POTS Replacement for Schools, Hospitals and Public Buildings
Fire Alarm, Elevator, Area of Refuge and Blue-Light Phone Lines for School Districts, Campuses, Health Systems and Government

Carriers are retiring copper building by building. When North Carolina's AT&T contract ended, the state published sample tariff rates of $2,460.12 a month per line, against $34.42 (may not reflect final pricing). We run the providers that fit at once and negotiate, at no cost to you.

Price My Campus Lines
Built for districts, campuses, health systems and agencies Every building and line type in one request No cost to you: the provider pays us
THE SHORT ANSWER
POTS replacement for schools, hospitals and public buildings means moving the copper lines behind fire alarm panels, elevator phones, areas of refuge, blue-light phones, alarms, fax and building systems onto cellular or IP service your fire marshal and elevator inspector will accept. A published 2026 price guide puts replacement at about $40 to $60 per line per month, so a district with 40 buildings and 300 lines is looking at roughly $12,000 to $18,000 a month (MCA calculation: 300 lines × $40 and × $60), with life-safety lines toward the top of that range or above it. Staying on copper is not a fixed price either (see North Carolina’s sample tariff rates below). We put your whole line list in front of the providers that fit at the same time and negotiate; the provider’s engineers survey and install, and the provider you choose pays us.

This page is for K-12 districts, colleges and universities, health systems, cities, counties and state agencies: organizations with multiple locations or 20 or more lines. A district with six schools or a county with a handful of buildings is as much the buyer here as a state university system. The hard part is not the device. It is finding every line, knowing which ones protect lives, getting each building signed off, and fitting the work around school calendars, patient care and board meetings. Our POTS line replacement guide covers the basics; this one covers public and institutional buildings.

COPPER LINES LEFT
15.0M
U.S. retail switched access lines at mid-2025, 8.6 million of them business lines
AT&T SHUTOFFS
Nov 15, 2026
the earliest date AT&T copper service can be discontinued in 18 approved states
NC SAMPLE TARIFF
$2,460.12
a month per POTS line in sample tariff rates, against $34.42 under contract; may not reflect final pricing
REPLACEMENT RANGE
$40 to $60
per line per month for POTS over cellular, from a published 2026 price guide

Sources: FCC, Voice Telephone Services: Status as of June 30, 2025 (lines left); Broadband Breakfast, January 13, 2026 (AT&T approval); North Carolina Department of Information Technology (sample tariff rates effective January 1, 2026; the state says they may not reflect final pricing and exclude surcharges and fees); replacement range sourced from AeroCom’s published price guide, August 2026.

How Many Copper Lines Does a School District Have?

More than most districts expect. Lines were added over decades by facilities, security, food service and the front office, often on different accounts. The chart is an illustrative inventory for a 40-building district. Your real count comes from your invoices and the provider’s site survey.

Illustrative school district: 40 buildings, 300 copper lines
Lines by type, with the monthly replacement cost at the published $40 to $60 per line range
Life-safety lines (152)Security, business and building lines (148)
LIFE SAFETY
Fire alarm panels40 panels, two lines each
80 lines: $3,200 to $4,800
Elevator emergency phonesOne line per car
36 lines: $1,440 to $2,160
Area of refuge stationsStairwells in multi-story schools
24 lines: $960 to $1,440
Blue-light and outdoor phonesStadiums, lots, bus loops
12 lines: $480 to $720
SECURITY, BUSINESS AND BUILDING SYSTEMS
Intrusion alarm panelsOne line per building
40 lines: $1,600 to $2,400
Front office and backup voiceLines that work in a power or network outage
40 lines: $1,600 to $2,400
FaxFront offices, nurse, food service
38 lines: $1,520 to $2,280
Boiler, generator and automation alarmsDial-out alarms and modems
30 lines: $1,200 to $1,800

Illustrative inventory, not a survey: the line counts are Metro Colo Advisory assumptions for a 40-building district (two lines per fire panel, as a traditional two-line fire alarm communicator uses, and one line per elevator car). Monthly figures are MCA calculations at the $40 to $60 per line per month range sourced from AeroCom’s published 2026 price guide. Life-safety lines often need dual-path service, battery backup and monitoring, so they can price above the range. Figures as of October 2026. Free to cite with a link to this page.

WHAT THAT MEANS
All 300 lines come to about $12,000 to $18,000 a month, or $144,000 to $216,000 a year. MCA calculation: 300 lines × $40 to $60 × 12 months. The same price guide says legacy copper lines often run over $100 per line per month once surcharges and fees are added; at that rate, 300 lines would cost more than $30,000 a month (MCA calculation: 300 × $100). Two things move the real number: lines nobody uses anymore, which only an inventory finds, and fire panels on two copper lines, which often move to one communicator with two paths where the fire marshal accepts it.
Replacing copper across a district or campus? Why talk to us before you call a provider
For organizations with multiple locations or 20 or more lines.
Every building, one request.
Your carrier’s own replacement is one option, not the only one. Your line list goes to the providers that fit, at the same time. Once you ask a provider for pricing directly, it usually will not register an advisor on the deal, and you negotiate alone.
Real totals, not a per-line headline.
Devices, battery backup, monitoring, installation and the term, per building and in total, so you compare what you will pay.
Sign-off planned in.
The provider’s engineers survey each building, and the plan accounts for the fire marshal, elevator inspector and monitoring company before any cutover.
No cost to you.
The provider you choose pays us, so it costs you nothing, and sending a list commits you to nothing. If you have one building and a couple of lines, your carrier’s own replacement may be the simplest answer, and we will say so.
No full line list yet? Send what you have. A recent phone bill or a list of building addresses is enough to start. You’ll hear back within 24 hours: we line up the providers that fit, and the provider’s engineers handle the site surveys.
If you have already spoken to one provider, tell us which; we can still run the rest of the market.

Which Copper Lines Do Schools and Hospitals Still Have?

Each line type has its own rule and its own sign-off. A POTS line is a plain old telephone service line: an analog copper line that carries its own power, which is why life-safety equipment was built around it.

LineWhat the rule saysUsual replacementWho signs off
Fire alarm communicatorEvery building with a monitored fire panelNFPA 72 (2013 edition, as summarized by North Carolina): a single communication path is supervised at least every 60 minutes; with multiple paths, each within 6 hours; shared equipment needs 24 hours of battery powerA dual-path communicator, usually cellular plus IP. See fire alarm phone line replacementThe fire marshal (the authority having jurisdiction) and your monitoring company
Elevator emergency phoneEvery carASME A17.1: two-way communication to a staffed location, at least 4 hours of auxiliary power, line verified automatically at least dailyA cellular or IP elevator line with battery backup, one per car. See elevator phone line replacementThe elevator inspector for your jurisdiction
Area of refugeStairwells and elevator lobbiesTwo-way communication to a fire command center or approved central point, with automatic dial-out where that point is not always staffedA cellular or IP voice path with battery backupThe building official or fire marshal
Blue-light emergency phonesCampus grounds and parkingNo building code requirement; North Carolina’s state construction office says they should be at least comparable to elevator two-way voiceA cellular line at each phone, or the campus network with backup powerCampus police or public safety, under your own policy
Intrusion and duress alarmsBurglar, panic and holdup buttonsNo building code requirement; set by your security standards and any program rulesA cellular alarm communicatorYour alarm monitoring company and security office
FaxCommon in healthcare and front officesNo code requirement; privacy rules apply to what is sentAn analog port on a replacement device, or fax over IPYour privacy or compliance office
Boiler, generator and building automation alarmsNo building code requirement; hospitals and nursing homes may have program rules for generator monitoringA cellular line, or a network connection to the automation systemFacilities, plus any certifying agency
Phone system trunksCopper lines, Centrex or PRI feeding a multi-line phone systemKari’s Law and RAY BAUM’S Act: direct 911 dialing, on-site notification and a dispatchable locationSIP trunks or hosted voice, with 911 tested at cutoverYour telecom team; FCC rules make whoever installs, manages or operates the system responsible

Sources: North Carolina State Construction Office, POTS Copper Telephone Line Replacement Service Requirements and Options (December 15, 2022; NFPA 72 2013 edition intervals, areas of refuge, blue-light phones, generator monitoring); ASME A17.1-2019 requirements summary (sections 2.27.1.1, 2.27.1.1.5 and 2.27.1.1.6); FCC, 911 requirements for multi-line telephone systems; Minnesota State Fire Marshal, Fire alarm transmission signals (NFPA 72 2016 edition paths).

Fire alarm panels are where most of the copper sits. Under the 2016 edition of NFPA 72, a communicator can use one phone line plus a second path that is not a phone line, such as cellular, radio or IP; VoIP is not recommended for fire alarm signals (Minnesota State Fire Marshal). The edition your state or city adopted applies, and the authority having jurisdiction accepts or rejects the replacement building by building, so confirm the approach before the first cutover. Our guides to fire alarm communicators under NFPA 72 and elevator emergency phones under ASME A17.1 go deeper. If the IP path rides your own network, bring your SD-WAN and firewall teams into the plan.

When Will Copper Phone Service End for Schools and Public Buildings?

In stages, carrier by carrier and wire center by wire center, and faster since 2026. On March 26, 2026, the FCC unanimously adopted Report and Order FCC 26-19, which ended its public notice and objection process for copper retirements, applied a 31-day automatic grant period to every carrier’s section 214 discontinuance application, and made state and local rules that keep legacy networks running after FCC approval subject to preemption (FCC press release).

AT&T’s January 2026 batch covers wire centers serving about 90,000 customers in 18 states, and customers were told copper landline service could be discontinued starting November 15, 2026 (Broadband Breakfast). That is when shutoffs can begin, not a single cutoff day.

Alabama Arkansas Florida Georgia Indiana Kansas Kentucky Louisiana Michigan Mississippi Missouri North Carolina Ohio Oklahoma South Carolina Tennessee Texas Wisconsin

The 18 states in AT&T’s January 2026 batch. Source: Broadband Breakfast, January 13, 2026.

DateWhat happenedWhat it means for a public building
January 12, 2026The FCC granted AT&T’s application automatically for wire centers in 18 statesBuildings served by those wire centers can lose copper service from November 15, 2026
March 26, 2026FCC 26-19 adopted: 31-day automatic grant for all section 214 discontinuance applicationsApprovals for every carrier can move faster, with no FCC objection process for copper retirements
August 10, 2026Verizon asked to discontinue legacy copper voice in Arizona, Delaware, New Jersey, New Mexico, Ohio, Rhode Island, South Carolina, Utah and VirginiaThe FCC removed it from automatic grant because it needs more time to review; it is not a final decision
August 21, 2026The FCC automatically granted Verizon’s July 7 application for former Frontier areas in eight states: Florida, Indiana, Minnesota, Nebraska, Nevada, North Carolina, Texas and WisconsinCustomer notices say service ends on or after November 16, 2026; plan around the date on your own notice letter
November 15, 2026The earliest date AT&T copper landline service can be discontinued in the 18-state batch’s wire centersFor school districts, this falls mid-semester; winter break is the next long install window
End of 2029AT&T plans to retire the large majority of its copper outside CaliforniaAT&T-served buildings outside California should plan on losing copper this decade

Sources: Broadband Breakfast (AT&T); FCC (FCC 26-19); Verizon’s July 7, 2026 application, as filed with the Florida PSC and Broadband Breakfast, September 29, 2026 (Verizon eight-state grant); Fierce Network, September 28, 2026 (Verizon nine-state request). The mid-semester and install window points are Metro Colo Advisory’s reading for school calendars.

Notice can be short. Industry analyses of the order put the gap between a customer notice and disconnection at as little as 90 days (source: vCom, July 16, 2026). A district with 40 buildings will not get one letter; it will get notices building by building as each wire center is filed, and surveys, sign-offs and board approvals across that many buildings can take longer than that. Our copper retirement tracker follows the AT&T, Verizon and Lumen filings as they are announced.

What Happens When a Public Agency’s Copper Contract Ends?

North Carolina is the clearest public example. AT&T did not renew the state’s TDM contract, which expired December 31, 2025, and the state’s IT department published sample tariff rates effective January 1, 2026. The state says the samples may not reflect final pricing and exclude regulatory surcharges and fees.

North Carolina: contract rate versus sample tariff rate
Monthly cost, each pair drawn to its own scale
ONE POTS LINE
Under the state contractExpired December 31, 2025
$34.42
Sample tariff rateEffective January 1, 2026
$2,460.12
A SITE WITH 5 POTS LINES
Under the state contractBefore taxes and fees
$172.10
Sample tariff rateBefore taxes and fees
$12,300.60

Source: sample tariff rates published by North Carolina’s state IT department, NCDIT, AT&T Sample Tariff Rates. The state says the samples may not reflect final pricing, and monthly pricing excludes regulatory surcharges and fees. Figures as of October 2026. Free to cite with a link to this page.

ServiceUnder the state contractSample tariff rate
POTS linePer line, per month$34.42$2,460.12
A site with 5 POTS linesPer month, before taxes and fees$172.10$12,300.60
One PRI with 23 channels and 50 numbersThe digital trunk behind many campus phone systems, per month$590.06$53,290.40

Source: sample tariff rates published by North Carolina’s state IT department, NCDIT, AT&T Sample Tariff Rates (the PRI sample is 23 channels at $2,305.80 plus 50 numbers at $5.14 each). The state says the samples may not reflect final pricing; the site examples exclude taxes and fees.

WHAT THAT MEANS
This is not a forecast of your bill; it is one state’s published sample for one carrier. It shows the direction of travel: once a negotiated contract ends, nothing holds a copper line at the contract rate. For a district, county or health system, the contract end date matters as much as the carrier’s notice, so have the replacement in place before it. The carrier’s own replacement is one option, not the only one.
Contract ending, or carrier notices arriving building by building?
Send the building list, what each line runs and your contract end dates before you sign an extension or request quotes. No full inventory? A recent phone bill or a list of addresses is enough to start. You’ll hear back within 24 hours, and the provider you choose pays us, so it costs you nothing. For organizations with multiple locations or 20 or more lines.
Price My Campus Lines

POTS Replacement for Hospitals and Health Systems

Hospitals have every line a school has, and one rule a school does not. North Carolina’s state construction office noted in December 2022 that healthcare facilities requiring federal certification under the 2012 Life Safety Code were required to be served by two individual copper POTS lines, and that the conflict with copper retirement has to be resolved with the certifying agency (NC State Construction Office). That makes the certifying agency a third sign-off, alongside the fire marshal and elevator inspector, to settle before a provider is chosen.

Fire alarm and the two-line rule

Agree the communicator design with the fire marshal and the certifying agency together, so one accepted design repeats across the campus.

Elevators, car by car

Patient towers and parking structures add up to dozens of cars, each needing a verified line, backup power and inspector acceptance, scheduled around patient transport.

Nurse call and medical alarms

Most nurse call runs inside the building, but some alarm and paging systems still dial out over a phone line. Find them before the copper goes.

Fax

Orders, referrals and records still move by fax. Each line moves to an analog port on a replacement device or to fax over IP, with your privacy office’s sign-off.

Generator and building alarms

No building code requires generator monitoring, but hospitals and nursing homes may have program rules that do. The replacement must report as reliably as the line it replaces.

Clinics and outpatient sites

Clinics are a multi-site portfolio of their own, often in leased space where the landlord owns the elevator and fire lines. Who owns each line decides who replaces it.

Outpatient networks behave more like a chain: our guide for retail and restaurants covers site-by-site rollouts, and the property management guide covers the landlord’s side.

Emergency Phone Line Requirements in Public Buildings

Three emergency phones are common in schools, campuses and hospitals, each under a different rule. Each call must reach a person, on power that outlasts an outage.

Emergency phoneThe call must reachPower and line checksRule
Elevator car phoneA location staffed by authorized personnelAt least 4 hours of auxiliary power; line verified automatically at least daily, with an audible and illuminated signal on failureASME A17.1, 2.27.1.1
Area of refuge stationA fire command center or approved central point; automatic dial-out where that point is not always staffedAudible and visible signals, with posted instructionsNC Building Code 1009.8; NFPA 72 24.5
Blue-light phoneCampus police or public safety dispatch, under your policyNo code requirement; North Carolina recommends matching elevator two-way voiceCampus policy

Sources: ASME A17.1-2019 requirements summary; NC State Construction Office (areas of refuge, blue-light phones). Requirements vary by the code edition your jurisdiction has adopted.

Area of Refuge Phone Line

An area of refuge is a protected space, usually in a stairwell or elevator lobby, where someone who cannot use the stairs waits for help. Where the central point the system calls is not always staffed, the North Carolina office describes a timed automatic dial-out to a monitoring location or 911. In a school that point is often the front office, empty at night and all summer, so get the dial-out path right.

Blue Light Emergency Phone Replacement

Blue-light phones sit outdoors across campuses, parking decks and stadiums, many still on copper buried years ago. Two questions decide the replacement at each phone: whether there is usable cellular signal at that pole, and whether the phone has power that survives an outage. The provider’s engineers check both during the survey; where signal is weak, the campus network with backup power may be the better path.

Kari’s Law and RAY BAUM’S Act Compliance When the Copper Goes

Schools, hospitals and government buildings usually run a multi-line telephone system with hundreds of desk phones behind it. When the copper, Centrex or PRI lines feeding it are replaced, two federal 911 rules come with the project, and the FCC’s rules apply to whoever installs, manages or operates the system.

LawWhat it requiresWhich systems and when
Kari’s LawDirect dialing and notificationAny user can dial 911 without a prefix or access code such as 9, and the system notifies a central location on-site or off-site when a 911 call is placedMulti-line systems manufactured, imported, offered for first sale or lease, first sold or leased, or installed after February 16, 2020
RAY BAUM’S Act, Section 506Dispatchable locationUnder the FCC’s rules, a dispatchable location goes with every 911 call: the street address plus details such as the room or floor needed to find the callerFor covered multi-line systems, on-premises fixed phones by January 6, 2021; on-premises non-fixed and off-premises devices by January 6, 2022 where technically feasible, otherwise location from a manual update by the user or other location information the rule allows

Sources: FCC, Multi-line Telephone Systems: Kari’s Law and RAY BAUM’S Act 911 requirements; 47 CFR 9.16; FCC, 911 dispatchable location.

WHAT THAT MEANS
A trunk cutover is where 911 routing breaks quietly. A district with 40 buildings needs each building, and each floor that matters, mapped to a dispatchable location, the notification routed to someone actually on site, and a test call from every building after cutover. Write those tests into the replacement contract and the cutover plan.

How Do Public Agencies Buy POTS Replacement?

The route depends on your state’s procurement rules and the size of the contract, so settle it before any provider is asked for a price. Four things shape the timeline.

A formal bid or RFP

Above your bid threshold, state or local rules usually require a competitive solicitation. The line inventory is the core of its scope.

State and cooperative contracts

Many states and purchasing cooperatives have already competed telecom contracts other public bodies can buy from. Whether you can use one depends on your rules and that contract’s terms.

Board approval cycles

Boards and commissions approve contracts on a meeting calendar. Count back from the install window: survey, quotes, legal review, the agenda deadline, the vote.

Funding and E-Rate

The FCC phased E-Rate support for voice services down to zero by funding year 2019, so do not budget replacement lines on E-Rate. Check the current eligible services list with your E-Rate team each funding year.

Sources for E-Rate: FCC Public Notice DA 18-789 (July 30, 2018), which says the FCC phased down voice support over four years and that voice services will no longer be supported by the E-Rate program in funding year 2019; the current list is on USAC’s E-Rate eligible services list page.

Tell us at the start which route your rules require. Where you can buy from an existing state or cooperative contract, or your rules allow a negotiated purchase, we run the providers that fit. Where your rules require an open bid, we will say so, and tell you where we can and cannot help. The provider you choose pays us, not your agency, and we can put that in writing for your procurement file on request. More on how we work.

Budget cycle or board vote ahead? Start with what you have.
A recent phone bill or a list of building addresses is enough, and sending it commits your agency to nothing. You’ll hear back within 24 hours: we line up the providers that fit, and the provider’s engineers handle the site surveys. Our help costs your district, campus or agency nothing. For organizations with multiple locations or 20 or more lines.
Price My Campus Lines
THE ROLLOUT

Rolling Out POTS Replacement Across Many Buildings

1
Inventory every line.
Start from every phone bill, then match each number to what it runs in each building. Lines nobody can match are candidates to cancel.
2
Sort by risk and by date.
Life-safety lines first, then buildings with notices, then contracts nearest their end date.
3
Agree the approach with each authority.
The fire marshal, the elevator inspector and, for hospitals, the certifying agency, before the first cutover, so one accepted design repeats across every building.
4
Survey signal and power.
The provider’s engineers check coverage where the equipment sits: basements, panel rooms, elevator machine rooms and each blue-light pole.
5
Schedule around the calendar.
School breaks; hospital change windows; testing windows with your fire alarm contractor and monitoring company.
6
Cut over in waves, test, then cancel.
A pilot building, then groups. Confirm alarms reach the monitoring station, elevator calls reach the staffed location and 911 works from each building. Cancel copper only after each building is accepted.

Five Mistakes Districts and Health Systems Make

Letting the notices set the schedule

Industry analyses put the gap between notice and disconnection at as little as 90 days. Waiting for building-by-building notices means replacing copper in a rush.

Replacing line for line

Some lines run nothing anymore, and a fire panel on two copper lines may move to one communicator with two paths. Ask what each line does first.

Buying building by building

Separate purchases leave different devices, terms and bills in every building. One request gets one price, one support desk and one schedule.

Assuming the carrier’s replacement is the only option

It is one option. The right answer depends on line types, signal at each building and what your authorities accept.

Leaving the sign-offs to install day

The fire marshal, elevator inspector and a hospital’s certifying agency each accept or reject the replacement. Finding out at final inspection means a second visit to every building.

How We Place POTS Replacement

1

You send the line list

Number of locations, lines per location, what each line runs (fire alarm, elevator, area of refuge, blue-light phone, alarm panel, fax, building systems, voice), your current monthly bill or a recent invoice, any carrier notice letters, and contract end dates. Don’t have it all? A recent phone bill or a list of addresses is enough to start.

2

We run the providers that fit, at once

The providers that suit your line types and buildings see the same request at the same time, so totals compare line by line. Our POTS replacement providers compared guide explains the categories.

3

The provider’s engineers survey the sites

The provider’s own team checks signal, power, panels and elevators building by building, answers the technical questions and installs. We do not install equipment, monitor alarms or sell hardware.

4

We negotiate and you sign

Price per line, devices, battery backup, monitoring, install windows, testing and the term, settled while still negotiable. You sign with the provider you choose.

5

The provider pays us

The provider you choose pays us, so it costs you nothing, and it does not change what you pay.

POTS Replacement for Schools and Hospitals: Frequently Asked Questions

What is POTS replacement for schools?

It is moving the copper phone lines behind a school’s fire alarm panels, elevator phones, areas of refuge, alarms, fax machines and building systems onto cellular or IP service. Each replacement has to meet the code for that line type and be accepted by the local authority, usually the fire marshal or elevator inspector. For a district, it is a portfolio project across every building rather than a single install.

Do schools still need copper phone lines for fire alarms?

No, but they need an approved communication path. Under the 2016 edition of NFPA 72, a fire alarm communicator can use one phone line plus a second path that is not a phone line, such as cellular, radio or IP, and other technologies that meet its performance requirements are allowed. Which edition applies depends on what your state or city has adopted, and your fire marshal decides what is accepted in each building.

How much does POTS replacement cost for a school district?

A published 2026 price guide puts POTS over cellular at about $40 to $60 per line per month. At that range, a district with 40 buildings and 300 lines would pay about $12,000 to $18,000 a month (MCA calculation). Fire alarm and elevator lines often need dual paths, battery backup and monitoring, so they can price above the range.

When will AT&T stop copper phone service to public buildings?

In AT&T’s January 2026 batch of wire centers across 18 states, copper landline service can be discontinued starting November 15, 2026. That is when shutoffs can begin, not one cutoff day. AT&T plans to retire the large majority of its copper outside California by the end of 2029.

Why do some hospitals need two POTS lines?

Because of the 2012 Life Safety Code. North Carolina’s state construction office noted in 2022 that healthcare facilities requiring federal certification under that code were required to be served by two individual copper POTS lines. With copper being retired, that conflict has to be resolved with the certifying agency, before a replacement provider is chosen.

Do blue light emergency phones need a phone line?

They need a reliable voice path, but it does not have to be copper. No building code covers blue-light phones, and North Carolina’s state construction office says they should be at least comparable to elevator two-way voice. Cellular works where each pole has usable signal and power that survives an outage.

What are the area of refuge phone line requirements?

An area of refuge needs two-way communication to a fire command center or an approved central point. Where that point is not always staffed, the system needs automatic dial-out to a monitoring location or 911. The signals must be audible and visible, and the building official or fire marshal accepts the replacement.

What is Kari’s Law compliance?

Kari’s Law requires multi-line telephone systems to let users dial 911 directly, with no prefix such as 9, and to notify a central location on-site or off-site when a 911 call is placed. It applies to systems manufactured, imported, first sold or leased, or installed after February 16, 2020. A replacement phone system installed now is covered.

What does RAY BAUM’S Act require for 911 calls?

Under the FCC rules implementing Section 506 of RAY BAUM’S Act, a dispatchable location must go with 911 calls: the street address plus details such as the room or floor needed to find the caller. For covered multi-line systems, on-premises fixed phones had to provide it automatically by January 6, 2021. Map each building and floor when the phone system trunks change.

Can school districts use E-Rate for POTS replacement?

Do not plan on it. The FCC phased out E-Rate support for voice services, and a 2018 FCC public notice says voice would no longer be supported starting in funding year 2019. Eligibility is set each funding year, so check the current eligible services list with your E-Rate team before budgeting.

Can a public agency use a cooperative contract for POTS replacement?

Often, if your state’s procurement rules and the contract’s terms allow it. Many states and purchasing cooperatives have already competed telecom contracts that other public bodies can buy from. Above your bid threshold without such a contract, a formal solicitation is usually required.

Who approves the replacement for fire alarm and elevator lines?

The local authority having jurisdiction. For fire alarm lines that is usually the fire marshal, alongside your monitoring company; for elevator phones it is the elevator inspector. Agree the approach with each before the first building is cut over.

When should a district schedule the cutover?

During school breaks, in waves, after a pilot building. Winter, spring and summer breaks give the long windows that fire alarm testing and elevator inspections need. Copper should be canceled only after each building is accepted.

What does it cost to work with Metro Colo Advisory?

Nothing. The provider you choose pays us, so it costs your district, campus or agency nothing, and it does not change what you pay. You do not need a finished inventory: a recent phone bill or a list of addresses is enough to start, and you’ll hear back within 24 hours.

Send the Line List Before You Request Quotes

Don’t have a full line list? Send what you have: a recent phone bill or a list of addresses is enough, and you’ll hear back within 24 hours. Order matters: once you ask a provider for pricing directly, it usually will not register an advisor, and you negotiate alone. If your carrier’s own replacement is right for your buildings, we will say so.

Every building and every line, in one request.
For organizations with multiple locations or 20 or more lines. The provider you choose pays us, so it costs you nothing. If you have already spoken to one provider, tell us which; we can still run the rest of the market.
Price My Campus Lines