IT Infrastructure Consulting
Where Each Workload Should Run, the Cost Model Behind the Decision, and What a Fixed-Fee Engagement Delivers

Steady workloads typically cost 30 to 50 percent less on dedicated capacity, and bursty ones cost less in the cloud. Our engagements draw that line workload by workload, independent of anyone who would run the result.

Compare My Infrastructure Costs
For CIOs, infrastructure leaders and finance teams Independent of every cloud, operator and vendor Fixed fee, reply within 24 hours
THE SHORT ANSWER
IT infrastructure consulting is outside advice on the systems a company runs on: servers, storage, network and the places they live. The most valuable question it answers is placement: which workloads belong in the public cloud, which in colocation on owned hardware, which on rented bare metal, and what each costs over three to five years. For a company with steady workloads, moving them off the cloud typically saves 30 to 50 percent on those workloads once every cost is counted, and optimizing the cloud bill first takes 15 to 25 percent off a bill that has never been negotiated. Many IT consulting firms also sell what comes after that decision: managed services, migrations, hardware or cloud resale. Our engagements stop at the decision, delivered as a written report and a cost model at a fixed fee, typically $50,000 to $195,000, in three to six weeks.

The usual way to buy infrastructure advice is to ask the people who will run the result, and the answer tends to match what they sell. This page describes a different kind of engagement, written by an advisory practice that does not resell cloud capacity, hardware or managed services, prices the options on every side of the decision, and is paid the same engagement fee whatever the answer turns out to be. If the answer is to lease capacity, the provider chosen pays the placement fee, and that is disclosed before work starts.

WASTED CLOUD SPEND
29%
of cloud spend in 2026, the first rise in five years
COLOCATION VACANCY
1.4%
in primary markets, so the dedicated side of a decision is timed by availability
OPTIMIZING FIRST
15 to 25%
off a cloud bill that has never been negotiated or rightsized
MOVING STEADY WORKLOADS
30 to 50%
saved on the workloads that move, once every cost is counted

Sources: Flexera 2026 State of the Cloud (waste); CBRE H1 2026 (vacancy); the two savings ranges are the Metro Colo Advisory market read from our cloud repatriation work, relative positions rather than quotes, and the repatriation range is consistent with a16z, which put repatriated workloads at one-third to one-half the cost of equivalent cloud.

What a Placement Engagement Does, Week by Week

An engagement runs from your billing exports and a short questionnaire to a readout in three to six weeks. The sort comes before the pricing, because pricing a workload that should not move wastes everyone’s time.

BaselineCurrent spend by workload and cost type, from your exports
Weeks 1 to 2
Placement sortEvery workload into stay, move or move later
Weeks 2 to 3
Cost modelCloud as optimized, bare metal, colocation, hybrid, with migration cost
Weeks 3 to 5
Report and readoutWritten report, working model, executive summary
Weeks 5 to 6
Written questionsAfter delivery, with the person who built the model
Two weeks after delivery

Metro Colo Advisory engagement timeline for a mid-size enterprise footprint; multi-region or multi-cloud footprints run toward the longer end. Figures as of October 2026. Free to cite with a link to this page.

FREE WORKLOAD REVIEW
Send us your workloads before you send them anywhere.
What you send.
Annual cloud and infrastructure spend, the main workloads and roughly how steady each one is, and the decision in front of you.
What you get back within 24 hours.
A reply from the person who would run the engagement, with a first read on whether a placement change is worth modeling.
An answer either way.
If your infrastructure is already where it should be, we will tell you so, and it will have cost you one email.
What it costs.
The first read is free. A full engagement is a fixed fee agreed before work starts. If you later lease capacity, the provider you choose pays the placement fee.
Compare My Infrastructure Costs

Which Workloads Belong Where

Placement is decided by how a workload behaves, not by what it is called. Steady, egress-heavy, latency-sensitive work with few managed-service dependencies moves well; bursty work built on a cloud provider’s own services usually stays. This is the first pass we run on every engagement, before any pricing.

Workload profileUsual best homeWhy
Steady compute, high utilizationCore application tiers, databases, servingColocation on owned hardware, or bare metalPaying on-demand or even committed cloud rates for capacity that runs flat out all year is where the 30 to 50 percent comes from.
Egress-heavyContent delivery, data serving, ad tech, APIsDedicated, with flat-rate transitCloud egress is priced per gigabyte and is not covered by compute commitments; a dedicated port is a flat monthly fee. See the bare metal guide.
Latency-sensitiveTrading, real-time bidding, gamingColocation near the counterparty or exchangeDistance sets latency, and the right building beats any instance type.
AI trainingLarge clusters, weeks-long jobsOwned GPUs in high-density colocation, or reserved GPU rentalUtilization decides it: at high, sustained utilization owning wins over three years; at low utilization renting does. See AI and GPU colocation and GPU rental.
AI inferenceServing models in productionDedicated, close to the applicationSteady, latency-sensitive and egress-heavy at once, which is the profile that moves best.
Bursty or seasonalBatch jobs, campaigns, peak eventsPublic cloud, on spot or on-demandPaying only for the hours used beats owning capacity that sits idle most of the year.
Built on managed servicesManaged databases, queues, data warehouses, serverlessPublic cloud, usuallyThe service is the lock-in, not the compute. Re-platforming it is a project in its own right and is costed separately when it is worth doing at all.
Dev, test and experimentationShort-lived environmentsPublic cloudSpeed of provisioning matters more than unit cost.
Regulated or sovereign dataHealth, financial, government, in-country rulesColocation or private cloud in the required jurisdictionControl of the hardware and the location is the requirement. See compliance colocation and managed private cloud.
WHAT THAT MEANS
For most companies above about $50,000 a month in cloud spend, the answer is hybrid: the steady third to half of the footprint moves to dedicated capacity and the rest stays, connected by a private interconnect. Metro Colo Advisory market read; the cloud repatriation guide has the arithmetic behind it. The engagement’s job is to draw that line workload by workload, with the cost of each side and the cost of moving, rather than to argue for cloud or against it. The hybrid cloud colocation guide covers how the two halves connect.

What Our IT Infrastructure Consulting Services Include

Every engagement is scoped to the decision in front of you, but the work draws on the same six pieces. Each one is there to make the final number defensible to a board, a lender or the other side of a transaction.

Workload placement analysis

Every workload sorted by what it does, what it depends on and how steadily it runs, into stay, move and move-later. This step is often skipped, and it is where the real answer lives.

The three-to-five-year cost model

Cloud as optimized, bare metal, colocation on owned hardware and hybrid, built from your billing exports and current market rates rather than list prices, with the inputs shown so your finance team can change them.

Migration cost and sequencing

What it takes to move each workload, in people, time and one-time cost, and the order that keeps production safe. A saving that costs two years of engineering to collect is not a saving.

Network and connectivity design

How the halves of a hybrid footprint connect, what private interconnect to the cloud costs, where the on-ramps are, and what the egress bill becomes. See data center connectivity.

Location and capacity

Which markets and facilities can take the dedicated footprint on your date, at your density, with the latency your users need. See data center site selection.

Hardware and platform mapping

What the dedicated side runs on, server class by server class, including the x86 and Arm question for workloads already built to run on both, and what it costs at list and at volume.

What We Do Not Do, and Why It Matters

Three things are deliberately absent from our engagements, and each one removes a reason to prefer one answer over another.

Not includedWhy it is left outWhat you get instead
Managed servicesAn advisor who will also run your infrastructure has a reason to recommend infrastructure that needs running.A decision you can hand to any operator, your own team or a managed provider you choose.
Hardware and cloud resaleA margin on servers or cloud credits is a reason to recommend servers or cloud credits.Hardware priced at list and at the volume rates we see, with no markup and no preferred vendor.
A success fee on the savingA fee tied to the size of the saving is a reason to overstate it.An engagement fee fixed before work starts, the same whether the answer is move, stay or wait.

One thing is paid by someone other than you: if the engagement ends in leasing colocation or bare metal capacity, the provider you choose pays our placement fee, as it would pay any broker. That is disclosed before work starts, and the engagement fee does not change with it.

What an engagement delivers
The question it answers
Where should each workload run, what does each option cost over the term, and what does it take to get there?
What you receive
A written report, the cost model as a working spreadsheet with its assumptions exposed, an executive summary for the board, and a period of written questions and answers after delivery.
Timing and fee
Three to six weeks from receipt of your billing exports and a short questionnaire. Fixed fee, typically $50,000 to $195,000 depending on scope.
Precision
Directional: enough for a go or no-go and for choosing a path. Operator and vendor quotes, which make the numbers exact, come in the placement step that follows.
Scope My Engagement

What the Cost Model Starts From

The comparison is always between optimized cloud and the dedicated options, never between list-price cloud and anything, because comparing against list is how repatriation cases get overstated. The cloud repatriation guide compares the four paths, bare metal, colocation on owned hardware, optimized cloud and hybrid, with the egress arithmetic and the exit waivers; the colocation pricing guide and data center cost carry the market figures by metro. The model takes those as starting points and replaces them with your billing export and the rates we see in the market that month. The colocation side of the arithmetic looks like this.

WHAT THAT MEANS
At about $204 per kW per month, 500 kW of colocation costs about $1.22 million a year for space and power before hardware, and 1 MW about $2.45 million. Whether that beats the cloud depends entirely on how steadily the capacity runs: hardware that sits at 20 percent utilization is expensive anywhere, and hardware that runs flat out is cheap to own. MCA calculation. This is why the engagement starts with workload behavior rather than with a rate card.
THE TRIGGERS

When to Bring in an IT Infrastructure Consultant

The cloud bill has passed seven figures and keeps growing.
Optimization has been done, the easy savings are taken, and the next round finds less.
A board, a lender or a transaction is asking about infrastructure cost.
The answer has to be written, defensible and independent of the people who run the systems.
A commitment is coming up for renewal.
A cloud enterprise agreement or a colocation lease, where the choice is to renew or to move and the model prices both.
An AI workload is arriving.
GPUs at scale change the economics of owning versus renting and the density any facility has to support.
A data center lease is ending or a server room is closing.
Everything in it has to go somewhere, and the choice is between cloud, colocation and bare metal workload by workload.
An acquisition has doubled the footprint.
Two of everything, in two places, on two contracts.

How an IT Infrastructure Consulting Engagement Runs

1

The free workload review

You send your spend and workloads. Within 24 hours you hear back from the person who would run the engagement.

2

Scope and engagement letter

The question, the deliverables, the timeline and the fixed fee, in writing. Work starts on receipt of your billing exports and the questionnaire.

3

Baseline and placement

Your current spend by workload and cost type, then every workload sorted into stay, move and move-later with the reasoning for each.

4

The model and the report

Each scenario costed over the term with migration cost included, delivered as a report, a working spreadsheet and an executive summary, then a period of written questions and answers.

5

Placement, if you move

If the answer is to lease capacity, we run the data center RFP and negotiate the contract. The provider you choose pays for that step.

Already know what you need to place?
If the decision is made and the question is where to put the capacity, skip the engagement: send the requirement and we run the search and the negotiation. The provider you choose pays us, so it costs you nothing.
Price My Requirement

Six Infrastructure Decisions That Go Wrong

Comparing against list-price cloud

The case has to beat the bill after commitments, rightsizing and a negotiated agreement. Compared against list, almost anything looks cheaper. See cloud repatriation.

Moving everything, or nothing

The answer is almost always a line through the footprint. Re-platforming the managed-service layer takes years; leaving steady capacity on cloud rates costs every month.

Forgetting egress and the people

Data leaving the cloud is priced per gigabyte, and dedicated capacity needs engineers to run it. Both belong in the model at a loaded cost.

Asking the vendor

A cloud partner, a reseller and a managed provider each have a view, and it tends to match what they sell. Independent advice costs a fixed fee.

Deciding the where before the what

Picking a market or a facility before the workloads are sorted produces a deployment sized for the wrong footprint. Placement first, then capacity.

Treating the decision as final

Workloads that were bursty become steady as a product matures. The line through the footprint should be revisited as spend grows, which is why the model is handed over as a working spreadsheet.

We advise companies across the United States and Canada, with market guides for New York, Virginia, Texas, Chicago, Phoenix and Canada where the dedicated half of a footprint most often lands.

Related guides for the decision itself: cloud repatriation for the cloud-side arithmetic and the exit waivers, FinOps consulting for what to do when the bill is already optimized, VMware alternatives for the licensing question that often triggers the review, data center migration for the move itself, and wholesale colocation for footprints above 1 MW. Owners, developers and investors evaluating a site or a transaction are served by data center consulting and data center due diligence.

IT Infrastructure Consulting: Frequently Asked Questions

What is IT infrastructure consulting?

Outside advice on the systems a company runs on and where they should live: public cloud, private cloud, colocation on owned hardware, rented bare metal or a hybrid of them. A placement-focused engagement answers which workloads belong where, what each option costs over three to five years, and what it takes to move, delivered as a written report and a cost model.

What do IT infrastructure consulting services include?

Workload placement analysis, a three to five year cost model across cloud, bare metal, colocation and hybrid, migration cost and sequencing, network and connectivity design, location and capacity options, and hardware and platform mapping. Managed services, hardware resale and cloud resale are not included, which is what keeps the advice independent.

How much does IT infrastructure consulting cost?

Our engagements are a fixed fee, typically $50,000 to $195,000 depending on scope, agreed before work starts and the same whatever the answer. The first read, a free workload review, costs nothing. If the engagement ends in leasing capacity, the provider you choose pays the placement fee, which does not change the engagement fee.

How long does an infrastructure consulting engagement take?

Three to six weeks from receipt of billing exports and a short questionnaire, for a mid-size enterprise footprint. Larger or multi-region footprints take longer, and the free workload review that precedes it takes one email.

What is the difference between an IT infrastructure consultant and a managed services provider?

A consultant is paid for the decision; a managed services provider is paid to run the result. The two can be the same firm, but then the advice tends to point toward infrastructure that needs running. A consultant with no managed services, resale or success fee has no reason to prefer one answer.

Should we move off the cloud?

Partly, usually. For companies above about $50,000 a month, the steady third to half of the footprint typically saves 30 to 50 percent on dedicated capacity once every cost is counted, while bursty work and anything built on managed services stays. Those are market ranges, not quotes; the engagement draws the line workload by workload with your own numbers.

Who reads the report, and what happens after delivery?

It is written for the infrastructure leader who commissioned it and for finance and the board who will act on it: a report, a working model with its assumptions exposed, and an executive summary. A period of written questions follows delivery, and if the answer is to lease capacity, we run the search and negotiate the contract as a separate step paid by the provider.

What do you need from us to start an engagement?

Billing exports from each cloud and any colocation or hosting invoices, a short questionnaire on workloads, regions, managed-service dependencies, traffic and egress, and a blended engineering cost. The clock starts when those arrive. A mutual NDA covers everything before any data changes hands.

How does a hybrid cloud infrastructure work?

Steady workloads run on dedicated capacity, variable ones stay in the public cloud, and a private interconnect joins the two so the application behaves as one system. Most placement engagements land here. The hybrid cloud colocation guide covers the connection options and their costs.

Do you work with AI and GPU infrastructure?

Yes. The owning versus renting decision for GPUs, the density a facility has to support, and where rack-scale capacity exists are part of the placement analysis when AI workloads are in scope. See the AI and GPU colocation and GPU rental guides.

Can you prepare the analysis for a board or a transaction?

Yes. The report, the model with its assumptions exposed, and the executive summary are written to be read by finance and a board, and to stand up to questions from a lender or the other side of a transaction. Confidentiality is covered by a mutual NDA before any data changes hands.

How do we start?

Send your infrastructure spend and the main workloads. You will hear back within 24 hours from the person who would run the engagement. If a placement change is not worth modeling, you will be told so.

Start With the Free Workload Review

Send your annual infrastructure spend, the main workloads and how steady each one is, and the decision in front of you. You'll hear back within 24 hours from the person who would run the engagement. If your infrastructure is already where it belongs, we will say so.

An answer either way.
Independent of every cloud, operator and vendor. A full engagement is a fixed fee agreed before work starts, and placement of any capacity you lease is paid by the provider.