Neocloud Providers
The Providers Compared, GPU Pricing Against the Hyperscalers, and How to Choose One
Neoclouds rent the same NVIDIA GPUs as the hyperscalers for about half the price. The provider you sign with matters as much as the rate. We quote your requirement across the neoclouds that can deliver it, and check each one before you commit or prepay.
Price My GPU RequirementUpdated October 26, 2026. Company figures from filings and results releases; prices from public rate cards; contract terms from quotes we have seen this month.
Source: GetDeploying’s cloud GPU price tracker and its B300, B200 and H100 pages, October 26, 2026. Listed “from” prices; server configurations differ, and the Lambda H100 rate was listed out of stock. Market size from Synergy Research Group, April 2026. Free to cite with a link to this page.
GPU model, count, term and start date, from one server on a monthly term to a reserved cluster. You’ll hear back within 24 hours. We find the neoclouds that can actually deliver it, benchmark their pricing against the market, and check each provider before you sign. There is no fee to you.
What Is a Neocloud? Neocloud vs Hyperscaler
A neocloud rents GPUs; a hyperscaler rents everything, GPUs included. Here is what that difference means for a buyer.
| Neocloud | Hyperscaler | |
|---|---|---|
| GPU price | Often half the hyperscaler rate for the same GPU, and far lower again on reserved terms | Higher on-demand rates; discounts mostly through large committed-spend agreements |
| Newest GPUs | Often first with new NVIDIA generations; CoreWeave and Nebius had Vera Rubin systems running in September 2026 | Broad availability, sometimes later and with quotas |
| Built for | GPU clusters with high-speed interconnect, tuned for training and inference | Every workload: databases, storage, networking, managed services, and GPUs among them |
| Terms | Negotiable by server, cluster, term and start date; big clusters now come with long terms and prepayment | Mostly standard pricing, with enterprise agreements for large spend |
| Provider risk | Varies by provider: confirm the GPUs, power and financing are in place for your date | Very low: the big three are among the best-capitalized companies in the world |
| Variation between providers | Wide: availability, cluster size, support and terms differ a lot | Narrow: the big three behave similarly |
The State of the Neoclouds: Scale, Backlog and Power
Demand for neocloud capacity is real: the largest providers hold tens of billions of dollars in contracted backlog, and new GPU clusters are booked well into 2027. For a buyer, the practical question is which provider has the GPUs, the power and the financing in place for your cluster on your date. We check each of those before you commit or prepay.
The neoclouds most likely to deliver on a multi-year contract have power already connected, contracts with creditworthy customers, and the financing in place for the hardware they are selling you. Here is what the largest providers report, from their own filings.
CoreWeave
NASDAQ: CRWV · LIVINGSTON, NJ- Q2 2026 revenue of $2.58 billion, up 112 percent
- About $104 billion of contracted backlog
- 1.5 GW of active power, about 3.7 GW contracted
- Vera Rubin NVL72 in production since September 30, 2026
- Clusters are booked well ahead, so confirm the delivery date for yours
Nebius
NASDAQ: NBIS- Q2 2026 revenue of $582 million, up 454 percent; $3.0 billion annualized run rate
- More than $40 billion of customer commitments, including Microsoft (up to $17.4 billion) and Meta (up to $27 billion)
- About $8 billion of cash; expects more than $9 billion of customer prepayments in 2026
- About $5.7 billion of capex in Q2 alone, adding capacity
- Raised on-demand prices October 1, 2026: B300 from $7.85 to $9.50 an hour
Nscale
IPO FILED SEPTEMBER 18, 2026 · LONDON- $103.4 billion of active and contracted deals covering about 461,000 GPUs
- Contracts with Microsoft (up to $43.8 billion) and Anthropic (up to about $44.6 billion)
- First-half 2026 revenue of $140.6 million
Lambda
PRIVATE · SAN FRANCISCO- Backlog of about $50 billion in September, up from $15 billion in June
- Raising up to $4 billion at a $14.5 billion pre-money valuation, with an IPO targeted for 2027
- Multibillion-dollar Microsoft agreement including GB300 NVL72
- Private, so less financial disclosure; its 2026 revenue is reported at about $1.5 billion, an estimate
Crusoe
PRIVATE- Raised $3.9 billion at a $30.9 billion valuation in September 2026
- More than $140 billion of contracted value and more than 6 GW contracted
- About 1 GW operational against that 6 GW: most of the capacity still has to be built
- Revenue is not disclosed
Sources: CoreWeave Q2 2026 results, August 2026; CoreWeave 10-Q for June 30, 2026; TIKR, October 2026; Nebius Q2 2026 shareholder letter, August 2026, and DCD; Nebius price change; Nscale S-1, September 2026; The Next Web, citing Bloomberg; investingLive, citing The Telegraph and Bloomberg; Reuters, citing the WSJ, October 2026; Crusoe Series F, September 2026. Figures are drawn from each company’s own reports, not a credit rating.
We check the provider as hard as it checks you: its funding, its customer concentration, whether the power for your cluster is live, and how your prepayment is protected in the contract. You’ll hear back within 24 hours.
More Neocloud Providers Compared
Beyond the largest four and Nscale, these are the providers buyers most often compare. Research firm SemiAnalysis groups the market into tiers: the hyperscalers, a handful of neocloud giants, a wide field of emerging neoclouds, and brokers and marketplaces at the spot end. For more on alternatives to the largest provider, see CoreWeave competitors.
| Provider | Latest | Worth knowing |
|---|---|---|
| FluidstackPrivate, New York | Raised $1.5 billion at an $18 billion valuation, September 2026 (Dealroom) | Builds for Anthropic, Meta, Mistral and Poolside, largely on power from former bitcoin miners |
| Together AIPrivate, San Francisco | Raised $800 million at an $8.3 billion valuation, July 2026 (Dealroom) | Inference and training platform; annual bookings passed $1.15 billion in Q2 2026 |
| VultrPrivate, West Palm Beach | Reported to be seeking at least $1 billion of new funding in 2026 | Broad cloud with GPUs, including a large AMD GPU cluster in Ohio |
| Bare metal GPU providers | Dedicated GPU servers by the month | Best for one to a few servers with full control. See bare metal |
Neocloud Pricing Against the Hyperscalers
Neocloud GPU pricing is quoted per GPU-hour, on demand or on a reserved term. On-demand rates are rising for the newest GPUs: Nebius raised its B300 rate from $7.85 to $9.50 an hour on October 1. Reserved terms are where the large discounts are, but they now come with longer commitments and money up front.
| GPU | Neocloud, on demand | Reserved | Hyperscaler, on demand | Detail |
|---|---|---|---|---|
| B300 | Nebius $9.50, Crusoe $9.90, Together $9.99; median $9.50 | About $4.50 to $6 on 24 to 36-month terms | Oracle $15.00, AWS $17.80 | B200 and B300 rental |
| B200 | Lambda $6.69, Together $8.19, Nebius $8.50, CoreWeave $8.60; median $7.99 | Quoted per requirement | Oracle $14.00, AWS $14.24 | B200 and B300 rental |
| H200 | Crusoe $4.29, Nebius $5.40, Together $5.99, CoreWeave $6.30; median $4.78 | Quoted per requirement | AWS $7.91, Azure $13.78 | H200 rental |
| H100 | Lambda $3.29, Crusoe $3.90, Together $3.99, Nebius $4.50; median $3.80 | Quoted per requirement | AWS $6.88, Azure $6.98, Google Cloud $11.07 | H100 rental |
On-demand prices per GPU-hour from GetDeploying’s cloud GPU price tracker and its B300, B200, H200 and H100 pages, October 26, 2026; listed “from” prices, and configurations differ. Reserved B300 range from provider quotes we have seen in October 2026. Updated monthly on the GPU rental hub.
What a reserved neocloud contract looks like now
From the quotes crossing our desk this month for reserved Blackwell clusters:
Minimum term on new reserved Blackwell clusters, up from 24 a year ago.
Typical prepayment, credited against the monthly fee.
Ready-for-service dates for new B300 clusters quoted now.
Switch shortages add three months or more to InfiniBand builds.
High-performance shared storage is quoted separately, often around $0.04 per GB a month.
How to Choose a Neocloud Provider
Confirm the GPUs exist on your date
For new clusters, ask for the ready-for-service date in writing, not a waitlist position. New B300 clusters are quoting early 2027.
Match the cluster to the workload
Training needs a non-blocking fabric between servers, InfiniBand or RoCE; inference often does not. Paying for a training fabric you will not use is common.
Price the whole bill
Storage, data transfer, support and idle reserved capacity can change the answer. Compare total monthly cost at your expected utilization, not the hourly rate.
Read the commitment terms
Check the minimum term, the prepayment, what happens if you need to scale down or move to Rubin, and whether you can leave early.
Check the provider, not just the price
Debt, customer concentration, whether the power for your cluster is already connected, and how the provider is funding the GPUs it is promising you. A low rate from a provider that cannot deliver is the most expensive option.
Protect any prepayment
Tie prepayments to delivery milestones and get the right to terminate for missed dates. Microsoft’s contract with Nebius works this way, and smaller buyers can ask for the same.
Quote several at once
Neocloud rates for the same GPU vary by more than double, and the provider that wins on price is not always the one that can deliver. Comparing several against current benchmarks finds the real market.
One server or a thousand GPUs, on demand or reserved: we take the requirement to the neoclouds that can deliver it, compare the full bill and terms, check each provider’s footing, and negotiate before you sign. There is no fee to you.
Who Rents From Neoclouds
AI companies training models
Reserved clusters of H200, B200, B300 or GB300 GPUs on a non-blocking fabric, now usually on 24 to 36-month terms. See GPU cluster rental.
Inference at scale
Serving models in production, where cost per token and reliable capacity matter more than interconnect. The H200 and B200 are common choices for their memory.
Enterprises adding AI
Teams that run the rest of their stack on a hyperscaler but rent GPUs from a neocloud for price or availability, often connected privately. See hybrid cloud.
Startups and researchers
One to a few GPUs on demand or by the month, to experiment before committing. See GPU rental.
Building a Neocloud? The Data Center Capacity Behind It
Most neoclouds run on data center capacity they lease rather than own, and power is now the dividing line between the providers that deliver and the ones that wait. Primary-market vacancy is 1.4 percent and just 0.2 percent in Northern Virginia, more than 80 percent of the capacity under construction is already preleased, and many halls marketed for AI cannot support rack-scale liquid-cooled systems on the date you need. Nscale’s Essex site, where grid power may not arrive until the 2030s, shows what happens when a provider signs before its power is secured. Expanding neoclouds need what any large tenant needs: facilities that can actually deliver the density, power and date, compared on terms.
Air-cooled GPU capacity
HGX-class servers at 35 to 70 kW per rack fit a wider set of existing halls, with rear-door heat exchangers or containment at the top of the range.
Liquid-cooled capacity
Rack-scale systems at 120 kW and up, and Vera Rubin racks beyond that, need direct-to-chip cooling delivered to the rack, which far fewer facilities can provide on a near-term date. See NVIDIA Rubin.
Wholesale and build to suit
Multi-megawatt requirements usually mean a prelease or a building developed for you. See wholesale colocation and build to suit.
Vacancy and preleasing from CBRE North America Data Center Trends H1 2026. Build costs per megawatt in our data center cost dataset.
Send the requirement: MW, density, cooling, regions and date. You’ll hear back within 24 hours. We take it to the operators across North America and beyond that can deliver it, and check that each power date is real before you sign. The operator you choose pays us.
What Operators Ask Newer GPU Companies Before They Sign
Landlords and operators want proof that a GPU tenant can pay for the whole term, not just the first year. In practice that means an investment-grade guarantee, a letter of credit, a deposit or a prepayment, and often more than one.
The reason is the gap between the lease and the business behind it: data center leases often run 15 years, while many GPU customers sign by the hour or for one to three years. Below is what each form of credit support looks like in recent deals, and what happened when it was missing. If you are placing GPUs now, our AI and GPU colocation team can tell you which buildings will sign with you.
An investment-grade company stands behind the rent
$7.0 billion15-year, 245 MW lease at Hut 8's River Bend campus, backed by GoogleThe tenant is Fluidstack, a newer GPU company. Behind it stands Google, rated AA+ by S&P, which "is providing a financial backstop, which covers the lease payments and related pass-through obligations." Google did the same at Cipher Mining's Texas site, where it agreed to "backstop $1.4 billion in the startup's lease obligations."
Sources: Hut 8 press release (Dec 17, 2025); Fortune (Sept 25, 2025).
A bank promises to pay if the tenant does not
$294 millionCoreWeave letters of credit outstanding at the end of 2025, down from $533 million a year earlierCoreWeave's annual report says these letters "primarily guarantee the Company's ability to fulfill its lease obligations." It also lists $38.5 billion of leases signed but not yet started, beginning between 2026 and 2029 with terms of five to 17 years.
Sources: CoreWeave Form 10-K FY2025, Commitments and Contingencies note and Leases note (via edgar.tools).
A strong customer pays up front, and the cash flows down
20%prepayment in Microsoft's roughly $9.7 billion, five-year contract with IRENIREN's contract with Microsoft carries "a total contract value of approximately $9.7 billion, including a 20% prepayment," and IREN names customer prepayments among the ways it will fund the build. A prepaid customer contract gives a GPU company both cash and contracted income to show a landlord or lender.
Source: IREN press release (Nov 3, 2025).
Cash held by the operator
About 6 monthsof payments up front: our experience, not a published figureIn the searches Metro Colo Advisory runs, operators commonly ask newer GPU companies for about six months of payments up front. Law firm Morgan Lewis lists the same family of protections in colocation agreements: "credit checks, financial reporting requirements, security deposits," plus the right to require prepayment if a customer's credit weakens.
Sources: Metro Colo Advisory placement experience; Morgan Lewis, Data Center Bytes (May 18, 2026).
Why operators ask: the term mismatch
"They're signing 15-year data center leases," while their customer agreements are "by the hour, the day, the month, max one to three years." Jeffrey Moerdler, Haynes Boone
Sources: Bisnow (Oct 20, 2026); lease length from Hut 8 and Fermi releases.
Lenders see the same risk. Neocloud financings now often involve "investment-grade guarantors or significant upfront collateral."
Source: Bisnow, 'WeWork 2.0': Booming AI Startups Concern Some Data Center Execs (July 27, 2026).
Deals that stalled on credit or power
Fermi and TensorWave, Project Matador
222 MWabout $6.5 billion over a 15-year initial termThe signed lease could not close while Fermi "continues to negotiate a guaranty of certain lease obligations with an investment-grade counterparty." The closing date was pushed to October 31, 2026, then "passed without extension." As of Fermi's November 3 update, "Neither party has exercised any right to terminate the Lease."
Sources: Fermi press release (Sept 22, 2026); Fermi update (Nov 3, 2026).
Microsoft and Nscale, Loughton, England
50 MWcampus planned for 23,040 GB300 GPUs"A company spokesperson confirmed that Microsoft terminated the contract" after UK Power Networks said it could not supply enough electricity for the site until the early to mid-2030s. Credit was not the problem here. The customer walked because the power date was too far out.
Source: Data Center Knowledge (Oct 19, 2026).
How to get to signature faster
- Send your funding position with the requirement. Committed equity, debt facilities and cash on hand, on one page. Operators read the requirement and the balance sheet together.
- Bring your customer contracts. Signed, reserved or prepaid contracts with their terms and counterparties show the operator where the rent comes from.
- Line up credit support before the letter of intent. A parent or third-party guarantee, a letter of credit from your bank, or cash for a deposit. In our searches, plan on about six months of payments.
- Ask for a term you can support. An operator weighs a 15-year request against customer contracts of one to three years, so be ready to explain the gap.
- Expect reporting covenants. Financial reporting and a right to require prepayment if credit weakens are common asks, so agree them early instead of fighting them late.
- Confirm the power date before you sign customers. Check how far the site's utility paper has gone using our AI Power Reality Check.
- Send everything at once. In our experience, operators with near-term space give it to the companies that arrive with complete information.
Send us the requirement and your funding position. You'll hear back within 24 hours.
How We Help
We are an independent broker on both sides of the neocloud market. For GPU renters, we take your requirement to the neoclouds that fit, compare the full bill and terms, check each provider’s funding, customers and power, and negotiate before you sign, including how any prepayment is protected. For neoclouds and GPU providers, we find data center capacity through AI and GPU colocation. There is no fee to you either way. How a data center broker works.
Frequently Asked Questions
What is a neocloud?
A cloud provider built specifically to rent GPU compute for AI training and inference, rather than the broad range of services a hyperscaler like AWS, Azure or Google Cloud sells. CoreWeave, Nebius, Lambda and Crusoe are the largest.
What are the main neocloud providers?
The largest are CoreWeave, Nebius, Lambda and Crusoe, followed by Nscale, Fluidstack, Together AI and Vultr, plus bare metal GPU providers that rent dedicated servers by the month.
How big is the neocloud market?
Neocloud revenue passed $25 billion in 2025, according to Synergy Research, which forecasts close to $400 billion by 2031, growth of about 58 percent a year.
Are neoclouds cheaper than AWS or Azure?
Usually, for GPUs. In October 2026 a B300 listed from $9.50 an hour at Nebius against $17.80 at AWS, a B200 from $6.69 at Lambda against $14.24 at AWS, and an H100 from about $3.30 to $4.50 at the main neoclouds against $6.88 at AWS.
Are neoclouds financially stable?
It varies by provider. The largest hold tens of billions of dollars of contracted backlog. Before you prepay, check that the GPUs, the power and the financing for your cluster are in place for your delivery date, and that the contract protects your prepayment if that date slips.
What happens to my contract if a neocloud runs into trouble?
That depends on how the contract is written. Tie any prepayment to delivery milestones, get the right to terminate if dates are missed, and know who holds your data and how you get it out. Large buyers already do this: Microsoft’s contract with Nebius links its prepayments to delivery milestones and lets it terminate if schedules slip.
Why are neoclouds asking for longer terms and prepayment?
Because they are financing the GPUs. Long contracts with creditworthy customers are what lenders lend against, and prepayments fund the hardware directly. Reserved Blackwell clusters quoted in October 2026 typically require 36 months and 25 percent or more up front.
Did neocloud GPU prices go up in 2026?
For the newest GPUs, yes. Nebius raised its on-demand prices on October 1, 2026, including the B300 from $7.85 to $9.50 an hour and the B200 from $7.15 to $8.50. Reserved rates remain far lower, at about $4.50 to $6 for a B300 on a 24 to 36-month term.
What is the difference between a neocloud and a hyperscaler?
A neocloud focuses on GPU compute for AI, with lower prices, earlier access to new GPUs and negotiable terms. A hyperscaler sells every kind of cloud service, with deep integration across them, higher GPU rates and very low provider risk.
How do I choose a neocloud provider?
Confirm the GPUs exist on your date, match the cluster and interconnect to the workload, price the whole bill, read the commitment terms, check the provider’s funding and power, protect any prepayment, and quote several providers at once.
Can I rent a single GPU server from a neocloud?
Yes. Many neoclouds and bare metal providers rent single servers on demand or by the month, and some start at one GPU. Larger clusters are usually reserved on a term.
Is CoreWeave a neocloud?
Yes. CoreWeave is the largest independent neocloud, reporting $2.58 billion of revenue in the second quarter of 2026, up 112 percent, and about $104 billion of contracted backlog.
Where do neoclouds get their data center capacity?
Mostly by leasing it from colocation operators and developers, and increasingly through campuses built for them. Capacity is scarce: CBRE put primary-market vacancy at 1.4 percent in the first half of 2026, with more than 80 percent of the capacity under construction already preleased.
Does using a broker cost more when renting GPUs?
There is no fee to you. We are paid by the provider or within the single all-in rate we negotiate, and we show you that rate against current market pricing so you can see exactly what you are paying. What you gain is the providers that can actually deliver, a check on each one, and negotiated terms.
Price Your GPU Requirement
Send what you need: GPU model, count, term and start date, or for capacity, the megawatts, density and regions. You’ll hear back within 24 hours. We find the providers that can deliver it, benchmark their pricing against current rates, and check each one before you commit.
Once you have contacted a provider directly, it usually will not work through an advisor on your deal, and you lose the comparison. There is no fee to you.
Renting GPUs: GPU rental, H100 rental, H200 rental, B200 and B300 rental, GB200 and GB300 NVL72 rental, GPU cluster rental, NVIDIA Rubin, CoreWeave competitors and bare metal.
Hosting GPUs: AI and GPU colocation, wholesale colocation, build to suit, cloud repatriation and hybrid cloud.
Markets and more: Dallas, Atlanta, Northern Virginia, Chicago, data center developers, data center cost, the colocation pricing guide and how a data center broker works.