1.4 GW under construction; and planned projects including Fermi America near Amarillo and GW Ranch in Pecos County.
What is the Stargate data center in Abilene?
A campus built by Crusoe on the Lancium site in Abilene for OpenAI and Oracle, planned at about 1.2 GW. Buildings have been coming online since 2025, ramping through 2026.
What is happening with the Amarillo data center?
Fermi America's Project Matador near Amarillo was announced at up to about 11 GW, but construction paused in early 2026 and the project is delayed.
What is SB 6?
A 2025 Texas law setting rules for large loads of 75 MW and more on the ERCOT grid, including interconnection standards, financial security, disclosure of duplicate requests and curtailment readiness. Regulators are still finalizing parts of it.
Do the Texas pauses affect colocation?
Not for space in existing, energized buildings. They matter for new multi-megawatt and AI requirements that depend on new permits or interconnections, so confirm energization dates in writing.
Does Texas offer data center tax incentives?
Yes. Qualifying data centers of at least 100,000 square feet that meet investment and job thresholds can be exempt from state sales and use tax on qualifying equipment, and qualifying large projects of at least 250,000 square feet from local tax too. Texas has no state income tax. Both Governor Abbott and Governor-elect Hinojosa have called for ending data center incentives, so this may change in 2027.
How much does colocation cost in Texas?
Texas markets generally price below Northern Virginia and Chicago, with Dallas and San Antonio among the more affordable large markets. Quotes depend on power, cabinet count, term and connectivity.
Dallas or Houston for colocation?
Dallas for interconnection, the largest choice of buildings and wholesale capacity. Houston for proximity to energy and Gulf Coast companies. Many companies use one as a recovery site for the other, about 3.6 ms apart.
Is Texas a good place for AI and GPU colocation?
Yes for scale and liquid-cooled capacity, with the caveat that new power is slower after the 2026 pauses. Existing AI-ready halls in DFW and San Antonio are the fastest route.
Is the Texas grid reliable for data centers?
ERCOT set a preliminary demand record of 91,134 MW on July 22, 2026, and new rules require large loads to be ready to curtail in emergencies. Facilities rely on on-site generation and redundant feeds, which you should verify for any building.
Do you charge for finding Texas data center space?
No. The operator you choose pays us from its channel budget, and your rate is not marked up. You'll hear back within 24 hours.
Price Your Texas Requirement
Tell us power, cabinet or megawatt count, connectivity needs and date. You'll hear back within 24 hours from the person who will run your search. No cost, no obligation, and the operator you choose pays us.
Once you have contacted an operator directly, it usually will not work through an advisor on your deal.
Texas markets: Dallas, Houston and Austin and San Antonio.
AI and power: AI and GPU colocation, direct to chip cooling, powered land, NVIDIA Rubin and the data center electric rates tracker.
Planning: wholesale colocation, data center cost, disaster recovery and how a data center broker works.
Site owners and developers: data center consulting, powered shell, build to suit and data center due diligence.