Utilities, regulators and legislatures in 45 states have filed, adopted or opened proceedings on special electric rates for data centers and other very large power users. This tracker lists 105 of those filings in one place: the docket number where one is public, where each one stands, the next scheduled decision, what the commission or utility has said it means for a household bill, and the terms intended to keep large customers' costs from shifting to other customers. It is compiled by Metro Colo Advisory from commission orders, utility filings and earnings disclosures, EIA data, and news coverage of commission documents, as part of our data center consulting work on power, site and cost questions.

These rules also shape what it costs to run a data center, since power is one of its largest operating costs. Our data center cost breakdown shows how power pricing flows through to what space costs, and our guides to powered land and powered shell data centers cover how confirmed utility capacity affects site value. Companies that would rather not sign a utility contract directly often lease finished capacity through wholesale colocation.

Updated October 29, 2026. Free to use with credit to Metro Colo Advisory. Download the full dataset (CSV).

FILINGS TRACKED
105
Across 45 states
DECIDED
51
Approved, adopted or in effect
STILL OPEN
52
Pending or open proceedings; 2 others are vetoed or unconfirmed
DATES BEFORE APRIL 2027
12
Votes, deadlines and effective dates

What Gets Decided Next: The Calendar Through Early 2027

These are the scheduled votes, deadlines and effective dates in the dataset between now and the end of the first quarter of 2027. Docket numbers are listed so each can be looked up on the commission's own site.

Nov. 4, 2026New Jersey

BPU stakeholder meeting on large data center tariffs under the Data Center Fair Share Act; written comments due Nov. 13.Docket: EO26080463

Dec. 2026Texas

PUCT expects a final decision on how much of transmission costs large loads must pay.Docket: Project No. 58000

Dec. 16, 2026Louisiana

Public Service Commission scheduled to consider Entergy Louisiana's plan to serve the Meta Richland Parish expansion, after a staff settlement and an Oct. 7 to 9 hearing (as reported).Docket: U-37882

Dec. 18, 2026Ohio

PUCO decision due on the AES Ohio rate case, which creates a data center rate class.Docket: 25-0958-EL-AIR

Dec. 31, 2026Arizona

Deadline for a Corporation Commission vote on the APS rate case, including rates for extra-large users.Docket: E-01345A-25-0105

Dec. 31, 2026New York

Deadline for a PSC staff technical conference on large-load interconnection and cost allocation.Docket: 26-E-0045

Jan. 1, 2027Virginia

Dominion's new GS-5 rate class for high-load customers takes effect, along with the second step of the approved residential increase (+$2.36 a month at 1,000 kWh).Docket: PUR-2025-00058

Jan. 1, 2027California

SB 57 findings due on whether new data center load shifts costs to other customers.Docket: R.26-04-009

Jan. 29, 2027Maine

Data Center Advisory Council final report and any proposed legislation due.Docket: 2026-00142 (related PUC inquiry)

Feb. 1, 2027Wisconsin

Approval date Xcel Energy requested for its new large-load tariff (requested, not scheduled).Docket: 4220-TE-119

Feb. 12, 2027New York

Deadline for a PSC staff white paper recommending a path forward on large-load integration.Docket: 26-E-0045

Q1 2027Wisconsin

Alliant expects a decision on Wisconsin Power and Light's large-load tariff.Docket: 6680-TE-119

VIRGINIA
Virginia's Jan. 1 change is the most concrete for households. The State Corporation Commission's order in Dominion's biennial review approved a residential increase of $11.24 a month in 2026 and a further $2.36 a month in 2027 for a household using 1,000 kWh, and created a new rate class (GS-5) for customers using 25 MW or more at a high load factor. Contracts under GS-5 run 14 years, require minimum payments of 85% of contracted transmission and distribution demand and 60% of generation demand, and carry collateral of $1.5 million per MW. Source: SCC final order, PUR-2025-00058.

What the Filings Say About Household Bills

23 of the 105 filings include a stated figure or claim about residential bills. Some are increases approved by a commission, some are a utility's own estimate of savings from new large customers, and some are figures reported from commission documents. The table shows each one as stated, with who said it. Most filings do not state a household figure at all. Where the filing is a general rate case, the figure is for the whole case, not the data center portion alone.

StateUtility and filingHousehold bill figure, as stated
VirginiaDominion Energy Virginia (Virginia Electric and Power Co.)general rate case with new large-load rate class; PUR-2025-00058+$11.24/month (7.5%) in 2026 and an additional +$2.36/month (1.5%) in 2027 for typical residential customer using 1,000 kWh/month (SCC final order) (whole rate case, not the data center portion alone)
VirginiaDominion Energy Virginia (Virginia Electric and Power Co.)rider proceeding allocating transmission costs to large loads; PUR-2026-00056+$0.94/month for typical residential customer, down from $2.90/month proposed (Rider T1 final order)
West VirginiaMonongahela Power and Potomac Edison (West Virginia)generation certificate and surcharge tied to data center loadMon Power expects surcharge to raise residential rates about 2.3% on average (as reported)
OhioAES Ohio (Dayton Power and Light)general rate case creating data center rate class; 25-0958-EL-AIRPre-settlement figures (whole rate case): typical 1,000 kWh/month customer +1.17% in 2027, +1.49% in 2028, +0.96% in 2029 (PUCO staff testimony as reported); AES Ohio application proposed +$6.54 (3.5%) 2027, +$4.93 (2.5%) 2028, +$2.32 (1.2%) 2029 (OCC). PUCO will rule on the July 2026 stipulation.
PennsylvaniaPPL Electric Utilitiesgeneral rate case with large-load tariff; R-2025-3057164Total monthly bill for a 918 kWh residential customer projected to rise from $177.01 to about $184.49 (PUC decision), effective for service on and after 2026-07-01 (whole rate case, not the data center portion alone)
North CarolinaDuke Energy Carolinasgeneral rate caseAs proposed, before the settlement (whole rate case): $280 to $355 more per year in 2028 for a household using 1,000 kWh a month (Canary Media)
KentuckyLouisville Gas and Electric and Kentucky Utilitiesgeneral rate case with dedicated large-load tariff; 2025-00113 (KU); 2025-00114 (LG&E)KU average increase of $9 a month; LG&E bills up $5 a month (approved settlement) (whole rate case, not the data center portion alone)
IndianaNIPSCO and NIPSCO Generation (GenCo)special contract; Cause No. 46322Utility estimate: about $1 billion in savings for other retail customers via bill credits over the 15-year term; roughly $7 a month residential savings
IndianaAES Indianageneral rate case (rehearing)Original request would have raised bills more than $17 per month; approved settlement raises them just over $9 per month (whole rate case, not the data center portion alone)
MichiganConsumers Energylarge-load tariff; U-21859Company rule of thumb: approximately $7.50 per month of bill benefit with every gigawatt of new large load (CMS Q2 2026 call)
LouisianaEntergy Louisianaspecial contract and resource certification; U-37882 (as reported)Not stated per bill; Entergy says structured to save customers over $2 billion over the life of the 20-year contract
MississippiEntergy Mississippispecial contractEntergy: data center deals (including Amazon) will save Mississippi customers more than $2 billion over two decades; residential rates projected 16% lower by 2030 than otherwise (utility claim)
ArkansasEntergy Arkansasspecial contractNearly $6 a month for ratepayers over 20 years to fund the part of the $1.6 billion project not covered by Google's $526 million payment (Action News 5, citing PSC documents). Entergy says its second-phase Google agreement will save other customers at least $500 million.
ArkansasEntergy Arkansasrider updateRider increase about $5.77/month (about 4.17%) for 1,000 kWh, offset by about $1.55/month nuclear PTC decrease, net about $4.22/month (about 3%); effective with June billings
ArkansasEntergy Arkansasspecial contract (to be filed)Entergy: at least $500 million in new customer savings over 20 years starting 2028; no bill increase tied to the project
OklahomaOklahoma Gas and Electric (OG&E)large-load tariff; PUD2026-000046Estimated residential benefit of about $6.84 per month when Google load fully ramped
North DakotaMontana-Dakota Utilitieslarge-load tariff; PU-22-337Existing customers could save about $250 per year when Applied Digital Ellendale fully built out
ArizonaArizona Public Service (APS)general rate case (large-load class); E-01345A-25-0105APS request: about 14% overall, about $20 added to the average monthly bill; data centers up to 45% (azfamily) (whole rate case, not the data center portion alone)
ArizonaTucson Electric Power (TEP)special contract; E-01933A-25-0187TEP estimates about $13 per month savings for a typical residential customer from 300 MW of load growth
CaliforniaPacific Gas and Electriclarge-load tariff; A.24-11-007PG&E estimates 1 to 2 percent savings on customer bills for every 1,000 MW of new data center demand
KentuckyKentucky Powerspecial contract$100 million in winter bill credits funded by TeraWulf for residential customers over the first 10 years; approximately $25 per month for a typical residential customer during the winter heating season, beginning in 2029
LouisianaCleco Powerspecial contractCleco says the project is projected to reduce monthly rider-related charges for residential customers (utility claim, no figures given)
ArizonaSRP (Salt River Project)board-approved price planAverage residential customer using 1,117 kWh a month will see a 3.5% increase, or $5.61 per month (whole price process, not data-center specific)

"Utility estimate" and "utility claim" figures are the company's own projections and have not been tested by a commission unless noted. Source links for every figure are in the CSV.

How Big the Requests Are Next to the Grids That Would Serve Them

Utilities report data center demand in different ways: signed contracts, agreements in negotiation, or every request in the queue. Requests are not demand. Utilities say some are duplicates or speculative, and some will not be built, so a pipeline can exceed a utility's entire peak load. The comparison below puts four reported figures next to a reference point for that system or state so the scale is readable. Each figure keeps the utility's own term.

Dominion Energy (Virginia)Data center capacity "in various stages of contracting" (about 12,000 MW under signed agreements), July 2026
53,000 MW
 Dominion systems peak, winter 2025
24,678 MW
ComEd (Illinois)Maximum demand requested by 75+ large-load projects, March 2026
28,000 MW
 ComEd highest-ever peak (about)
24,000 MW
New York (statewide)48 large-load projects in the NYISO interconnection queue, January 2026
11,000 MW
 NYISO record peak, July 2013
33,956 MW
Georgia PowerAbout 8,000 MW signed, plus a 3,200 MW OpenAI agreement, July 2026
11,200 MW
 Georgia statewide generating capacity, all utilities, 2024 (EIA); not a peak load
39,746 MW

Navy: figure as reported by the utility or state. Gold: reference point. Reference sources: utility disclosures, NYISO, and EIA State Electricity Profiles (2024).

For regional context, two of the largest grid operators set new records this summer: ERCOT reached 91,134 MW on July 22, 2026 (ERCOT, preliminary) and PJM about 168,000 MW on July 2, 2026 (PJM preliminary estimate, which adds back demand response). AEP Texas alone reports executed letters of agreement for about 49,000 MW of new load by 2031, a figure that includes loads that are not data centers.

IN HOMES
One way to picture 1,000 MW: running at full power around the clock for a year, it would use about as much electricity as 810,000 average U.S. homes. This is our calculation, using EIA's 2022 average of about 899 kWh per residential customer per month (EIA). Real facilities do not run at full power all the time, so treat it as an upper bound for scale, not a forecast.

The Protections Built Into These Tariffs

Most new large-load tariffs are written to keep a data center's costs on the data center if it uses less power than promised or leaves early. 56 filings in the dataset describe adopted or proposed terms for large customers (inquiries that only list topics are not counted). Of those:

Minimum payments

29 filings

Customer pays a set share of contracted demand (often 60% to 85%) whether it uses the power or not.

Long contracts

26 filings

Terms commonly run 10 to 20 years, often with a ramp period at the start.

Collateral or deposits

23 filings

Letters of credit, cash or deposits sized to the costs other customers would otherwise carry.

Exit fees

19 filings

Leaving early means paying remaining minimum charges or the unrecovered cost of upgrades.

Counts are filings whose stated terms mention each protection; one filing can include several. Full terms for each filing are in the CSV.

Whether these terms are enough is argued in many of these dockets. Consumer advocates in several states have challenged settlements as too lenient, and some data center customers argue minimum payments are too high. The tracker records what was filed and decided, not who is right. For a national list of large-load tariffs, the Smart Electric Power Alliance also keeps a tracker (SEPA).

All 105 Filings by State and Utility

Pick a state to see only its filings. Docket numbers are shown as plain text; source links for every row are in the downloadable CSV.

105 filings
StateUtility and filingDocketStatusNext date
AlabamaAlabama PowerAPSC review process for large-load data center contracts under Act 2026-610 (SB 270)33709Alabama Public Service CommissionDecidedapproved (rules adopted)None scheduled
ArizonaArizona Public Service (APS)2025 rate case including changes to Extra High Load Factor (XHLF) ratesE-01345A-25-0105ACCPendingpending2026-12-31 deadline for Commission vote at Open Meeting (ALJ recommended order expected by late November 2026)
ArizonaSRP (Salt River Project)2024 price process: E-67 large commercial and industrial price plan changenot statedSRP Board of DirectorsDecidedapprovedNone scheduled
ArizonaTucson Electric Power (TEP)Energy Supply Agreement with Beale Infrastructure (Project Blue data center)E-01933A-25-0187ACCDecidedapproved (rehearing denied; Attorney General appeal planned)None scheduled
ArkansasEntergy ArkansasGoogle West Memphis data center special rate contractnot statedAPSCDecidedapprovedNone scheduled
ArkansasEntergy ArkansasGenerating Arkansas Jobs Act strategic investment rider annual update (Ironwood, Jefferson, Cypress Solar and Battery; serving Google and Avaio data centers)not statedAPSCDecidedapprovedNone scheduled
ArkansasEntergy ArkansasGoogle West Memphis phase two (batteries, 440 MW solar PPA, Galet substation and 230 kV lines)not statedAPSCPendingproposed (announced 2026-10-19; to be submitted to APSC)None scheduled
CaliforniaCalifornia investor-owned utilities (statewide)SB 57 directs CPUC to investigate cost shifts from new data center loadsR.26-04-009CPUCOpen proceedingpending (investigation)2027-01-01 findings due
CaliforniaPacific Gas and ElectricElectric Rule 30 (transmission-level service for large loads)A.24-11-007CPUCDecidedapproved on an interim basisNone scheduled
CaliforniaSCE (Southern California Edison)Order Instituting Rulemaking on California Advanced Electric Rate Design (data center and large load rate design)R.26-04-009California Public Utilities CommissionPendingpending2027-01-01 SB 57 assessment of data center cost impacts due (coordinated with this OIR)
CaliforniaSDG&E (San Diego Gas & Electric)Order Instituting Rulemaking on California Advanced Electric Rate Design (data center and large load rate design)R.26-04-009California Public Utilities CommissionPendingpending2027-01-01 SB 57 assessment of data center cost impacts due (coordinated with this OIR)
ColoradoBlack Hills Colorado ElectricEconomic development tariff for Large Power Service customers25A-0500ECO PUCDecidedapprovedNone scheduled
ColoradoPublic Service Company of ColoradoLarge Load Tariff (new or expanded loads 50 MW or more), with Clean Transition and Speed-to-Market options26AL-0137ECO PUCPendingpendingNone scheduled
DelawareDelmarva Power & Light (Delaware)Large load tariff, General Service Large Load (GS-LL)25-0826Delaware PSCPendingpending; paused after HB 233 signed 2026-08-26, Delmarva to refile within 180 days after PSC finalizes regulationsNone scheduled
FloridaDuke Energy FloridaPetition for limited proceeding to approve Large Load Customer Policy, Large Load Customer Agreement and revised CIAC tariffs (SB 484)20260064-EIFlorida Public Service CommissionPendingpending (evidentiary hearing held; post-hearing briefs; no order yet)None scheduled
FloridaDuke Energy FloridaProposed LLC-1 rate schedule, Large Load Customer Policy and Agreement (tariff revisions)20250113-EIFlorida Public Service CommissionPendingsuspended pending staff reviewNone scheduled
FloridaFlorida Power & LightLLCS-1 and LLCS-2 large load contract service tariffs in 2026-2029 rate case20250011-EIFlorida Public Service CommissionDecidedapproved (four-year rate agreement)None scheduled
FloridaFlorida Power & LightSB 484 large load compliance filingnot statedFlorida Public Service CommissionPendingpending PSC reviewNone scheduled
FloridaTampa Electric (TECO)SB 484 large load customer tariff proposal (LLCS-1 class)not statedFlorida Public Service CommissionPendingpendingNone scheduled
GeorgiaGeorgia PowerPSC rule on large load customers (100 MW+) terms and contract reviewnot stated (PSC says rule arose from interim IRP Docket 55378)Georgia Public Service CommissionDecidedapprovedNone scheduled
GeorgiaGeorgia PowerCertification of nearly 10,000 MW of new resources largely for data centersnot statedGeorgia Public Service CommissionDecidedapproved; reconsideration effort blocked (2026-03-17)None scheduled
IdahoIdaho PowerSchedule 20, speculative high-density loadsIPC-E-21-37ID PUCDecidedapproved (effective)None scheduled
IllinoisCommonwealth Edison (ComEd)Revised large-load deposit tariffP2025-0677Illinois Commerce Commission (ICC)DecidedapprovedNone scheduled
IllinoisCommonwealth Edison (ComEd)ICC investigation into ratepayer protections for data center (large load) costsnot statedICCPendingpendingNone scheduled
IndianaAES IndianaGoogle Monrovia data center service agreements and related upgradesCause No. 46394IURCDecidedapproved (unanimous vote)None scheduled
IndianaAES IndianaBase rate case rehearing to consider Google data center and BlackRock-led acquisitionnot statedIURCPendingrehearing granted; reopenedNone scheduled
IndianaIndiana Michigan PowerLarge load tariff and interconnection settlementCause No. 46097Indiana Utility Regulatory Commission (IURC)Decidedapproved with modificationNone scheduled
IndianaNIPSCO and NIPSCO Generation (GenCo)Amazon Data Services special contract and NIPSCO-GenCo PPACause No. 46322IURCDecidedapprovedNone scheduled
IowaInterstate Power and Light (Alliant Energy)Individual Customer Rate service agreements and specific ratemaking treatment (QTS Cedar Rapids)TF-2025-0047Iowa Utilities CommissionDecidedapprovedICR filings for a 370 MW data center and another project expected (no date given)
KansasEvergy Kansas Central / Evergy Metro (Kansas)Large Load Power Service rate plan and tariffs25-EKME-315-TARKCCDecidedapprovedNone scheduled
KentuckyEast Kentucky Power CooperativeData Center Power (DCP) tariff2025-00140Kentucky Public Service CommissionDecidedapproved with modificationsNone scheduled
KentuckyKentucky PowerAmended TeraWulf electric service contract (Muskie Data campus, Grayson)not statedKentucky Public Service CommissionPendingannounced; to be filed for PSC approvalKentucky Power to file amended contract later in 2026 (no date given)
KentuckyLouisville Gas and Electric and Kentucky UtilitiesExtremely High Load Factor (EHLF) tariff in 2025 base rate cases2025-00113 (KU); 2025-00114 (LG&E)Kentucky Public Service CommissionDecidedapproved (rate settlement approved; EHLF described by utility as approved)None scheduled
KentuckyLouisville Gas and Electric and Kentucky UtilitiesCPCN for two 645 MW gas units for expected data center load growth2025-00045Kentucky Public Service CommissionDecidedapproved in part (EHLF not approved for cost recovery in this case)None scheduled
LouisianaCleco PowerApplication for approval of Applied Digital (Delta Forge 1) contracts, interconnection, new generation and waivers under the LPSC Lightning Initiativenot statedLouisiana Public Service CommissionPendingpendingNone scheduled
LouisianaEntergy LouisianaMeta Richland Parish (Hyperion) data center: three new combined cycle plants, transmission and up to 1,500 MW solarnot statedLPSCDecidedapprovedNone scheduled
LouisianaEntergy LouisianaMeta (Evest LLC) Richland Parish expansion: seven gas plants, solar, batteries and 500-kV line under 20-year contractU-37882 (as reported)LPSCPendingpending2026-12-16 LPSC scheduled to consider the plan at its Dec. 16 session, after a staff settlement and an Oct. 7 to 9 hearing (as reported)
LouisianaEntergy LouisianaLarge Load High Load Factor Power Service rateU-36959LPSCDecidedapproved (available)None scheduled
MaineCentral Maine Power and Versant PowerInquiry into data centers and large loads2026-00142Maine Public Utilities CommissionOpen proceedingopen; comments received, PUC deciding next steps2027-01-29 Data Center Advisory Council final report and any proposed legislation due to Governor and Legislature
MarylandBGE, Pepco and Delmarva (Maryland)Large load rate schedules under Next Generation Energy Act and 2026 Utility RELIEF ActPC72 (as listed by EEI)Maryland PSCPendingfiled, pendingNone scheduled
MarylandPotomac Edison (Maryland)Large load rate schedule under Next Generation Energy Act and 2026 Utility RELIEF ActPC72 (as listed by EEI)Maryland PSCPendingfiled, pendingNone scheduled
MassachusettsEversource (NSTAR Electric), National Grid (Massachusetts Electric and Nantucket Electric), Unitil (Fitchburg Gas and Electric)DPU directive to electric distribution companies regarding data center interconnection requestsnot statedMassachusetts Department of Public UtilitiesPendingutility informational filings were due 2026-10-23; directive issued 2026-09-24None scheduled
MichiganConsumers EnergyLarge load / data center tariff provisionsU-21859Michigan Public Service Commission (MPSC)DecidedapprovedNone scheduled
MichiganDTE ElectricSpecial contracts with Green Chile Ventures (Oracle) for Saline Township data centerU-21990MPSCDecidedconditionally approved; under appeal at Michigan Court of AppealsNone scheduled
MichiganDTE ElectricSpecial contracts with Google for Van Buren Township data centerU-22058MPSCDecidedapprovedNone scheduled
MichiganDTE ElectricLarge load customer tariff application (required by U-21990 order)not statedMPSCPendingpendingNone scheduled
MinnesotaMinnesota PowerVery large customer tariff26-126Minnesota Public Utilities CommissionPendingpending; updated tariff was due 2026-07-15None scheduled
MinnesotaMinnesota PowerElectric service agreement with Harmony Group LLC (Google) for Hermantown data center26-159Minnesota Public Utilities CommissionPendingpending (comment period closed 2026-08-28; awaiting Commission agenda meeting)None scheduled
MinnesotaOtter Tail PowerPetition for very large customer class and data center rate schedule26-211Minnesota Public Utilities CommissionPendingpendingNone scheduled
MinnesotaXcel Energy (Northern States Power-Minnesota)Very large customer tariff (data centers)25-289Minnesota Public Utilities CommissionOpen proceedingin progress (Commission defined very large customer)None scheduled
MinnesotaXcel Energy (Northern States Power-Minnesota)Electric service agreement with Echo Zone LLC (Google) for Pine Island data center26-170Minnesota Public Utilities CommissionPendingpending (comment period closed 2026-09-08; awaiting Commission agenda meeting)None scheduled
MississippiEntergy MississippiAmazon Web Services data center service agreement (under SB 2001 of 2024)not statedMPSCDecidedin effectNone scheduled
MississippiMississippi PowerSpecial contract with Compass Datacenters Jan I, LLC (Lauderdale County campus)not statedMississippi Public Service CommissionDecidedapprovedNone scheduled
MissouriAmeren MissouriLarge Load Customer Rate Plan (Schedule LLCS)ET-2025-0184Missouri Public Service CommissionDecidedapproved (rehearing application filed by Consumers Council of Missouri 2025-12-03)None scheduled
MissouriEvergy Missouri Metro and Evergy Missouri WestApplication for new and modified tariffs for service to large load customersEO-2025-0154Missouri Public Service CommissionOtherstatus not confirmedNone scheduled
MontanaNorthWestern EnergyLarge New Load Tariff2026.04.023MT PSCPendingpending (filed)None scheduled
Multistate (OH, PA, NJ, WV, MD)FirstEnergy transmission ownersComments proposing data centers pay directly for transmission upgrades via 15-year contracts with expansion rateRM26-4 (accession 20260605-5169)FERCPendingfiledNone scheduled
NebraskaStatewide public power (OPPD, NPPD and all Nebraska public power suppliers)LB 1010 large-load interconnection standards (with LB 1261 co-located generation for 1,000 MW+ loads)LB1010; LB1261Nebraska LegislatureDecidedenactedNone scheduled
NevadaNV Energy (Sierra Pacific Power)Clean Transition Tariff (Google geothermal supply)24-05023PUCNDecidedapprovedNone scheduled
New JerseyAll NJ electric distribution companies (PSE&G, JCP&L, ACE, RECO)Implementation of the Data Center Fair Share Act (P.L. 2026, c.32): Staff RFI on large data center tariffsEO26080463New Jersey BPUOpen proceedingopen (request for information)2026-11-04 BPU stakeholder meeting (Zoom); written comments due 2026-11-13
New MexicoEl Paso ElectricTwo new large load tariffs based on Large Power Service tariff (in rate review)25-00082-UTNM PRCPendingpending (proposed)None scheduled
New MexicoPublic Service Company of New Mexico (PNM)Meta Los Lunas data center special service contracts and related resources25-00048-UTNM PRCDecidedapprovedNone scheduled
New YorkAll PSC-jurisdictional electric utilities (Con Edison, National Grid/Niagara Mohawk, NYSEG, RG&E, Central Hudson, O&R)Proceeding on Motion of the Commission to Address Interconnection Reforms for Large Loads (Energize NY Development)26-E-0045New York Public Service CommissionOpen proceedingopen; SEQRA positive declaration and draft GEIS scope issued2026-12-31 Deadline for staff technical conference (no date set)
North CarolinaDuke Energy CarolinasDEC general rate case (2027 and 2028 rate years) with contested large-load cost allocationnot statedNCUCPendingpending (settlement with Public Staff reported; order expected)None scheduled
North CarolinaDuke Energy Carolinas and Duke Energy ProgressLarge load tariff (Schedule HLF) settlementE-7, Sub 1329; E-2, Sub 1380North Carolina Utilities Commission (NCUC)Pendingpending (settlement filed; NCUC approval required)None scheduled
North DakotaMontana-Dakota UtilitiesHigh Density Contracted Demand Response TariffPU-22-337NDPSCDecidedapprovedNone scheduled
North DakotaOtter Tail PowerNew very large customer class and data center rate schedulePU-26-215NDPSCPendingpending (submitted)None scheduled
OhioAEP Ohio (Ohio Power Co.)Data Center Tariff (Schedule DCT)24-0508-EL-ATAPUCODecidedapproved; appeal by Ohio Manufacturers' Association pending at Ohio Supreme CourtNone scheduled
OhioAES Ohio (Dayton Power and Light)Multi-year distribution rate case with stipulated data center tariff (2027-2029)25-0958-EL-AIRPUCOPendingpending (unopposed stipulation signed 2026-07-21; evidentiary hearing held 2026-08-04)2026-12-18 PUCO final decision due
OhioDuke Energy OhioRate DC (Data Center Tariff)26-0755-EL-ATAPUCOPendingproposed, pendingNone scheduled
OhioOhio Edison, Cleveland Electric Illuminating, Toledo EdisonData Center Tariff (DCT), joint proposal26-0697-EL-ATAPUCOPendingfiled, pendingNone scheduled
OklahomaOklahoma Gas and Electric (OG&E)Extra Large Power and Light (XLPL) tariffPUD2026-000046OCCPendingpending (proposed)None scheduled
OklahomaPublic Service Company of Oklahoma (PSO)Special terms and conditions for new large loads in Large Power and Light (LPL) tariffPUD2025-000075OCCPendingpending (proposed)None scheduled
OregonPacifiCorp (Pacific Power)Schedule 401, new customer class for large energy-use facilitiesADV 1790 / UE 463OR PUCPendingpending (proposed)None scheduled
OregonPortland General ElectricNew large load rate class (POWER Act implementation)UM 2377OR PUCDecidedapproved with modificationsNone scheduled
PennsylvaniaAll PUC-regulated electric distribution companiesInterconnection and Tariffs for Large Load Customers: final model tariffM-2025-3054271Pennsylvania PUCDecidedadopted (guidance; specifics set in EDC tariff filings or rate cases)None scheduled
PennsylvaniaPPL Electric Utilities2025 base rate case settlement with new large load rate class LP-6 and large load tariff provisionsR-2025-3057164Pennsylvania PUCDecidedapprovedNone scheduled
South CarolinaDuke Energy Carolinas and Duke Energy ProgressPetition for generic docket on new large load additions (rate schedules, service regulations, line extension, interconnection)2026-138-EPublic Service Commission of South CarolinaPendingpending (written comment docket)None scheduled
South CarolinaSantee CooperExperimental large load rate for data centers and other large usersnot statedSantee Cooper Board of Directors (not PSC-regulated rate)Decidedapproved (four-year trial)None scheduled
South CarolinaSouth Carolina electric utilities (petition by Duke Energy Carolinas and Duke Energy Progress; DESC participating)Generic docket on new large load (50 MW or greater) additions2026-138-ESouth Carolina Public Service CommissionOpen proceedingopenNone scheduled
South DakotaOtter Tail PowerVery large customer class and high power compute rate scheduleEL26-021SDPUCPendingpending (proposed)None scheduled
TennesseeTennessee Valley Authority (TVA)Wholesale rate structure changes creating a standard data center ratenot applicableTVA Board of DirectorsDecidedapproved; in effectNone scheduled
TexasAEP TexasPUCT large load interconnection standards rulemaking (SB 6)58481Public Utility Commission of TexasDecidedadoptedNone scheduled
TexasERCOT transmission and distribution utilities (statewide rule)Large load transmission cost responsibility rulemaking (response to Governor's 2026-06-10 letter)Project No. 58000PUCTPendingpending (proposed rule)2026-12 PUCT expects final decision on the rulemaking
TexasERCOT transmission and distribution utilities (statewide rule; Oncor, CenterPoint Houston, AEP Texas, TNMP and others)Large load interconnection standards rule (16 TAC 25.194), implementing SB 6Project No. 58481PUCTDecidedapproved (adopted)None scheduled
TexasEl Paso ElectricSchedule 27 High Load Factor Large Power (HLFLP)59611PUCTPendingpending (filed)None scheduled
TexasEl Paso ElectricBase rate review with changes to address large load customers57568PUCTDecidedapprovedNone scheduled
TexasSouthwestern Electric Power Co. (SWEPCO)ES-LL Contract (large load service)58796PUCTPendingpending (filed)None scheduled
TexasSouthwestern Public Service (SPS)Large load tariff proposal60332PUCTPendingpending (submitted)None scheduled
TexasTexas-New Mexico Power (TNMP)New Primary Service Substation rate class under Primary IDR rate (in rate review)58964PUCTDecidedapprovedNone scheduled
UtahRocky Mountain PowerUtah PSC investigation into flexible large-load tariff (following SB 132)25-R318-01; 24-035-43UT PSCDecidednew rule R746-318 in effect; amendments under review; flexible tariff guidance expected before end of 2026None scheduled
VermontGreen Mountain Power and other Vermont distribution utilitiesH.727 data center regulation bill (large load service equity contract)H.727Vermont General Assembly / Public Utility CommissionOthervetoedNone scheduled
VirginiaAppalachian Power (Virginia)Large Power Service rate schedule revisions for new large additionsPUR-2025-00057Virginia SCCDecidedapprovedNone scheduled
VirginiaDominion Energy Virginia (Virginia Electric and Power Co.)2025 Biennial Review; new Rate Schedule GS-5 for high-load customersPUR-2025-00058Virginia SCCDecidedapproved2027-01-01 GS-5 rate schedule effective; contract and collateral terms apply to ESAs signed on or after this date
VirginiaDominion Energy Virginia (Virginia Electric and Power Co.)Rider T1 annual transmission rate case; directive to file line extension policy with mandatory CIAC for direct-connect facilitiesPUR-2026-00056Virginia SCCDecidedapproved (final order); new line extension policy docket to follow2026-10-29 Compliance filing due on amended line extension (CIAC) policy, 90 days from 2026-07-31 order; new docket expected
WashingtonChelan County PUDMicrosoft power contract and Rate Schedule 4 (Large Loads) and 36 (Small Data Centers) updatesnot statedChelan PUD Board of CommissionersDecidedcontract approvedNone scheduled
WashingtonWashington UTC (all investor-owned electric utilities)Large energy load interconnection inquiry and policy statementUE-260162Washington Utilities and Transportation CommissionPendingpendingPolicy statement expected at end of process (six to eight months from April 2026)
West VirginiaAppalachian Power and Wheeling Power (West Virginia)Large Capacity Power (LCP) and Industrial Power (IP) tariff revisions for large loads24-0611-E-T-PWWest Virginia PSCDecidedapprovedNone scheduled
West VirginiaMonongahela Power and Potomac Edison (West Virginia)Maidsville Energy Center CPCN (1,200 MW gas plus 70 MW solar) with proposed surcharge; possible fully bundled data center service agreementnot stated (PSC case activity IDs 656953 and 663675)West Virginia PSCPendingpendingNone scheduled
WisconsinMadison Gas and Electric (MGE)Very Large Customer (VLC) Service tariff and Bespoke Resources Service tariff3270-TE-124Public Service Commission of WisconsinPendingproposed, pendingNone scheduled
WisconsinWe Energies (Wisconsin Electric Power Co.)Very Large Customer (VLC) Tariff and Bespoke Resources Tariff6630-TE-113Public Service Commission of WisconsinDecidedapproved with modifications; rehearing petition filed; circuit court appeal pendingNone scheduled
WisconsinWisconsin Power and Light (Alliant Energy)Electric Service Agreement under Individual Contract Rate tariff for Meta Beaver Dam data center6680-TE-115Public Service Commission of WisconsinDecidedapproved with modificationsNone scheduled
WisconsinWisconsin Power and Light (Alliant Energy)Schedule CP-3 Large Load Power Service Tariff with electric service and customer reimbursement agreements6680-TE-119Public Service Commission of WisconsinPendingfiled, pending2027-Q1 Alliant anticipated decision
WisconsinXcel Energy Wisconsin (Northern States Power Co.-Wisconsin)Large Load Tariff (Very Large General Time of Day Service)4220-TE-119Public Service Commission of WisconsinPendingfiled, pending2027-02-01 Utility requested approval by 2027-02-01 (not scheduled)
WyomingBlack Hills Energy (Cheyenne Light, Fuel and Power)Large Power Contract Service (LPCS)Record No. 14242WY PSCDecidedapprovedNone scheduled
Planning a data center or large power load?
We help companies and landowners work through power availability, tariff terms and site costs before they commit. Reply within 24 hours.
See Data Center Consulting

How This Tracker Was Built

1

What is included

Filings before state commissions (and a few legislatures, public power boards and FERC) that set or change rates, contract terms or interconnection rules specifically for data centers or other very large loads, plus special contracts with named data center customers. Ordinary rate cases are included only when they create a large-load class or tariff.

2

Where the facts come from

Commission orders and dockets first, then utility filings and earnings disclosures, then news reports that quote commission documents. Each row carries its source links and a confidence rating (high when confirmed in a primary document, medium when confirmed only in secondary coverage).

3

How figures are stated

Bill impacts and load figures are kept in the words of whoever stated them, with the source named. We do not convert a utility's pipeline into a forecast or add up figures that use different definitions. Where a parent company reports a figure, it stays at the parent level.

4

Independent check

Rows were re-checked against their sources by a separate reviewer before publishing, and rows that could not be tied to a real filing were removed. Rows rated medium confidence rely on secondary coverage; the rating is in the CSV.

5

Who compiled it

Metro Colo Advisory advises companies on data center sites, power and colocation. The tracker reports filings as stated and takes no position on them.

6

Updates

The calendar and statuses are reviewed as dates pass. Corrections are welcome through the contact page; send the docket number and the document.

How to cite: Metro Colo Advisory, "Data Center Electric Rates by Utility," updated October 29, 2026, https://metrocoloadvisory.com/data-center-electric-rates/. Download the CSV (105 rows, 26 columns).

Frequently Asked Questions

What is a large-load tariff?

A large-load tariff is a set of rates and contract terms a utility applies to customers that use far more power than ordinary businesses, usually above a threshold between 15 MW and 150 MW. Many require long contracts, minimum monthly payments, collateral or exit fees so that the cost of serving the customer stays with that customer.

Do data centers raise residential electric bills?

It depends on the utility and the terms. In this dataset, 23 filings state a household bill figure. Some are approved increases from rate cases that also created data center rate classes, and others are utility estimates of savings from spreading fixed costs across new large customers. Figures from general rate cases cover the whole case, not the data center portion alone, and most filings do not state a household figure.

Which states have adopted data center rates?

In this dataset, 51 filings are decided, adopted or in effect, including Virginia, Ohio, Georgia, Indiana, Michigan, Missouri, Kansas, Idaho, Oregon and others. Use the state filter in the table above to see each state.

What decisions are coming through early 2027?

Scheduled items include the New Jersey BPU stakeholder meeting on Nov. 4, 2026, a Louisiana PSC session on the Entergy and Meta expansion set for Dec. 16 (as reported), the PUCO decision on AES Ohio due Dec. 18, a Texas PUCT decision on large-load transmission costs in December, an Arizona vote on the APS rate case by Dec. 31, and Virginia's GS-5 rate class taking effect Jan. 1, 2027.

Is a utility's data center pipeline the same as future demand?