Utah Data Centers
Salt Lake City Colocation, West Jordan and Bluffdale, the Eagle Mountain Campuses, and the NSA’s Utah Data Center

Utah combines low natural-disaster risk, a cool, dry climate and fast-growing wholesale campuses within about 6 ms of Las Vegas and Denver. We find the Salt Lake City space that fits your requirement and negotiate the terms, at no cost to you.

Price My Utah Requirement
For colocation, wholesale and recovery sites Space and power confirmed Paid by the provider, never by you
THE SHORT ANSWER
Utah data centers sit mostly along the Wasatch Front around Salt Lake City: a small downtown carrier market, large wholesale campuses in West Jordan and Bluffdale from Aligned, Novva and DataBank, and hyperscale campuses at Eagle Mountain from Meta and QTS. Utah has about 40 operating data centers with roughly 1.2 GW of capacity by one count, and far more planned. It is best known to searchers for the NSA’s Utah Data Center in Bluffdale, a government facility that is not open to colocation.

Most people searching for the Utah data center are looking for the NSA facility at Camp Williams, which is covered below. For companies, Salt Lake City is a useful Western market: cooler and drier than Phoenix, far from hurricanes and wildfire-prone coastlines, and close enough to Las Vegas, Denver, Phoenix and California to serve the whole region or act as their recovery site. This page covers the Salt Lake City data center market, the providers and campuses, what Utah colocation suits, and how to get space.

OPERATING
~40
data centers in Utah, about 1.2 GW (Cleanview)
PLANNED
~31 GW
across 29 announced projects, far more than will be built
NOVVA WEST JORDAN
100 acres
1.5 million sq ft planned, 250 kW to 30 MW deployments
LAS VEGAS AND DENVER
~6 ms
minimum round trip from Salt Lake City over fiber

Sources: Cleanview Utah tracker; Novva; latency is an MCA calculation from straight-line distance. As of October 2026.

Looking at Utah? Why talk to us before you call an operator
The right campus.
Downtown for interconnection, West Jordan and Bluffdale for wholesale and density, matched to your requirement.
Recovery planned.
Salt Lake City as a recovery site for California, Las Vegas, Phoenix or Denver, with distances and shared risks checked.
Power and density confirmed.
Which halls have energized power for your density on your date.
No cost to you.
The operator you choose pays us. Your rate is not marked up, and you'll hear back within 24 hours.

Salt Lake City Data Centers and Campuses

AreaWhat is thereBest for
Downtown Salt Lake CityDataBank SLC1 at 179 Social Hall Avenue, Flexential and Lumen sites, and carrier connectivityInterconnection and smaller retail deployments
West JordanAligned's Salt Lake City campus (SLC-01, 02 and 03), Novva's 100-acre campus, and Flexential's South Valley siteWholesale, high-density and growth space
BluffdaleDataBank's Granite Point campus with its own substationHigh-density and HPC colocation
Eagle MountainMeta's campus and QTS's campus under construction, with more plannedHyperscale, mostly single-tenant
Lindon and Utah CountyFlexential and smaller facilities between Salt Lake City and ProvoEnterprise colocation for the Silicon Slopes tech corridor
OPERATORS IN UTAH
AlignedNovvaDataBankFlexentialQTSMetaGoogle CloudLumenEdgeConneX

Facility details from Baxtel, Compute Atlas and operator sites. Google Cloud’s us-west3 region is in Salt Lake City.

Need space in Salt Lake City?
Send power, cabinet or megawatt count, connectivity needs and date. You'll hear back within 24 hours with the Utah buildings that fit.
Price My Utah Requirement

The NSA's Utah Data Center

The National Security Agency's Utah Data Center sits at Camp Williams in Bluffdale, south of Salt Lake City. Completed in 2014 at a reported cost of about $1.5 billion, it draws about 65 MW across four 25,000-square-foot data halls within a much larger complex, built to support the U.S. intelligence community's computing and storage needs. It is a government facility, not available for colocation. It is also why "Utah data center" draws thousands of searches a month, and why Bluffdale is home to commercial campuses too: the same land, power and fiber that drew the NSA drew DataBank's Granite Point campus nearby.

Novva, Aligned and DataBank

Novva Data Centers

A 100-acre campus in West Jordan with about 1.5 million square feet planned across four phases, supporting deployments from 250 kW to 30 MW. Novva secured about $2 billion in financing in 2025 to finish it.

Aligned Data Centers

A wholesale campus in West Jordan with several buildings (SLC-01, SLC-02 and SLC-03), designed for high-density and hyperscale tenants.

DataBank

The downtown SLC1 carrier hotel site plus the Granite Point campus in Bluffdale, which has a private power substation for high-density deployments.

Eagle Mountain and the Hyperscale Build-Out

Eagle Mountain, southwest of the metro, is where Utah's largest campuses are going: Meta's operational campus, QTS's campus under construction, and further planned parks. These are mostly single-tenant hyperscale projects, but they add fiber and power infrastructure that benefits the wider market.

Why Salt Lake City

Salt Lake City's reach across the West
Minimum round-trip latency over fiber, milliseconds
Las Vegas583 km
~5.8
Denver596 km
~6.0
Reno687 km
~6.9
Phoenix813 km
~8.1
Los Angeles933 km
~9.3
San Francisco964 km
~9.6
Seattle1,126 km
~11
Dallas1,608 km
~16

MCA calculation from straight-line distance, about 1 ms round trip per 100 km; real fiber routes are longer. Free to cite with a link to this page.

Climate

Cool, dry air allows more hours of outside-air cooling than hot or humid markets.

Natural hazards

Away from hurricanes and coastal wildfire risk. The Wasatch Fault does carry earthquake risk, so check each building's seismic design.

Recovery site

Far enough from California, Phoenix and Las Vegas to avoid their shared risks, close enough to replicate.

Tech workforce

The Silicon Slopes corridor between Salt Lake City and Provo supplies engineering talent.

What Utah Colocation Costs

Salt Lake City generally prices below California and comparably to other Western secondary markets, with large wholesale campuses keeping larger deployments competitive. Retail cabinets downtown cost more per kW than wholesale space in West Jordan or Bluffdale. Benchmarks are on the colocation pricing guide.

Who Utah Data Centers Suit

Western recovery sites

For primaries in California, Las Vegas, Phoenix or Denver.

Wholesale and AI tenants

Space and power at the West Jordan and Bluffdale campuses.

Silicon Slopes companies

Local tech companies moving out of server rooms or cloud. See cloud repatriation.

Regional enterprises

Utah and Mountain West companies needing reliable local colocation.

Utah and Other Markets

Salt Lake City pairs with Los Angeles, San Francisco, Phoenix and Denver for Western footprints and recovery, and with Texas and Chicago for national reach.

How We Find Space in Utah

1

You send the requirement

Power, cabinet or megawatt count, connectivity, cooling and date. You'll hear back within 24 hours.

2

We find what fits

Which Utah buildings have space and energized power for your density and date.

3

We negotiate and you sign

Rate, power, term and exit terms negotiated before you sign. The operator you choose pays us.

Frequently Asked Questions

What is the Utah Data Center?

Most often, the NSA's Utah Data Center at Camp Williams in Bluffdale, a government facility completed in 2014 that draws about 65 MW across four data halls. It is not available for colocation. Utah also has about 40 commercial data centers.

Where is the NSA data center in Utah?

At Camp Williams in Bluffdale, about 25 miles south of Salt Lake City.

How many data centers are in Utah?

About 40 operating data centers with roughly 1.2 GW of capacity by one count, mostly along the Wasatch Front, with many more announced.

Who are the main Salt Lake City data center providers?

Aligned and Novva in West Jordan, DataBank downtown and in Bluffdale, Flexential at several sites, Lumen downtown, QTS and Meta at Eagle Mountain, and Google Cloud's Salt Lake City region.

What is the Novva data center?

Novva's flagship campus in West Jordan: 100 acres with about 1.5 million square feet planned, supporting deployments from 250 kW to 30 MW, financed with about $2 billion in 2025.

What is at Eagle Mountain?

Meta's operational data center campus, a QTS campus under construction, and further planned hyperscale parks, mostly built for single large tenants.

Is Salt Lake City good for colocation?

For Western companies and recovery sites, yes: cool, dry climate, low hurricane and coastal wildfire risk, and about 6 ms to Las Vegas and Denver. Check seismic design, since the Wasatch Fault carries earthquake risk.

How much does colocation cost in Salt Lake City?

Generally below California and comparable to other Western secondary markets, with wholesale pricing driven by the large West Jordan and Bluffdale campuses. Quotes depend on power, cabinet count, term and connectivity.

Is Utah a good recovery site for California?

Often, yes. Salt Lake City is about 9 to 10 ms from Los Angeles and San Francisco, far enough to avoid California's earthquake and wildfire risks while close enough to replicate.

Does Utah have earthquake risk for data centers?

Yes. The Wasatch Fault runs along the Salt Lake valley, so modern facilities are designed to seismic codes. Ask each operator about its seismic design and the building's code year.

Can Utah data centers support AI and GPU racks?

Yes, at campuses built for density, including Aligned, Novva and DataBank's Bluffdale site. Confirm power per rack, cooling type and energization dates for liquid-cooled racks.

Is there a Google data center in Utah?

Google Cloud operates its us-west3 region in Salt Lake City, and Google has a site at Eagle Mountain.

What is the Silicon Slopes?

The tech corridor between Salt Lake City and Provo, home to software and tech companies that use the region's colocation and cloud capacity.

Salt Lake City or Las Vegas for colocation?

Las Vegas has Switch's large campuses and strong security branding; Salt Lake City has more operator choice and a cooler climate. They are about 6 ms apart, so many companies compare both.

Do you charge for finding Utah data center space?

No. The operator you choose pays us from its channel budget, and your rate is not marked up. You'll hear back within 24 hours.

Price Your Utah Requirement

Tell us power, cabinet or megawatt count, connectivity needs and date. You'll hear back within 24 hours from the person who will run your search. No cost, no obligation, and the operator you choose pays us.

Send it before you call an operator.
Once you have contacted an operator directly, it usually will not work through an advisor on your deal.
Price My Utah Requirement