Data Centers in Florida
Florida Colocation in Tampa, Orlando, Jacksonville and Lakeland, the Jacksonville Carrier Hotel, Hurricane Planning and Florida’s Data Center Rules

Beyond Miami, Florida’s data center markets are Tampa, Orlando and Jacksonville, where 421 West Church Street is North Florida’s carrier hotel and a landing point for subsea cables. We find the Florida space that fits your power, connectivity and date.

Price My Florida Requirement
For enterprises, networks and AI teams Power and terms checked before you sign Paid by the provider, never by you
THE SHORT ANSWER
Data centers in Florida sit in five main markets: Miami, the largest, plus Tampa with about 21 facilities, Orlando and Jacksonville with about 12 each, and Lakeland between Tampa and Orlando. Jacksonville’s 421 West Church Street is North Florida’s carrier hotel and a landing point for three subsea cable systems, with Cologix running the meet-me room and its JAX1 data center inside. Cologix also runs JAX2, a hurricane-rated enterprise and recovery site, and LAK1 in Lakeland; CoreSite runs a data center in Orlando; Flexential runs sites in Tampa and Jacksonville; and TierPoint runs a Jacksonville data center. Since August 1, 2025, Florida’s data center sales tax exemption applies only to facilities with 100 MW or more of IT load, and a 2026 law makes customers using 50 MW or more pay their full cost of power service.

Searches for Florida colocation and colocation in Tampa come from valuable buyers; advertisers pay up to about $21 a click. Most are Florida companies moving out of in-house server rooms, businesses that need a recovery site away from the coast or out of state, and networks connecting to Latin America through Jacksonville or Miami. This page covers Tampa, Orlando, Jacksonville and Lakeland, the partners in each, hurricane planning, Florida’s data center rules and how to get space at the right rate. For Miami, see our Miami colocation guide. If another market fits your requirement better, we will say so.

TAMPA
~21
data center facilities, the largest on the Gulf Coast
421 W CHURCH STREET
3
subsea cable systems landing at the Jacksonville carrier hotel
COLOGIX JAX2
125,000
square feet, hurricane-rated, in Jacksonville
TAX EXEMPTION
100 MW
minimum IT load since August 2025, up from 15 MW

Sources: market counts from our Miami market research; Baxtel and Cologix (Jacksonville); Cologix (JAX2); FloridaSalesTax.com (exemption). As of October 2026.

Florida Colocation: Where the Options Are

MarketPartner data centersBest for
JacksonvilleCologix JAX1 at 421 West Church Street, the carrier hotel, with 30+ networks in its meet-me room; Cologix JAX2 at 4800 Spring Park Road; Flexential at 4905 Belfort Road; TierPoint at 8324 Baymeadows WayInterconnection, subsea routes to Latin America, enterprise and recovery sites
TampaFlexential TPA03 at 8350 Park Edge Drive, among about 21 facilities in the marketGulf Coast enterprise colocation and recovery sites for South Florida
OrlandoCoreSite’s Orlando data center, among about 12 facilitiesCentral Florida companies, with less storm surge exposure than the coasts
LakelandCologix LAK1 at 2850 Interstate Drive, about 100,000 square feet in LakelandInland space between Tampa and Orlando
Miami, Boca Raton and Fort LauderdaleEquinix MI1 at the NAP of the Americas, plus South Florida capacityLatin America connectivity; see our Miami guide

Sources: Wikipedia, Data Center Map, Cloud and Colocation; our Miami and CoreSite research. We confirm availability and specifications on every search.

Florida’s data center thresholds, in megawatts
The size at which each rule applies
Sales tax exemption, nowsince August 1, 2025 (HB 7031)
100 MW
Large-load power rulesSB 484, effective July 1, 2026, and FPL’s tariff
50 MW
Sales tax exemption, before2017 to July 2025
15 MW

Sources: FloridaSalesTax.com; Ryan; Compute Law. The exemption also requires $150 million in cumulative investment. Figures as of October 2026. Free to cite with a link to this page.

Looking at Florida? Why talk to us before you call a provider
The right Florida market.
Jacksonville for networks, Tampa and Orlando for enterprise space, or a site out of state for recovery: we find which fits and who has room on your date.
Hurricane design checked.
Building ratings, flood exposure and power backup confirmed before you shortlist, not after.
Terms checked before you sign.
Rate, power, cross-connects, escalators and renewal terms negotiated up front.
No cost to you.
The provider you choose pays us. Your rate is not marked up, and you'll hear back within 24 hours.

Jacksonville Data Centers and 421 West Church Street

421 West Church Street in downtown Jacksonville is North Florida’s carrier hotel, home to the region’s largest concentration of internet and telecom companies. The building, owned by SBA Edge as the JAX NAP, hosts landing points for three subsea cable systems, AMX-1, PCCS and SAPL, which give direct fiber routes to Central and South America without passing through Miami. Cologix Jacksonville runs the meet-me room and its JAX1 data center there, with 30+ networks. Its JAX2 at 4800 Spring Park Road is a 125,000-square-foot, hurricane-rated enterprise and disaster recovery facility with access to 40+ carriers over a dark fiber ring back to 421 West Church. Cologix gained both through its 2014 purchase of Colo5. Flexential and TierPoint also run Jacksonville data centers. See Cologix data centers and data center connectivity.

Sources: Cologix, Cologix, Baxtel, Wikipedia, Data Center Map.

JACKSONVILLE
421 West Church StreetCologix JAX1 and the meet-me roomCologix JAX2, hurricane-ratedAMX-1, PCCS and SAPL subsea cablesFlexential JacksonvilleTierPoint Jacksonville

Tampa and Orlando Data Centers

Tampa data centers

Tampa is the largest market on Florida’s Gulf Coast, with about 21 facilities, often used as a primary site for central Florida companies or a recovery site for Miami. Flexential runs TPA03 at 8350 Park Edge Drive. For buyers searching colocation in Tampa, the main questions are power density, hurricane design and how far the building sits from the coast.

Orlando data centers

Orlando has about 12 facilities serving central Florida, with less storm surge exposure than the coasts. CoreSite Orlando is our partner’s presence there; see CoreSite data centers. Between Tampa and Orlando, Cologix Lakeland runs LAK1 at 2850 Interstate Drive, part of about 100,000 square feet of Cologix space in Lakeland.

Sources: Cloud and Colocation, Wikipedia; our Miami market research.

HURRICANE PLANNING
A single storm can affect much of Florida at once. Inside the state, look for hurricane-rated buildings away from storm surge, such as Cologix JAX2, and confirm fuel supply and generator runtime in writing. For a recovery site, many Florida companies choose a market outside the state, such as Atlanta, North Carolina or Texas, so one storm cannot hit both sites. See disaster recovery colocation.

Florida Data Center Rules: Taxes and Power

Current rule
Sales tax exemptionCovers equipment, building materials, infrastructure and electricity for qualifying data centers with at least $150 million in cumulative investment
100 MW thresholdSince August 1, 2025 (HB 7031), only data centers with 100 MW or more of critical IT load qualify, up from 15 MW, which rules out most Florida colocation buildings
Large load lawSB 484, effective July 1, 2026, sets rules for projects using 50 MW or more at one site and requires utility tariffs that make those customers bear their full cost of service; utilities file the tariffs by October 1, 2026
FPL large load tariffApplies to 50 MW or more of new or incremental load at an 85% load factor
Local dealsCities negotiate their own packages, such as Fort Meade’s approval in April 2026 of a 10-year tax break worth up to $150 million for a data center project

Sources: FloridaSalesTax.com, Ryan, Compute Law, Compute Law.

What matters for a colocation tenant: the sales tax exemption now reaches only the largest campuses, so most colocation buyers in Florida pay sales tax on equipment as usual, and the new power rules apply to developers and hyperscale users, not to cabinets and suites. See data center cost.

Placing GPUs or a large deployment in Florida?
Send the GPU model or megawatts, power per rack, location and date. You'll hear back within 24 hours. The provider you choose pays us, so it costs you nothing.
Price My AI Deployment

Florida Colocation Pricing

Florida pricing depends on the market and on how much storm protection you need. Space inside 421 West Church Street carries a premium for its networks and subsea routes, while hurricane-rated enterprise buildings and inland sites like Lakeland and Orlando price on power, density and resilience. Power per cabinet, term and cross-connects decide the rest. Providers do not publish list prices. Compare what you are offered with the ranges on our colocation pricing guide, and for a megawatt or more see wholesale colocation and the terms that matter in a data center lease.

Who Florida Colocation Suits

Florida enterprises

Healthcare, logistics, finance and corporate IT moving out of server rooms into hurricane-rated buildings.

Networks and Latin America routes

Carriers and content companies using Jacksonville’s subsea landings or Miami’s NAP.

Recovery sites

Inland Florida or out-of-state sites that keep one storm from hitting both. See compliance colocation.

AI and GPU teams

Dense deployments, often placed in Atlanta or Texas with a Florida node. See AI and GPU colocation and GPU rental.

Florida and Nearby Markets

For South Florida and Latin America connectivity, see Miami colocation. For more capacity, lower rates and lower hurricane exposure, the usual comparisons are Atlanta and North Carolina. For moving steady workloads off the public cloud, see cloud repatriation and hybrid cloud colocation.

How We Find You Space in Florida

1

You send the requirement

Market, power, cabinet count, the networks you need, recovery needs and date. You'll hear back within 24 hours.

2

We check what fits

Which Florida building has the space, power and hurricane design for your date, and whether a site outside Florida fits better.

3

We negotiate and you sign

Rate, power, cross-connects, term and exit terms negotiated before you sign. The provider you choose pays us.

BEFORE YOU CONTACT A PROVIDER
Once you have asked a provider for pricing directly, it usually will not register an advisor on your deal, and you negotiate alone. Send us the requirement first; if you have already spoken to a provider, tell us, and we can still run the rest of the market.

Frequently Asked Questions

What are the main data center markets in Florida?

Miami is the largest, followed by Tampa with about 21 facilities, Orlando and Jacksonville with about 12 each, and Lakeland between Tampa and Orlando.

What is 421 West Church Street in Jacksonville?

North Florida’s carrier hotel, owned by SBA Edge as the JAX NAP, with landing points for the AMX-1, PCCS and SAPL subsea cable systems. Cologix runs the meet-me room and its JAX1 data center there.

Where are Cologix’s Florida data centers?

JAX1 at 421 West Church Street and JAX2 at 4800 Spring Park Road in Jacksonville, and LAK1 at 2850 Interstate Drive in Lakeland.

What is Cologix JAX2?

A 125,000-square-foot, hurricane-rated enterprise and disaster recovery data center at 4800 Spring Park Road in Jacksonville, with access to 40+ carriers over a dark fiber ring to 421 West Church Street.

Is there a CoreSite data center in Orlando?

Yes. CoreSite runs a data center in Orlando, among about 12 facilities in the market.

Where is Flexential in Florida?

Flexential runs data centers in Tampa, including TPA03 at 8350 Park Edge Drive, and in Jacksonville at 4905 Belfort Road.

Is TierPoint in Jacksonville?

Yes. TierPoint runs a Jacksonville data center at 8324 Baymeadows Way.

Why is Jacksonville important for data centers?

Three subsea cable systems land at 421 West Church Street, giving direct routes to Central and South America without passing through Miami.

Does Florida have a data center sales tax exemption?

Yes, but since August 1, 2025, only data centers with 100 MW or more of critical IT load and at least $150 million in investment qualify, up from 15 MW, which rules out most colocation buildings.

What is Florida’s new data center power law?

SB 484, effective July 1, 2026, sets rules for sites using 50 MW or more and requires utility tariffs that make those customers pay their full cost of service, so the costs are not shifted to other ratepayers.

Should a Florida company put its recovery site outside Florida?

Often, yes. One hurricane can affect much of the state, so a recovery site in Atlanta, North Carolina or Texas keeps the same storm from hitting both sites.

How much does colocation in Tampa or Orlando cost?

Providers do not publish prices. Pricing depends on the building, power per cabinet, term, cross-connects and hurricane design. Our colocation pricing guide has current market ranges.

Can I get AI or high-density colocation in Florida?

High-density space is limited in Florida today, so larger AI requirements often look at Atlanta or Texas. We confirm which Florida buildings can take your rack density on your date.

Do you charge for finding Florida colocation?

No. The provider you choose pays us from its channel budget, and your rate is not marked up. You'll hear back within 24 hours.

Price Your Florida Requirement

Tell us the market, power, cabinet count, the networks you need and the date. You'll hear back within 24 hours with the Florida space that fits. No cost, no obligation, and the provider you choose pays us.

Send it before you call a provider.
Once you have contacted a provider directly, it usually will not work through an advisor on your deal.
Price My Florida Requirement